07:45:06 EDT Tue 18 Aug 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Ashley Gold Corp. - Common Shares
Symbol ASHL
Shares Issued 101,568,386
Close 2026-08-17 C$ 0.06
Market Cap C$ 6,094,103
Recent Sedar+ Documents

ORIGINAL: Ashley Gold Corp. Cuts 0.729 g/t Au over 38.75 m From 19.50 m Downhole, Including 1.430 g/t Au over 17.00 m from 30.00 m Downhole in TAK-26-08, Confirms Visible Gold in System, 9.200 g/t Au over 0.5m at 45.25 m

2026-08-18 07:01 ET - News Release

(via TheNewswire)

Ashley Gold Corp.
  

CALGARY, ALBERTA – TheNewswire - August 18, 2026 - Ashley Gold Corp. (CSE: “ASHL”) (“ Ashley ” or the “ Company ”) is pleased to provide an update on assays from Phase II drilling.

 

Drill Assay Positioning

  • 10 holes from both Phase II and III drilling remain pending.  

 

Summary

 

Table 1: Assay Summary

 

President Noah Komavli; “Prior operators were unable to ascertain the dip of the system. TAK-26-08 was the first northern hole drilled in the 67Z and provided invaluable information, giving us confidence of a shallow Northern dip. In Phase III drilling, all holes were oriented South, delivering a better representation of the system. These early results reinforce the 67Z geophysical signature as high-priority and confirm high-grade visible gold near the surface. With our modelled dip now established, we are positioned for more effective future drilling.”

 


Data


Click Image To View Full Size

 

Figure 1: Cross Section of 67Z


Click Image To View Full Size

 

Figure 2: Area of Drilling - Plan View

 


Click Image To View Full Size

 

Figure 3: 30.00 to 32.50 m Zone of Interest and Visible Gold in Representative Samples *[3.125 g/t Au over 2.50 m from 30.00 m]*

 


Click Image To View Full Size

 

Figure 4: Core Boxes Showing 38.75 to 45.75 m Zone of Interest with 9.2 g/t Au over 0.5 m, Visible Gold Occurrence in Representative Sample *[2.179 g/t Au over 7.00 m from 38.75 m]*

 


Click Image To View Full Size

 

Table 2: TAK Drill Hole Data

 

Assays

 

Hole ID

Sample ID

From (m)

To (m)

Length (m)

Au (ppb)

