06:30:13 EST Thu 19 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Epic Gold Corp (2)
Symbol EPG
Shares Issued 66,640,384
Close 2026-11-18 C$ 0.21
Market Cap C$ 13,994,481
Recent Sedar+ Documents

Epic Gold completes resource estimate for Wilson

2026-11-19 03:55 ET - News Release

Subject: New Release for dissemination at 4;30AM ET Nov 19, 2026 PDF Document

File: Attachment 20261119 Epic Gold Updated MRE_Wilson-Fenton_Final.pdf

EPIC Gold Announces Ini1al Inferred Mineral Resource of 3.047 Million Tonnes at 2.85 g/t Au Containing 279,000 Ounces of Gold at Wilson Gold Project, Quebec

Toronto, Ontario November 19, 2026 Epic Gold Corp. (CSE: EPG) (the "Company") is pleased to announce the comple=on of an ini=al independent Mineral Resource Es=mate ("MRE") for its Wilson Gold Project (the "Wilson Project" or the "Project"), located in Quebec, Canada.

The ini=al MRE defines an Inferred Mineral Resource of 3.047 million tonnes grading 2.85 grams per tonne ("g/t") gold ("Au"), containing approximately 279,000 ounces of gold, within op=mized open-pit and underground repor=ng constraints.

The es=mate establishes an ini=al mineral resource inventory for the Wilson Project and provides a technical founda=on for ongoing geological interpreta=on, resource evalua=on and explora=on planning.

Highlights of the Ini1al Wilson Mineral Resource Es1mate

dot 279,000 ounces of gold contained in 3.047 million tonnes grading 2.85 g/t Au in the Inferred Mineral Resource category.

dot Mineral Resources reported within open-pit and underground constraints. dot Reporting cut-off grades of 0.40 g/t Au (open pit) and 1.60 g/t Au (underground).

The MRE has an effec=ve date of November 9, 2026, and incorporates historical drilling, assay results, geological interpreta=on and three-dimensional mineraliza=on modelling.

Table 1. Wilson Gold Project Initial Inferred Mineral Resource Estimate

Classification Constraints Cut-Off Tonnage Grade Contained Grade (Au g/t) Metal (Au g/t)

Total Inferred OP 0.40 2,405,000 2.66 205,000

Total Inferred UG 1.60 642,000 3.57 74,000

Total Inferred OP/UG 0.40/1.60 3,047,000 2.85 279,000 Effec%ve date: November 9, 2026.

Mineral Resource Es1mate Notes 1. Mineral Resources were es%mated in accordance with CIM Defini%on Standards for Mineral Resources and Mineral Reserves (2014) and the CIM Es%ma%on of Mineral Resources and Mineral Reserves Best Prac%ce Guidelines (2019). 2. The Mineral Resource Es%mate has an effec%ve date of November 9, 2026. 3. Gold grades were es%mated using inverse distance squared (ID Superscript 2) interpola%on within a three-dimensional block model constrained by interpreted mineralized wireframe solids. 4. Mineral Resources are reported within open-pit shells and underground repor%ng shapes. 5. Open-pit Mineral Resources are reported using a cut-off grade of 0.40 g/t Au. 6. Underground Mineral Resources are reported using a cut-off grade of 1.60 g/t Au. 7. The cut-off grade assump%ons incorporate a long-term gold price of US$3,600 per ounce and a metallurgical recovery of 92%. 8. Underground mining costs were es%mated at US$135 per tonne, with processing and G&A costs of US$37.50 per tonne.

9. The es%mate assumes an overall open-pit slope angle of 45 degrees and dilu%on assump%ons of 10% for open-pit and underground material.

10. Bulk density values were established by lithology and/or mineralized domain using comparable regional project informa%on.

11. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. 12. Mineral Resource quan%%es, grades and contained metal have been rounded to reflect the precision of the

es%mate. Totals may not sum exactly due to rounding. 13. The Mineral Resource Es%mate was prepared by Todd McCracken, P.Geo., of BBA E&C Inc., an independent

Qualified Person as defined under Na%onal Instrument 43-101. Rod Husband, President and CEO of Epic Gold Corp., commented: "This ini%al independent Mineral Resource Es%mate represents an important milestone for the Wilson Gold Project. Establishing an Inferred Mineral Resource of 3.047 million tonnes grading 2.85 g/t Au and containing 279,000 ounces of gold provides a meaningful star%ng point for evalua%ng the Project. Importantly, the es%mate incorporates both open-pit and underground repor%ng constraints, providing a framework for understanding the distribu%on of mineraliza%on and assessing future explora%on priori%es."

