22:46:01 EDT Tue 06 Oct 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Astra Exploration Inc
Symbol ASTR
Shares Issued 137,435,050
Close 2026-10-06 C$ 0.35
Market Cap C$ 48,102,268
Recent Sedar+ Documents

Astra Exploration outlines gold target at Don Mario

2026-10-06 18:45 ET - News Release

Mr. Brian Miller reports

ASTRA DEFINES A LARGE, DRILL-READY HIGH SULPHIDATION GOLD TARGET AT DON MARIO IN CHILE

Astra Exploration Inc. has provided results of the exploration activities at the Don Mario high-sulphidation epithermal (HSE) gold project in the Maricunga district of northern Chile.

Astra's chief executive officer, Brian Miller, commented: "Astra has a unique portfolio of exploration properties in Argentina and Chile and recently has taken the opportunity to advance Don Mario to the drill stage. The combination of outcropping gold mineralization with a large alteration zone and overlapping geophysical and geochemical targets makes for a compelling large-scale HSE target in the Maricunga belt -- a belt known to produce several world-class gold mines. We intend to proceed and drill the project in the coming months with a 2,000-3,000-metre fully financed program and are pleased to add this discovery opportunity to our large flagship La Manchuria drilling program."

Astra's exploration director, Diego Guido, commented: "The different exploration tools used at Don Mario have significantly improved our understanding of this large high-sulphidation target, vectoring toward the prospective portions of the system. The distribution of the gold-silver surface anomalies into silicified diatreme breccias, together with the deeper resistive anomaly identified by the CS-NSAMT survey, suggests that the system may preserve both shallow disseminated mineralization and deeper feeder structures."

Don Mario exploration results

The company has received the results of a low-cost exploration program completed at the Don Mario project (see news release dated May 30, 2026, titled "Astra Provides Exploration Update and Receives Independent Analyst Coverage from ATB Cormark Capital Markets"), located within the eastern Maricunga gold belt of northern Chile. The program included geological mapping of the property, a combined geochemical and spectral mineralogy survey and three controlled and natural-source audio-frequency magnetotelluric (CS-NSAMT) survey lines.

The results outline a two-kilometre-by-one-kilometre gold and silver geochemical target concentrated in the southwestern portion of a larger two-kilometre-by-two-kilometre lithocap within the 4,480-hectare property. Don Mario is located within the Maricunga gold belt, which is one of the most prolific gold districts in the world containing several large HSE and porphyry deposits.

Eight shallow RC (reverse circulation) holes were completed by previous operators and returned 20 metres and 32 metres of 0.41 gram per tonne gold and 0.38 g/t gold, respectively, in two separate holes. These holes were completed to the east of the current focus of exploration and did not test Astra's currently high-priority drill targets. Drill results by previous operators are historical in nature and have not been verified by Astra.

Geology of Don Mario project

Astra's geological mapping of the Don Mario project shows a strong overlapping two-kilometre-by-1.8-kilometre area of intense hydrothermal alteration identified from satellite imagery and the Cerro Bayo volcanic complex. The complex includes a dacitic-to-rhyodacitic dome forming the Cerro Bayo hill in the northeastern portion of the alteration anomaly, surrounded by phreatomagmatic tuffs exposed mainly to the west.

The Cerro Bayo volcanic complex is interpreted to continue westward beneath shallow modern cover, based on several subcrops and small outcrops identified along creeks in this area. Portions of the target geology are pervasively silicified and locally form vuggy silica and hydrothermal breccias cemented by quartz-alunite and jarosite. Previous exploration by other operators at the project identified locally elevated gold values within some of these hydrothermal breccias.

Alteration and geochemistry of Don Mario

A total of 261 grid samples were collected and analyzed for alteration assemblages. The results show a strong correlation with the alteration patterns interpreted from satellite imagery and confirm the presence of a quartz-alunite-pyrophyllite alteration assemblage. Alteration assemblage interpretation defined three zones: the shallow lithocap with K-rich alunite (Zone 1), the deeper lithocap with sodium-rich alunite (Zone 2) and the higher-temperature feeder zones with pyrophyllite (Zone 3).

The same grid was sampled for lag geochemistry. The results define a two-kilometre-by-one-kilometre, northwest-elongated gold-silver anomaly, concentrated predominantly west and southwest of the main lithocap. The strongest gold anomalies range up to 0.2 g/t gold and display a predominantly east-west orientation. Silver anomalies are more extensive and range up to 2.0 g/t silver.