TAK-26-08

2,416,709

4.00

5.50

1.50

26.00

TAK-26-08

2,416,711

5.50

7.00

1.50

24.00

TAK-26-08

2,416,712

7.00

8.00

1.00

17.00

TAK-26-08

2,416,713

8.00

9.50

1.50

7.00

TAK-26-08

2,416,714

9.50

11.00

1.50

78.00

TAK-26-08

2,416,715

11.00

12.00

1.00

14.00

TAK-26-08

2,416,716

12.00

13.50

1.50

< 5

TAK-26-08

2,416,717

13.50

15.00

1.50

20.00

TAK-26-08

2,416,718

15.00

16.00

1.00

106.00

TAK-26-08

2,416,719

16.00

17.00

1.00

37.00

TAK-26-08

2,416,721

17.00

18.00

1.00

129.00

TAK-26-08

2,416,722

18.00

19.50

1.50

98.00

TAK-26-08

2,416,723

19.50

21.00

1.50

489.00

TAK-26-08

2,416,724

21.00

22.25

1.25

349.00

TAK-26-08

2,416,725

22.25

22.75

0.50

47.00

TAK-26-08

2,416,726

22.75

24.00

1.25

257.00

TAK-26-08

2,416,727

24.00

25.50

1.50

186.00

TAK-26-08

2,416,728

25.50

27.00

1.50

59.00

TAK-26-08

2,416,729

27.00

28.50

1.50

91.00

TAK-26-08

2,416,731

28.50

30.00

1.50

58.00

TAK-26-08

2,416,732

30.00

31.00

1.00

3460.00

TAK-26-08

2,416,733

31.00

32.50

1.50

2950.00

TAK-26-08

2,416,734

32.50

33.50

1.00

12.00

TAK-26-08

2,416,735

33.50

34.50

1.00

24.00

TAK-26-08

2,416,736

34.50

35.75

1.25

127.00

TAK-26-08

2,416,737

35.75

37.25

1.50

58.00

TAK-26-08

2,416,738

37.25

38.75

1.50

426.00

TAK-26-08

2,416,739

38.75

40.00

1.25

2620.00

TAK-26-08

2,416,741

40.00

41.00

1.00

2890.00

TAK-26-08

2,416,742

41.00

42.00

1.00

858.00

TAK-26-08

2,416,743

42.00

43.00

1.00

3040.00

TAK-26-08

2,416,744

43.00

44.00

1.00

317.00

TAK-26-08

2,416,745

44.00

45.25

1.25

217.00

TAK-26-08

2,416,746

45.25

45.75

0.50

9200.00

TAK-26-08

2,416,747

45.75

47.00

1.25

202.00

TAK-26-08

2,416,748

47.00

48.50

1.50

46.00

TAK-26-08

2,416,749

48.50

50.00

1.50

91.00

TAK-26-08

2,416,751

50.00

51.00

1.00

69.00

TAK-26-08

2,416,752

51.00

52.00

1.00

33.00

TAK-26-08

2,416,753

52.00

53.00

1.00

69.00

TAK-26-08

2,416,754

53.00

54.00

1.00

219.00

TAK-26-08

2,416,755

54.00

55.50

1.50

385.00

TAK-26-08

2,416,756

55.50

56.75

1.25

324.00

TAK-26-08

2,416,757

56.75

58.25

1.50

180.00

TAK-26-08

2,416,758

58.25

59.50

1.25

91.00

TAK-26-08

2,416,759

59.50

60.85

1.35

47.00

TAK-26-08

2,416,761

60.85

62.25

1.40

89.00

TAK-26-08

2,416,762

62.25

63.35

1.10

131.00

TAK-26-08

2,416,763

63.35

64.35

1.00

294.00

TAK-26-08

2,416,764

64.35

65.35

1.00

125.00

TAK-26-08

2,416,765

65.35

66.85

1.50

31.00

TAK-26-08

2,416,766

66.85

67.75

0.90

251.00

TAK-26-08

2,416,767

67.75

69.25

1.50

188.00

TAK-26-08

2,416,768

69.25

70.25

1.00

6.00

TAK-26-08

2,416,769

70.25

71.50

1.25

7.00

TAK-26-08

2,416,771

71.50

72.00

0.50

33.00

TAK-26-08

2,416,772

72.00

73.50

1.50

< 5

TAK-26-08

2,416,773

73.50

75.00

1.50

14.00

TAK-26-08

2,416,774

75.00

76.50

1.50

6.00

TAK-26-08

2,416,775

76.50

78.00

1.50

< 5

TAK-26-08

2,416,776

78.00

79.50

1.50

< 5

TAK-26-08

2,416,777

79.50

81.00

1.50

5.00

TAK-26-08

2,416,778

81.00

82.50

1.50

< 5

TAK-26-08

2,416,779

82.50

84.00

1.50

< 5

TAK-26-08

2,416,781

84.00

85.50

1.50

< 5

TAK-26-08

2,416,782

85.50

87.00

1.50

< 5

TAK-26-08

2,416,783

87.00

88.50

1.50

< 5

TAK-26-08

2,416,784

88.50

90.00

1.50

< 5

TAK-26-08

2,416,785

90.00

91.00

1.00

< 5

TAK-26-08

2,416,786

91.00

92.00

1.00

< 5

TAK-26-08

2,416,787

92.00

93.00

1.00

6.00

TAK-26-08

2,416,788

93.00

94.50

1.50

< 5

TAK-26-08

2,416,789

94.50

96.00

1.50

< 5

TAK-26-08

2,416,791

96.00

97.50

1.50

38.00

TAK-26-08

2,416,792

97.50

98.50

1.00

20.00

TAK-26-08

2,416,793

98.50

100.00

1.50

< 5

TAK-26-08

2,416,794

100.00

101.50

1.50

< 5

TAK-26-08

2,416,795

101.50

102.00

0.50

< 5

TAK-26-08

2,416,796

102.00

103.50

1.50

11.00

TAK-26-08

2,416,797

103.50

104.50

1.00

6.00

TAK-26-08

2,416,798

104.50

106.00

1.50

7.00

TAK-26-08

2,416,799

106.00

106.50

0.50

12.00

TAK-26-08

2,416,801

106.50

107.50

1.00

12.00

TAK-26-08

2,416,802