Figure 1: Regional map showing nearby explora%on projects and mines. Read together with Table 2 for tonnages, grades, resource categories, source dates and the historical status of the Pus%camica es%mate see Appendix A for more informa%on. Wilson Gold Project Mineral Resource Es1mate The 2026 MRE was prepared using a three-dimensional geological and block model incorpora=ng available drilling, assay data and mineralized wireframe domains.

Gold grades were es=mated using inverse distance squared ("ID Superscript 2") interpola=on. Mineral Resources were classified in accordance with the Canadian Ins=tute of Mining, Metallurgy and Petroleum ("CIM") Defini=on Standards for Mineral Resources and Mineral Reserves (2014).

The es=mate incorporates open-pit op=miza=on and underground repor=ng constraints intended to demonstrate reasonable prospects for eventual economic extrac=on.

The reported resource includes mineralized material within both open-pit and underground repor=ng constraints. A cut-off grade of 0.40 g/t Au was applied to open-pit material, while a cut-off grade of 1.60 g/t Au was applied to underground material.

The combined es=mate reflects the applica=on of these different repor=ng criteria to the geological block model. Figure 2. Plan view and representa%ve cross-sec%on A A of the Wilson Gold Project, illustra%ng diamond drillhole traces, interpreted gold mineraliza%on, op%mized open-pit constraints and underground mine-design shapes associated with the ini%al Inferred Mineral Resource Es%mate of 3.047 million tonnes grading 2.85 g/t Au, containing 279,000 ounces of gold. Figure 3. Longitudinal sec%on of the Wilson Gold Project showing gold mineraliza%on, drillhole traces, and open- pit and underground constraints associated with the 2026 Inferred Mineral Resource Es%mate.

The interpreted mineraliza=on envelopes are displayed at a threshold of greater than 0.2 g/t Au for geological context. The Mineral Resource Es=mate is reported using cut-off grades of 0.40 g/t Au for open-pit material and 1.60 g/t Au for underground material. The geological mineraliza=on envelopes do not independently represent reportable Mineral Resources. Fenton Gold Project Ini1al Mineral Resource and Addi1onal Explora1on Poten1al In addi=on to the Wilson Mineral Resource Es=mate, Epic Gold has established an ini=al Inferred Mineral Resource at its Fenton Gold Project in Quebec of 1,918,000 tonnes grading 1.46 g/t Au, containing approximately 90,000 ounces of gold.

Classification Constraints Cut-Off Tonnage Grade Contained Total Inferred OP Grade (Au g/t) Metal (Au g/t) 1,575,000 1.32 67,000 0.40

Total Inferred UG 1.60 343,000 2.14 24,000

Total Inferred OP/UG 0.40/1.60 1,918,000 1.46 90,000

Mineral Resource Es1mate Notes 1. Mineral Resources were es%mated in accordance with CIM Defini%on Standards for Mineral Resources and Mineral Reserves (2014) and the CIM Es%ma%on of Mineral Resources and Mineral Reserves Best Prac%ce Guidelines (2019). 2. The Mineral Resource Es%mate has an effec%ve date of November 9, 2026. 3. Gold grades were es%mated using inverse distance squared (ID Superscript 2) interpola%on within a three-dimensional block model constrained by interpreted mineralized wireframe solids. 4. Mineral Resources are reported within open-pit shells and underground repor%ng shapes. 5. Open-pit Mineral Resources are reported using a cut-off grade of 0.40 g/t Au. 6. Underground Mineral Resources are reported using a cut-off grade of 1.60 g/t Au. 7. The cut-off grade assump%ons incorporate a long-term gold price of US$3,600 per ounce and a metallurgical recovery of 92%. 8. Underground mining costs were es%mated at US$135 per tonne, with processing and G&A costs of US$37.50 per tonne. 9. The es%mate assumes an overall open-pit slope angle of 45 degrees and dilu%on assump%ons of 10% for open-pit and underground material. 10. Bulk density values were established by lithology and/or mineralized domain using comparable regional project informa%on. 11. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. 12. Mineral Resource quan%%es, grades and contained metal have been rounded to reflect the precision of the es%mate. Totals may not sum exactly due to rounding. 13. The Mineral Resource Es%mate was prepared by Todd McCracken, P.Geo., of BBA E&C Inc., an independent Qualified Person as defined under Na%onal Instrument 43-101.

