15:24:54 EST Mon 23 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Azarga Metals Corp (2)
Symbol AZR
Shares Issued 107,747,497
Close 2026-11-18 C$ 0.115
Market Cap C$ 12,390,962
Recent Sedar+ Documents

Azarga Metals completes drill program at Marg

2026-11-23 11:08 ET - News Release

Mr. Gordon Tainton reports

AZARGA METALS COMPLETES MARG DRILL PROGRAM

Azarga Metals Corp. has completed its first drill program at the company's high-grade, copper-rich volcanogenic massive sulphide (VMS) Marg project located in the prolific Keno Hill mining district of central Yukon Territory, Canada. The company completed nearly 2,500 metres of diamond drilling across six holes. Drilling focused on the central zone of the deposit to test down-plunge extensions of previously intersected sulphide mineralization. The overall mineralized footprint of the Marg project remains open along strike to the east, west and at depth.

Gordon Tainton, chief executive officer of Azarga, commented: "We are incredibly proud of our exploration team and contractors for safely and efficiently concluding our maiden drill campaign at the Marg project. Our drill targets were designed to test extensions of the current mineral resource estimate and though we await assay results, the visible sulphide mineralization, alteration, and other geological features observed in the core are highly encouraging. We look forward to receiving and reporting the assay results early in the new year."

Core processing and logging have been finalized, and all samples have been securely dispatched to ALS's Whitehorse laboratory for sample preparation. Following preparation, the samples will be sent to ALS's North Vancouver laboratory in British Columbia for multielement geochemical analysis. A total of 350 samples were delivered to ALS Whitehorse for sample preparation. Once assay data has been received, verified and compiled, the company will add it to the geological model and plan a follow-up phase 2 drill program for the 2027 field season.

Marg project -- overview

The Marg project is a high-grade, copper-rich VMS deposit located in the Central Yukon, approximately 40 km east of Keno City. Azarga owns a 100-per-cent interest in the 400 mineral claims which cover approximately 8,400 hectares and comprise the property.

The project benefits from excellent infrastructure, including an airstrip, functional base camp, nearby power corridors and proximity to established mining operations within the Keno Hill district of the Yukon.

The Marg project mineral resource, at a 0.5-per-cent copper equivalent (CuEq) cut-off, is estimated as shown in the attached table (see news release Sept. 24, 2025).

Drill hole locations

The company completed nearly 2,500 metres of diamond drilling across six holes. Drilling focused on the central zone of the deposit to test down-plunge extensions of previously intersected sulphide mineralization.

QA/QC (quality assurance/quality control) procedures

Technical execution of the 2026 Marg project drill program was managed by geologists employed by Peregrine Geological Consulting Ltd., which oversaw all core logging, sampling and secure dispatch procedures. NQ drill core was logged by Peregrine geoscientists, with sample intervals delineated precisely on the basis of visual mineralization, lithologic contacts and alteration intensity. Sampled intervals were sawn in half using a diamond core saw, with one-half collected and packaged in sealed polybags for shipping and ultimately geochemical analysis. The remaining half was retained in the original core boxes in order to preserve a permanent archival record. A rigorous, industry-standard quality assurance and quality control (QA/QC) program was enforced throughout the program, incorporating the routine insertion of certified reference materials (standards), analytical blanks and duplicate samples directly into the sample stream. Following core cutting and sample bagging, all samples were securely sealed and transported under documented chain-of-custody protocols from the Marg project site to the ALS laboratory in Whitehorse, Yukon. A total of 350 samples were delivered to ALS Whitehorse for sample preparation. Upon completion of preparation, the samples will be dispatched to the ALS facility in North Vancouver, B.C., for multilement assaying.

Qualified person

Charles J. Greig, Msc, PGeo, a qualified person as defined by National Instrument 43-101, has reviewed and approved the exploration information disclosed in this news release.

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 100 per cent of the high-grade, copper rich VMS Marg project located in central Yukon, Canada. On Sept. 23, 2025, the company filed a National Instrument 43-101 -- Standard of Disclosures for Mineral Projects independent technical report for the Marg project titled "NI 43-101 Technical Report for the Marg Property, Yukon Territory" dated Aug. 29, 2025, with an effective date of Aug. 29, 2025. The Marg report was prepared by independent consultants at IMC Mining Pty. Ltd. and TruePoint Exploration. The Marg report estimated 4.3 Mt (million tonnes) of indicated resource grading 2.9 per cent CuEq and 10.0 Mt of inferred resource grading 2.3 per cent CuEq at a 0.5 per cent copper equivalent (CuEq) cut-off.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.