107.50

109.00

1.50

10.00

TAK-26-08

2,416,803

109.00

110.00

1.00

7.00

TAK-26-08

2,416,804

110.00

111.00

1.00

11.00

TAK-26-08

2,416,805

111.00

112.00

1.00

7.00

TAK-26-08

2,416,806

112.00

113.00

1.00

27.00

TAK-26-08

2,416,807

113.00

114.50

1.50

6.00

TAK-26-08

2,416,808

114.50

116.00

1.50

8.00

TAK-26-08

2,416,809

116.00

117.50

1.50

50.00

TAK-26-08

2,416,811

117.50

118.25

0.75

17.00

TAK-26-08

2,416,812

118.25

119.00

0.75

11.00

TAK-26-08

2,416,813

119.00

120.00

1.00

7.00

TAK-26-08

2,416,814

120.00

121.00

1.00

8.00

TAK-26-08

2,416,815

121.00

122.00

1.00

26.00

TAK-26-08

2,416,816

122.00

123.50

1.50

< 5

TAK-26-08

2,416,817

123.50

125.00

1.50

7.00

TAK-26-08

2,416,818

125.00

126.50

1.50

53.00

TAK-26-08

2,416,819

126.50

128.00

1.50

22.00

Table 3: TAK-26-08 Sample Assays

  

Tak Project - Background

 

Situated abutting the Northeast of the Goliath Gold Complex, the Tak Patents have been the subject of intermittent exploration efforts from the 1900’s, with legendary companies like Lac Minerals (Barrick) and Cominco (Teck) exploring in and around the patented ground. At least two surveys were flown, with the most detailed mapping occurring in the late 1900’s. Within the patented boundary, only 11 historic holes were ever recorded from two operators - in 1999 and 2002. After 2002, the project sat idle for 24 years until acquired by the Company.

 


Click Image To View Full Size

 

Figure 5: Regional Map and Area of Activity

 

In 2026, mere weeks after acquisition, Ashley commissioned the first modern IP survey. The results highlighted a +1km resistive body, with two main chargeable units flanking the resistive body to the North. Ashley engaged 518 Drilling Ltd., deploying equipment into the patents for continued use. Guided in part from historic records and Phase 1 drilling results, three high priority zones have emerged.

 

Exploration Zones

 

D99Z:

In early 2026, a 5 hole, first phase program was successful in validating and expanding 1999 results. The zone was given the moniker “D99Z ”. With the final two holes still pending from Phase 1 drilling, the surface mineralization width in the D99Z is already estimated at +80m.

 

67Z:

Two holes carried out in 2002 included TAK-02-06 and TAK-02-07, intercepting 3.08 g/t Au over 7.57 m (incl. 7.0 g/t Au over 1.1 m) and 3.18 g/t Au over 8.7 m (incl. 9.67 g/t Au over 0.8 m), respectively (Southern Rio, 2002). These intercepts were some of the best in recorded history on the Tak Patents, and the area was given the title “67Z ” by Ashley. In Phase 2 drilling, Ashley deployed 3 holes on IP line 250 to target the zone and collect data on lithologies, as well as dip. TAK-26-08 was the first hole collared North, intercepting two zones of visible gold, assaying 0.729 g/t Au over 38.75m (incl. 0.961 g/t Au over 27.50m, incl. 1.43 g/t Au over 17.00m, incl. 9.200 g/t Au over 0.5 m).

 

NTZ:

The Northern Trench Zone (“NTZ” ) comprises five trenches, up to 2m wide, 2m deep and some as long as 60m. This area has no drilling records, yet was worked vigorously, as evidenced by the scale of the trench networks. Ashley discovered a high-grade gold zone through prospecting, sampling up to 398 g/t Au.  

  

Tak History

 

January 1940s - Long Lac Minerals (Mosher Long Lac Gold Mines Ltd.), extensive surface trenching (trenches up to 70 m long) on the Tak Grid targeting gold mineralization in quartz-feldspar porphyry (QFP); followed by 1948 magnetometer survey. MDI .

 

1980 - Cominco, geological mapping, rock sampling, and magnetometer survey over the property identifying porphyry-hosted gold potential. MDI .

 

1998-1999 - Triex Resources, acquired the Tak Patents; conducted prospecting, sampling, trenching (assays 1,100–29,790 ppb Au), and drilled 10 DDH (~1,558 m total), including TAK-99-10 returning 2.082 g/t Au over 31.83 m from 3.57–35.40 m (incl. 11.778 g/t Au over 2.88 m and 7.632 g/t Au over 1.10 m); outlined stockwork quartz-carbonate veining in silicified/carbonatized QFP ; MDI .

