14:52:09 EDT Tue 22 Sep 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Lincoln Gold Mining Inc (2)
Symbol LMG
Shares Issued 32,035,604
Close 2026-09-21 C$ 0.475
Market Cap C$ 15,216,912
Recent Sedar+ Documents

ORIGINAL: Lincoln Gold Advances Bell Mountain Development With Water Infrastructure Right-Of-Way Transfer Application

2026-09-22 11:26 ET - News Release

(via TheNewswire)

Lincoln Gold Mining Inc.



 

Vancouver, B.C. – September 22, 2026 – TheNewswire – Lincoln Gold Mining Inc. (TSXV: LMG ; OTC: LNCLF ; FRA: ZMG ) (“Lincoln” or the “Company” ) announces another step in the advancement of its 100%-owned Bell Mountain Gold-Silver Project in Nevada, with its Nevada subsidiary, Lincoln Resource Group Corp., applying to the U.S. Bureau of Land Management (“BLM” ) to transfer an existing right-of-way (“ROW” ) associated with the project’s water well road.

 

The existing ROW, grant number NVN51551, is currently held by Bell Mountain Exploration Corp., which has provided its consent to assign the ROW to Lincoln Resource Group Corp. Lincoln has agreed to assume the existing terms and conditions of the ROW, subject to BLM approval.

 

Building the Infrastructure for Bell Mountain

 

The ROW provides established access associated with Bell Mountain’s water well infrastructure. Its proposed transfer directly to Lincoln’s Nevada subsidiary is part of the Company’s ongoing effort to consolidate project infrastructure and advance the practical requirements for future development.

 

The application follows Lincoln’s September 1, 2026 announcement outlining its next phase of Bell Mountain engineering, including well testing and preliminary waterline design.

 

“We are now moving from planning into execution on Bell Mountain,” said Ian Rogers, Chairman and CEO. “This right-of-way is one of the practical infrastructure components required to advance the project, and bringing it under Lincoln’s direct control is another step in building the foundation for future development.”

 

The Company expects to continue advancing Bell Mountain through a series of technical, infrastructure and regulatory milestones as it progresses toward development.

 

The assignment remains subject to BLM approval and will not become effective until approval is received.

Bell Mountain Project

 

Bell Mountain is Lincoln’s 100%-owned advanced-stage gold-silver project in Nevada’s Walker Lane. The project includes four defined deposits—Spurr, Varga, Sphinx and East Ridge—and is supported by substantial historical drilling, an established technical foundation and an existing open-pit, heap-leach development plan.

Lincoln is advancing Bell Mountain through a structured engineering and development program, with additional exploration potential across the property. The Company expects to continue advancing Bell Mountain through a series of technical, infrastructure and regulatory milestones as it progresses toward development.

ON BEHALF OF THE BOARD

 

Ian Rogers

Chairman and CEO

Lincoln Gold Mining Inc.

For further information, please contact:

Lincoln Gold Mining Inc.

Ian Rogers, Chairman and CEO

Phone: 604-688-7377

Email: info@lincolnmining.com


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

This news release contains forward-looking information within the meaning of applicable Canadian securities legislation, including statements regarding the proposed assignment of right-of-way grant NVN51551, the Company’s plans to advance the Bell Mountain Project, engineering and infrastructure activities, permitting, and the Company’s expectations regarding future technical, infrastructure and development milestones. Forward-looking information is based on management’s current expectations, assumptions and estimates and is subject to known and unknown risks and uncertainties. In particular, the proposed assignment remains subject to approval by the U.S. Bureau of Land Management and there can be no assurance that such approval will be obtained or that the Company’s planned activities will proceed as currently anticipated. Actual results and events may differ materially from those expressed or implied by the forward-looking information. Readers are cautioned not to place undue reliance on forward-looking information. The Company undertakes no obligation to update forward-looking information except as required by applicable securities laws.

Copyright (c) 2026 TheNewswire - All rights reserved.

© 2026 Canjex Publishing Ltd. All rights reserved.