In addition to the grid sampling, nine rock-chip samples were collected from surface outcrops within the survey area. These samples returned gold and silver anomalies, with maximum values of 1.35 g/t gold and 1.14 g/t silver. The highest gold value was obtained from a hydrothermal breccia located south of the Cerro Bayo hill.

Geophysics of Don Mario

To further evaluate the lithocap alteration and associated geochemical anomalies, Astra completed a three-line CS-NSAMT survey along northeast-southwest-oriented profiles crossing the northwest-oriented target area.

The CS-NSAMT results identify a shallow high-resistivity anomaly approximately 200 to 400 metres thick, occurring between approximately 4,600 and 5,000 metres elevation and extending for at least 600 metres across the three sections. A second, deeper resistive anomaly extends to approximately 4,000 metres elevation, or approximately 1,000 metres below surface, and is concentrated toward the southwest.

These resistive anomalies are the exact targets for vuggy silica at the core of a high-sulphidation system.

Don Mario targeting summary

The combination of geological mapping, alteration mineralogy, geochemistry and geophysics supports the interpretation of a large HSE system with multiple exploration targets. These include:

  • A shallow, disseminated gold and silver mineralization target associated with a large (one by one kilometre) flat-lying lithocap with favourable alteration (Zone 1);
  • Deeper HSE-porphyry transition target located northwest of the area (Zone 2);
  • Potentially higher-grade feeder-zone targets (Zone 3), associated with faults and deep resistivity anomalies to the south of the area.

The results provide compelling targets for follow-up exploration, including drill testing of the most prospective portions of the Don Mario HSE system. Astra intends to undertake a drill program of approximately 2,500 metres, currently planned to commence in Q1 2027.

Sampling procedure

At each sampling location, two samples were collected: one for LAG analysis and another for Terraspec analysis. A maximum offset of 10 metres from the theoretical sampling point was established, depending on field conditions.

At each sampling site, the surface soil layer was removed over an area of approximately one square metre, using a brush to eliminate coarse fragments. The material was collected with a plastic scoop, without exceeding a depth of five centimetres.

LAG sampling consisted of the collection of surface material with a particle size ranging from two milimetres to 4.75 milimetres, using a sieve system (No. 4 mesh over No. 10 mesh). The material was manually sieved in the field, collecting approximately one to 1.5 kilograms per sample. Samples were stored in 25-by-35-centimetre bags, properly labelled and identified.

Samples were sent to ALS Labs in Copiapo and analyzed with the following routine: PREP-31B, AuME-ST43. Additionally, at each sampling location, a sample was collected for Terraspec analysis by manually selecting fragments from the material retained on the upper sieve (approximately two to five centimetres in size), with an approximate weight of 100 grams. These samples were stored in 10-by-10-centimetre properly labelled Ziploc bags and sent to a consultant company to analyze.

From the designed grid, only samples between localities 250 and 255 could not be surveyed due to operational difficulties associated with terrain conditions. To ensure analytical quality assurance/quality control (QA/QC), a systematic protocol was implemented that included the insertion of 14 QA/QC samples, including duplicate samples, standards and blanks.

Qualified person

The technical data and information as disclosed in this news release have been reviewed and approved by Darcy Marud, who is an independent director of Astra. Mr. Marud is a practising member of the Association of Professional Geoscientists of Ontario and is a qualified person as defined under the terms of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

About Astra Exploration Inc.

Astra Exploration is a precious metals exploration company based out of Vancouver, B.C., that is actively building a portfolio of high-quality projects in some of the most important mining jurisdictions in Latin America. The 80-per-cent-owned La Manchuria gold-silver project in Santa Cruz, Argentina, over which Astra has an option to acquire a 90-per-cent interest from Patagonia Gold Corp., is a high-grade gold and silver low-sulphidation epithermal (LSE) deposit located in the prolific Deseado massif, which hosts multiple world-class LSE precious metals deposits, including Cerro Vanguardia and Cerro Negro in Santa Cruz, Argentina. The 100-per-cent-owned Pampa Paciencia gold and silver project in northern Chile is located in the Paleocene mineral province in proximity to major operating mines such as Spence and Sierra Gorda. The project shares several important geological similarities to other Paleocene LSE gold-silver deposits, including Faride and El Penon.

The 100-per-cent-owned Don Mario (renamed from Cerro Bayo) project in northern Chile is located in the Maricunga belt approximately 20 kilometres from the Refugio mine. The project hosts a high-sulphidation-epithermal-plus-or-minus-porphyry gold system with similarities to the Salares Norte deposit to the north in the same belt. The Maricunga belt is one of the most endowed regions in the world for gold and copper deposits.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.