 

2002 - Southern Rio Resources, optioned the property from Triex and drilled 8 DDH (~1,209 m) on the Tak Grid; outlined gold mineralization over ~350 m strike length to ~100 m depth with stockwork veining, visible gold noted, and intercepts including TAK-02-06: 3.08 g/t Au over 7.57 m (plus 7.0 g/t Au over 1.1 m) and TAK-02-07: 3.18 g/t Au over 8.7 m (incl. 9.67 g/t Au over 0.8 m). Southern Rio AFRI report.

 

January 6, 2026 - Ashley Gold Corp., acquired 100% ownership of the Tak Patents (part of Burnthut Project, ~100 ha patented ground adjoining NexGold Goliath-Gold Complex) via all-stock deal from for 3.5M shares; consolidates historical data showing bulk-tonnage QFP-hosted gold potential open in all directions; 5% NSR to Royal Gold Inc. (2.5% buyback for $1M).

 

February 10, 2026 - Ashley Gold Corp., announced operational readiness for winter drilling campaign on Tak Patents and engagement of Abitibi Geophysics for first-ever modern OreVision IP survey to refine targets and twin historic holes.

 

March 14, 2026 - Ashley Gold Corp., provided interim IP data revealing 1 km resistive trend on Tak Patents aligning with historic gold zones and abutting NexGold Goliath-Gold Complex.

 

April 2–10, 2026 - Ashley Gold Corp., completed mobilization to site (drill trails, 10+ pads, rig and skidder in place) and announced crew mobilization/drilling kick-off for Phase 1 program targeting validation of historic D99Z zone and extensions .

 

April–May 2026 - Ashley Gold Corp., completed Phase 1 diamond drilling (5 holes: TAK-26-01 to TAK-26-05) as twins/fans to historic holes; core logging/cutting showed strong alteration, pyrite, and quartz-carbonate veining with multiple visible mineralization examples; equipment left on site for Phase 2.

 

May 14, 2026 - Ashley Gold Corp., reported first Phase 1 assay (TAK-26-01): 1.104 g/t Au over 28 m from collar (incl. 1.662 g/t Au over 12 m), confirming and validating historic near-surface mineralization in D99Z zone; mineralization starts at surface with strong continuity of grade within interval.

 

May 20, 2026 - Ashley Gold Corp., reported TAK-26-02 assays: multiple gold intervals including 0.586 g/t Au over 34.2 m from surface within 194.1 m of anomalous gold mineralization, further confirming broad width and continuity of the mineralized D99Z stockwork system south of TAK-26-01.

 

June 4, 2026 - Ashley Gold Corp., reported TAK-26-03 assays: multiple gold intervals including 2.347 g/t Au over 4.35 m within 156.5 m of anomalous gold mineralization, further confirming broad width and continuity of the mineralized D99Z stockwork system south of TAK-26-01.

 

Quality Assurance / Quality Control

The Company utilizes a drill rig recovering NQ core. All core is sealed in the field by the drill contractor and transported to the core logging facility. Core is then teched and logged by the Company geologist. Prior to geological logging and cutting, all core is systematically inspected and pieced back together until interlocked, depth measurements completed, RQD/Recovery measured, photographed dry and wet, and magnetic susceptibility measurements are taken. Sample intervals are then marked by grease pencil and flagged using ActLabs sample tags. QAQC check samples are inserted every tenth sample consisting of either a blank substrate material, OREAS gold certified standard, or a duplicate is done by quarter cutting the previous sample interval and submitting the other quarter material as the QAQC sample. All samples are cut using a wet saw and placed in pre-labelled sample bags pertaining to the sample interval. When a sample interval is complete, the assay card is added to the respective sample bag and the bag is securely sealed while the matching waterproof tag is permanently stapled into the core box at the end of the sample interval. Rice bags are labelled with the company name, submission batch number, range of sample numbers contained, total number of samples, and rice bag number and range. The secured sample bags are then placed into the rice bags pertaining to the range labelled on the rice bag and then securely fastened with zip ties. Rice bags are stored in a secured shipping container until Company contractors transport completed holes to ActLabs in Dryden, ON for 1A2 Au fire assay.