The es=mate, effec=ve November 9, 2026, incorporates open-pit and underground repor=ng constraints using cut-off grades of 0.40 g/t Au and 1.60 g/t Au, respec=vely. Beyond the reported Mineral Resource, the Company's geological interpreta=on iden=fies addi=onal mineralized areas that warrant further explora=on. The current Mineral Resource includes only material sa=sfying the applicable repor=ng criteria and does not necessarily represent the full extent of the interpreted mineralized system.

Based on historical drilling, geological interpreta=on and three-dimensional mineraliza=on modelling, the Company has iden=fied a conceptual Explora=on Target comprising:

dot 1.5 to 3.0 million tonnes of poten=ally gold-mineralized material; dot Gold grades ranging from 0.60 to 1.30 g/t Au.

Mark Richardson, VP Explora=on commented, "The ini=al Inferred Mineral Resource at Fenton, comprising 1,918,000 tonnes grading 1.46 g/t Au and containing approximately 90,000 ounces of gold, establishes a strong founda=on for future explora=on. Our geological interpreta=on indicates that mineraliza=on extends beyond the current resource constraints, highligh=ng opportuni=es for further discovery. We believe targeted explora=on and a bemer understanding of the structural controls could significantly expand the mineralized footprint".

Cau%onary Statement: The poten%al quan%ty and grade of the Explora%on Target are conceptual in nature. There has been insufficient explora%on to define a Mineral Resource within the Explora%on Target, and it is uncertain whether further explora%on will result in any por%on being delineated as a Mineral Resource. The Explora%on Target is separate from the reported Mineral Resource and must not be interpreted as a Mineral Resource or Mineral Reserve.

The Company intends to evaluate these prospec%ve areas through addi%onal geological interpreta%on and targeted explora%on, with the objec%ve of assessing their poten%al to support future Mineral Resource es%mates.

Mineral Resource Es1ma1on Methodology and Assump1ons The MRE was prepared by BBA E&C Inc. using available geological and explora=on informa=on, including historical drill-hole data, analy=cal results, lithological interpreta=ons and three-dimensional mineralized wireframes.

The Mineral Resource Es=mate incorporates the following principal assump=ons:

Parameter Assump1on

Long-term gold price US$3,600/oz

Metallurgical recovery 92%

Open-pit repor=ng cut-off 0.40 g/t Au

Underground repor=ng cut-off 1.60 g/t Au

Underground mining cost US$135/t

Processing and G&A costs US$37.50/t

Open-pit overall slope angle 45degree

Dilu=on assump=on 10% for OP and UG

Grade es=ma=on methodology Inverse Distance Squared (ID Superscript 2)

Resource classifica=on Inferred

Effec=ve date November 9, 2026

`

Bulk density values were assigned by lithology and/or mineralized domain using values derived from comparable

regional projects.

The open-pit repor=ng cut-off was established using the es=mated incremental costs associated with mining, processing and general and administra=ve expenses. The underground repor=ng cut-off incorporates es=mated mining, processing and general and administra=ve costs. The economic assump=ons and repor=ng constraints are used to establish reasonable prospects for eventual economic extrac=on and do not cons=tute an economic assessment, mine plan or declara=on of Mineral Reserves.

Technical Report Suppor=ng NI 43-101 technical repor=ng for Wilson and Fenton is being prepared. Subject to applicable filing requirements and confirma=on of the relevant triggering disclosure dates, the suppor=ng technical report or reports will be filed on the Company's issuer profile on SEDAR+ (www.sedarplus.ca) within the prescribed period. The reports will provide further details of the geological models, data verifica=on, es=ma=on methods, resource classifica=on and repor=ng assump=ons.

About the Projects Wilson is located near Lebel-sur-Quevillon, Quebec, within the Abi=bi Greenstone Belt. Fenton is in the Chapais Chibougamau district of Quebec, also within the Abi=bi Greenstone Belt. Both projects have been the subject of historical explora=on and geological evalua=on, and the ini=al current Inferred MREs establish a basis for addi=onal explora=on and technical work.

