First Lithium Minerals Corp
Symbol FLM
Shares Issued 96,380,286
Close 2026-06-08 C$ 0.10
Market Cap C$ 9,638,029
Recent Sedar+ Documents

First Lithium samples 1,300 mg/L lithium at Ascotan

2026-06-09 13:04 ET - News Release

Mr. Rob Saltsman reports

FIRST LITHIUM REPORTS UP TO 1,300 MG/L LITHIUM IN BRINE SAMPLES AT ASCOTAN PROJECT

First Lithium Minerals Corp. has released the results of March, 2026, sedimentary brine geochemical exploration program conducted at the Ascotan project in the Salar de Ascotan, Antofagasta region, Chile.

The sedimentary brine geochemical exploration program was designed on a semi-systematic grid on the concessions of the project using a portable auger drill to collect intercepted brine samples. Drilling was designed to reach standardized sampling depths between 1.0 and 1.5 metres of the sedimentary zone. The surface exploration campaign was conducted using a portable drilling rig with a 76.2-millimetre (three-inch) diameter auger bit. The drilling method was selected to minimize disturbance of the halite/sediment matrix and ensure the representativeness of the recovered pore fluids.

Based on the results of two previously conducted geophysical surveys, preliminary hydrogeological modelling suggests a gradually increasing brine signature starting at approximately 200 metres beneath the surface with widths up to 400 metres reaching a consolidated lacustrine base or bedrock at approximately 600 metres at depth. Highly conductive zones of less than 1.0 Ohm-metre exhibited large extent and continuity in the northeastern sectors of the Ascotan project (reference press releases: "First Lithium Minerals Reports Positive Results from MT Survey," March 1, 2023, and "First Lithium Minerals Releases Results of Geophysical Surveys and Identifies Priority Targets," Dec. 13, 2022).

A total of 40 exploratory wells were drilled, with 20 wells reaching a shallow brine table allowing the accumulation and collection of representative brine samples for assaying, with the remaining wells not intersecting the shallow brine table due to permeability conditions that would impede the flow and capture of the brine. All holes that did not intercept the brine were in the eastern sectors of the salar where geophysical interpretation suggests a deeper aquifer table. The holes intercepting and accumulating brine were primarily located in the northern, central and southern sectors of the salar.

The collected brine samples were analyzed by an independent third party certified laboratory using specific methodologies for high-density brines (ICP-OES/MS) to determine the concentrations of lithium (Li), potassium (K), magnesium (Mg), boron (B) and associated elements. The data obtained confirmed the presence of a well-defined hypersaline hydrogeochemical system, significantly enriched in lithium, potassium and boron. The chemical characteristics are highly consistent with closed basin (endorheic) continental evaporitic environments, typical of the Andean salt flat (salar) deposits. The analyzed brine samples yielded lithium concentrations ranging from 93.5 mg/L (milligrams per litre) to 1,299.5 mg/L. A high-grade group was identified in samples SAL-06, SAL-07, SAL-09, SAL-10, SAL-16, SAL-17, SAL-18, SAL-19 and SAL-20, with values exceeding 300 mg/L lithium brine concentrations. Out of those, three samples reported over 1,000 mg/L lithium brine concentrations.

The geochemical data collected at the Ascotan project confirms the presence of a lithium-enriched continental brine system with a high potential within the evaluated concessions. The hydrogeochemical characteristics are exceptionally encouraging in the areas defined by samples SAL-16, SAL-17, SAL-18, SAL-19 and SAL-20, where the convergence of high lithium concentrations (greater than 1,100 mg/L) and moderate Mg/Li (manganese/lithium) ratios (eight to 10) reflects conditions consistent with economically viable salt flat (salar) deposits in South America.

Rob Saltsman, president and chief executive officer of the company, commented: "The brine samples collected from the shallow sediments using augur drill is nothing short of amazing. Over 1,100 mg/L are the highest lithium brine concentrations we have ever recorded at our project. We have always believed Ascotan is an exciting lithium exploration prospect and has geological signature and elements to become a potential future world-class lithium brine resource in Chile. Our team is excited to continue exploration work and begin test drilling as a next significant milestone."

The company is expecting to commence a 1,500-metre drilling program in H2 2026, conditional upon access to capital and obtaining required government permits, licences and community agreements.