A sample size of 5 to 50 grams can be used but the routine size is 30 g for rock pulps, soils, or sediments (exploration samples). The sample is mixed with fire assay fluxes (borax, soda ash, silica, litharge) and with Ag added as a collector and the mixture is placed in a fire clay crucible. The mixture is then preheated at 850°C, intermediate 950°C and finish 1060°C with the entire fusion process lasting 60 minutes. The crucibles are then removed from the assay furnace and the molten slag (lighter material) is carefully poured from the crucible into a mould, leaving a lead button at the base of the mould. The lead button is then placed in a preheated cupel which absorbs the lead when cupelled at 950°C to recover the Ag (doré bead) + Au. overlimits are run under 1A3 with gravimetric finish.

All geological samples from the drilling program were subjected to a rigorous QA/QC program under the supervision of the designated Qualified Person (QP). Samples were securely transported from the project site in sealed bags directly to the Activation Laboratories (ActLabs) facility for preparation and analysis.

Analytical Procedures

  • Primary Gold Analysis (Code 1A2): All samples were pulverized and analyzed for gold content using Actlabs method Code 1A2. This procedure utilizes a standard lead-collection Fire Assay (FA) on a 30-gram sample charge, followed by digestion and an Atomic Absorption Spectrometry (AAS) finish. The lower detection limit for this method is 5 ppb. 

  • Over-Limit Check Analysis (Code 1A3): For any sample returning a gold value exceeding 5.0 g/t Au under the Code 1A2 method, an automatic over-limit check was triggered. These high-grade samples were re-assayed via Actlabs method Code 1A3, utilizing a lead-collection Fire Assay followed by a direct Gravimetric (GRA) finish on a separate 30-gram charge to ensure absolute analytical accuracy for ore-grade mineralization. 

Laboratory Accreditation & Quality Monitoring

Actlabs is an independent commercial laboratory accredited to ISO/IEC 17025 standards. In addition to the laboratory's internal QA/QC protocols (including systematically inserted blanks, duplicate samples, and certified reference materials), Ashley Gold Corp. strictly implemented its own independent QA/QC program. This included the regular insertion of certified reference standards (CRMs), field duplicates, and coarse blanks into the sample stream to independently monitor and verify laboratory precision and accuracy.

The QP has reviewed the QA/QC data from Ashley Gold Corp. and confirms that the sample preparation, security, and analytical procedures meet or exceed industry best practices and standard guidelines, and that the resulting assay data is considered reliable for resource modeling and exploration reporting.

NI 43-101 Disclosure

The technical information in this news release was reviewed and approved by Shannon Baird, P.Geo., a Qualified Person as defined in National Instrument 43-101. Mr. Baird is Exploration Manager of Ashley Gold Corp. and registered as a Professional Geoscientist with the Professional Geoscientists of Ontario as well as the Engineers and Geoscientists of British Columbia.

Some results discussed in this document are historical. Ashley Gold Corp. nor the qualified person have performed sufficient work or data verification of the historical data. Although the historical results may not be reliable, the Company nevertheless believes that they provide an indication of the Project's potential and are relevant for any future exploration program.

 

ABOUT ASHLEY GOLD CORP.

Ashley Gold Corp. is a Canadian mineral exploration company focused on acquiring and developing highly prospective gold and polymetallic deposits in Canada’s top mining regions. The Company’s flagship assets are in the Dryden Area in Ontario with a 100% ownership in Burnthut (including Tak Patents), Howie, Alto-Gardnar claims as well as in British Columbia with the Icefield Portfolio having two highly prospective claim packages, which are out under option.

 

For more information, please refer to the Company’s information available on SEDAR+  (www.sedarplus.ca), or visit us at www.ashleygoldcorp.com .

 

Contact Information

On behalf of the Board of Directors,

 

Noah J. Komavli, P.Eng, President, Director

 

C: (647) 567-9840

E: info@ashleygoldcorp.com
X: KKomavli

 

-Or-

 

Darcy Christian, P.Geo, CEO

C: (587) 777-9072

E: dchristian@ashleygoldcorp.com

  

Connect With Ashley:

www.ashleygoldcorp.com

X: https://x.com/AshleyGoldCorp

 

Forward-Looking Statements

This news release includes certain “forward-looking statements” which are not comprised of historical facts. Forward-looking statements are based on assumptions and address future events and conditions, and by their very nature involve inherent risks and uncertainties. Although these statements are based on currently available information, Ashley Gold Corp. provides no assurance that actual results will meet management’s expectations. Factors which cause results to differ materially are set out in the Company’s documents filed on SEDAR+ ( www.sedarplus.ca ). Undue reliance should not be placed on “forward-looking statements.”

Copyright (c) 2026 TheNewswire - All rights reserved.

© 2026 Canjex Publishing Ltd. All rights reserved.