Qualified Person The scien=fic and technical informa=on pertaining to the Wilson and Fenton Mineral Resource Es=mates in this news release was and approved by Todd McCracken, P.Geo., of BBA E&C Inc., an independent Qualified Person as defined by NI 43-101.

The scien=fic and technical informa=on in this news release, other than the Mineral Resource Es=mate, has been reviewed and approved by Mark Richardson, P.Geo. (OGQ Permit No. 10929), Vice President of Explora=on of the Company and a Qualified Person as defined by NI 43-101

About Epic Gold Corp. Epic Gold Corp. is a Canadian gold exploration company focused on advancing its portfolio of gold projects in Ontario and Quebec. The Company holds four gold projects, including Hawkins in Ontario and Wilson, Fenton and Benoist in Quebec. With current Inferred Mineral Resources at Hawkins, Wilson and Fenton, Epic is focused on resource expansion, exploration and unlocking the potential of its projects in established Canadian gold districts.

On Behalf of the Board /s/ "Rod Husband" President & CEO +1 (778) 819-2708 investors@epicgoldcorp.com hmps://epicgoldcorp.com

Cau1onary Statement Regarding Mineral Resources Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. Inferred Mineral Resources have a lower level of confidence than Indicated Mineral Resources and are based on limited geological evidence and sampling sufficient to imply, but not verify, geological and grade con=nuity. There is no certainty that any por=on of an Inferred Mineral Resource will be converted into a higher-confidence classifica=on or ul=mately into a Mineral Reserve.

The reported Wilson and Fenton es=mates apply separate open-pit and underground repor=ng constraints and should not be interpreted as a joint opera=on, a single deposit or a single development project. Mineral Resource quan==es and grades are rounded. The es=mates may be affected by changes in geological interpreta=on, metal prices, metallurgical recoveries, mining and processing costs, infrastructure, environmental condi=ons, permixng and other material factors.

Cau1onary Note Regarding Forward-Looking Informa1on This news release contains forward-looking informa=on within the meaning of applicable Canadian securi=es legisla=on, including statements about addi=onal explora=on, poten=al mineraliza=on extensions, resource upgrades, technical evalua=ons, future ac=vi=es and the filing of technical reports. Such statements are based on assump=ons that may prove incorrect and are subject to known and unknown risks and uncertain=es that could cause actual results to differ materially from those expressed or implied.

Relevant risks include uncertainty inherent in Inferred Mineral Resources, variability in geological models and recovery assump=ons, mining and processing costs, environmental and regulatory requirements, access, financing, staffing and the outcome of future explora=on. Readers should not place undue reliance on forward- looking statements. Except as required by law, the Company undertakes no obliga=on to update them. Further risk informa=on is available in the Company's public con=nuous disclosure filings at www.sedarplus.ca.

Such statements are based on assump=ons considered reasonable by management at the =me they are made, including assump=ons regarding gold prices, geological interpreta=ons, metallurgical recoveries, opera=ng costs, explora=on results, availability of financing, permixng and regulatory approvals.

Forward-looking informa=on is subject to risks, uncertain=es and other factors that may cause actual results, events or developments to differ materially from those expressed or implied. These risks include, without limita=on, uncertainty in Mineral Resource es=mates; the possibility that future explora=on results will not support an increase in Mineral Resources; changes in commodity prices; variability in metallurgical performance; changes in opera=ng or capital costs; permixng delays; environmental and regulatory risks; availability of qualified personnel and contractors; and the Company's ability to obtain financing on acceptable terms. Readers are cau=oned not to place undue reliance on forward-looking informa=on.

Except as required by applicable securi=es laws, the Company undertakes no obliga=on to update or revise forward-looking statements as a result of new informa=on, future events or otherwise.

Addi=onal informa=on regarding risks and uncertain=es affec=ng the Company is available in its con=nuous disclosure documents filed under its issuer profile on SEDAR+ at www.sedarplus.ca.

Neither the TSX Venture Exchange nor its Regula1on Services Provider accepts responsibility for the adequacy or accuracy of this release. Appendix A

Table 2. Mineral resource quan11es and grades suppor1ng Figure 1 The figures below reproduce the es=mates cited in Figure 1. Measured and Indicated categories are shown separately, with combined subtotals where used on the map. Pus=camica is a historical es=mate and is not a current Mineral Resource of the Company.