QA/QC (quality assurance/quality control)

A semi-systematic grid sampling program was developed within the mining concessions of the Ascotan project, located in the Ascotan salar, in Antofagasta region, Chile. The surface exploration campaign was conducted using a portable drilling rig with a 76.2 mm (three-inch) diameter auger bit. This drilling method was selected to minimize disturbance of the halite/sediment matrix and ensure the representativeness of the recovered pore fluids. Brine samples were selectively collected at standardized depth intervals, from 1.0 m to 1.50 m below the surface crust. To prevent evaporation, cross-contamination or chemical alteration of the brines, the field technical team strictly followed the following sampling protocols. Sample volume and containment: a 100-millilitre aliquot of clear brine was collected from each borehole. The samples were stored in high-density polyethylene (HDPE) bottles, previously rinsed with the target brine. The bottles were filled completely (with no headspace) to minimize oxidation and potential mineral precipitation. Labelling and thermal preservation: each sample bottle was immediately sealed with a tamper-evident cap and labelled with a unique, sequential sample identification number. To maintain geochemical stability and suppress biological activity, the samples were stored in temperature-controlled refrigerated containers (portable coolers) at approximately four degrees Celsisu during field storage and transport. Documentation and georeferencing: the spatial co-ordinates of each sampling point were accurately recorded and verified using a GPS device (WGS84 datum). A complete photographic record of each site was also maintained, documenting the open pit, the recovered fluid and the sealed sample, ensuring a complete audit for quality control and assurance purposes. Chain of custody: the refrigerated containers remained under the strict supervision of the project geology team until their final shipment to the analytical laboratory, thus ensuring an unbroken chain of custody. The sampling was done in accordance with generally accepted industry standards, and included quality assurance and quality control (QA/QC) standard elements such as including duplicate, CRM (customer relationship management) and blank samples. Formal chain of custody documents was prepared for every sample obtained and submitted for laboratory analysis to AGS Laboratory, Avenida La Cantera 2270, Coquimbo, Chile (ISO/IEC NCh17025:2017 Standard and the ISO 900:2015 Standard). In the opinion of the QP, sample preparation, security, and analytical procedures were acceptable and results from the laboratory analyses are considered adequate.

Sedimentary brine samples are selective in nature and may not be representative of the overall mineralization or characteristics of the salar geology from which they were sampled.

About the Ascotan project

The Ascotan project comprises approximately 1,800 hectares of mineral exploration concessions located in the Salar de Ascotan in the Antofagasta region of northern Chile. Salar de Ascotan corresponds to a classic continental closed basin saline salar in the desert environment of the Andean Highlands of northern Chile, with approximately 1,757 square km of the basin area and 243 square km of surface area. Project area represented by soft and hard saline crusts and clay playas at the altitude of 3,716 msnm. Mineralization in the Salar de Ascotan project is primarily represented by different fractions comprised of chloride and sulphate brines, dendritic material, consisting of sand, silt and clay intercalated in the salar sediments, and various precipitated salt compounds. The project has a well-developed infrastructure and is accessed 150 km from the town of Calama, Chile, via Highway 21 which runs along the western side of the salar. The railway Ferrocarril de Antofagasta a Bolivia (FCAB) that passes through the nearby town of Ollague forms the major transportation corridor between the port city of Antofagasta, Chile, and the capital city of Bolivia, La Paz. Multiple operating copper mines in the area supplement access to power grid, mining expertise and qualified labour force. The results of two extensive geophysical surveys developed a preliminary hydrogeological model suggesting a gradually increasing brine signature starting at approximately 200 m beneath the surface with widths up to 400 m reaching a bedrock at approximately 600 m at depth. The company received environmental approvals and signed co-operation agreement with the local indigenous community. Based on the priority drill targets assessment, the company is planning to proceed to its inaugural brine resource exploration program in the northeastern property area of the salar. In 2024, the Chilean government through the National Lithium Strategy identified and approved Salar de Ascotan as a priority salar for lithium exploration and exploitation, aiming to strengthen Chile's position in the global lithium market.

About First Lithium Minerals Corp.

First Lithium Minerals is a Canadian mineral exploration and development company. The company is exploring for lithium and alkali metals at its 100-per-cent-owned Ascotan project comprising approximately 1,800 ha of mineral exploration concessions at the Salar de Ascotan in the Antofagasta region of northern Chile. Two property-wide geophysical surveys identified priority exploration drill targets for potential brine mineralization. The company is currently planning its inaugural drilling program pending obtaining required permits, licences and agreements. The company is also exploring for gold and critical metals at its 100-per-cent-owned Lidstone project comprising 10,000 ha of mining claims in Northwestern Ontario, Canada.

Qualified person

Aldo Moreno Salinas, the vice-president of exploration for First Lithium Minerals and the qualified person (QP) as defined by National Instrument 43-101, has reviewed and approved the technical content of this press release. Mr. Moreno is a seasoned geologist with 40 years of experience in exploration and evaluation of metallic and non-metallic mineral deposits, has a degree in geology from Universidad de Chile, is a member of the Chilean Professional Association of Geologists No. 437 and registered in the Public Records of Competent Persons No. 328.