Project Resource category Constraint Tonnes Grade Contained (g/t Au) Au (oz)

Discovery [1] Measured OP 8,000 3.44 900

Discovery [1] Indicated OP 223,000 2.86 20,500

Discovery [1] Indicated UG 955,000 5.09 156,300

Discovery [1] Measured + Indicated OP + UG 1,186,000 4.66 177,700

Discovery [1] Inferred OP + UG 1,970,000 4.80 303,700

Flordin [2] Measured OP 86,000 2.58 7,100

Flordin [2] Indicated OP 1,444,000 2.15 99,900

Flordin [2] Indicated UG LH 227,000 3.75 27,500

Flordin [2] Indicated UG RP 1,000 5.46 200

Flordin [2] Measured + Indicated OP + UG 1,758,000 2.38 134,700

Flordin [2] Inferred OP + UG 575,000 3.23 59,700

Osborne-Bell [3] Inferred UG 2,587,000 6.13 510,000

Pus=camica [4] Historical Indicated UG 1,431,800 2.56 118,000

Pus=camica [4] Historical Inferred UG 1,051,700 2.06 69,700

Bachelor [6] Measured UG 677,000 3.99 87,000

Bachelor [6] Indicated UG 228,000 3.53 26,000

Bachelor [6] Measured + Indicated UG 905,000 3.87 113,000

Bachelor [6] Inferred UG 197,000 4.45 28,000

Moroy [6] Measured UG 250,000 4.14 33,000

Moroy [6] Indicated UG 625,000 4.08 82,000

Moroy [6] Measured + Indicated UG 875,000 4.10 115,000

Moroy [6] Inferred UG 781,000 4.18 105,000

OP = open pit; UG = underground; LH = long hole; RP = room and pillar. Measured + Indicated rows are subtotals and must not be added to the separate category rows. Inferred resources are reported separately. Tonnes are metric tonnes; contained gold is in troy ounces. Source figures are rounded and may not reconcile exactly. Sources and es1mate dates [1] Abcourt Mines Inc., Discovery 2023 MRE, Table 1, effec=ve March 28, 2023. Cut-offs: 0.5 g/t Au (OP) and 3.0 g/t Au (UG). [2] Abcourt Mines Inc., Flordin technical report, Table 14-7, effec=ve May 15, 2023. Cut-offs: 0.5 g/t Au (OP), 3.1 g/t Au (UG LH) and 4.6 g/t Au (UG RP). Combined M&I and Inferred totals are as disclosed by Abcourt. [3] Gold Fields, Osborne-Bell project disclosure, effec=ve March 2, 2018; 3.0 g/t Au cut-off. [4] Car=er Resources Inc., December 17, 2020 news release, Pus=camica structure only, excluding the Dyke structure. Suppor=ng InnovExplo report dated January 28, 2021, effec=ve December 17, 2020. Gold grades and contained gold are reported here, not gold-equivalent grades or ounces. [5] Wilson: Table 1 of this news release, effec=ve November 9, 2026. [6] Bonterra Resources Inc., April 1, 2026 news release, and March 31, 2026 MD&A, Tables 3 and 4. Bachelor and Moroy es=mates effec=ve February 18, 2026; 2.0 g/t Au underground stope cut-off.

Pus=camica historical es=mate: The 2020 es=mate was prepared by InnovExplo for Car=er using CIM (2014) resource categories, a 1.5 g/t AuEq cut-off and underground repor=ng constraints below a 100 m crown pillar. The Pus=camica Indicated material also grades 0.19% Cu and 8.50 g/t Ag; Inferred material grades 0.07% Cu and 3.26 g/t Ag. The es=mate provides regional geological context. A Qualified Person has not done sufficient work to classify it as a current Mineral Resource, and the Company is not trea=ng it as current. Data compila=on, re- drilling, re-sampling and data verifica=on may be required to establish a current es=mate.

Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Es=mates from other proper=es are provided for regional context and are not necessarily indica=ve of mineraliza=on or Mineral Resources at Wilson or Fenton.

© 2026 Canjex Publishing Ltd. All rights reserved.