Mr. Ian Rogers reports
LINCOLN GOLD ADVANCES BELL MOUNTAIN WITH PERMIT RENEWAL AND WATER WELL DEVELOPMENT WORK
Lincoln Gold Mining Inc. has provided a development update on its Bell Mountain gold-silver project in Churchill county, Nevada, including
renewal of the project's water pollution control permit
(WPCP) and
positive results from recent development pumping of the existing Bell Mountain alluvial water well
.
The Nevada Division of Environmental Protection (NDEP), Bureau of Mining Regulation and Reclamation, has issued the renewed WPCP for Bell Mountain. The permit authorizes the construction, operation and closure of the approved mining facilities and processing of up to 1.5 million tons of ore per year. The renewed permit became effective on Nov. 12, 2026, and remains in effect through Nov. 11, 2031. NDEP's public comment period concluded on Oct. 2, 2026, with no comments received.
The company has also received results from development pumping of the existing Bell Mountain alluvial water well, completed as part of its continuing water-supply and predevelopment work.
During approximately 1.5 hours of pumping, the well maintained an estimated discharge rate of approximately 200 to 210 gallons per minute (gpm), with only modest drawdown observed in the pumping and nearby monitoring wells. Following shutdown, the pumping well recovered to its prepumping water level within approximately one minute.
The 2026 observations were consistent with the January, 2017, evaluation of the same well, including similar water levels and discharge rates. Based on the recent development pumping and historical comparison,
AquA Hydrogeologic Consulting
reported that the existing Bell Mountain alluvial well is capable of producing approximately 200 gpm on a sustained basis, with the aquifer having capacity to support higher pumping rates with appropriately sized pumping equipment.
"The permit renewal and recent water well work are both practical steps in advancing Bell Mountain," said
Joseph Sawyer, PE, president of Lincoln's Nevada operations. "The 2026 pumping results were consistent with the previous well evaluation and provide additional support for our water supply planning as we continue advancing engineering, environmental compliance and other preconstruction activities."
The Bell Mountain project is designed as a conventional open-pit, heap-leach gold-silver operation. The permitted facilities include the
Spurr,
Varga,
Sphinx
and
East Ridge
open pits, waste rock disposal facilities, crushing facilities, a heap leach pad, activated carbon adsorption plant, event pond, water supply infrastructure, and associated site facilities.
The renewed WPCP includes preoperational requirements relating to water supply, groundwater monitoring, notification, inspection and other environmental compliance measures. Lincoln will continue advancing these requirements alongside its broader engineering and development program as it progresses Bell Mountain toward a potential construction decision.
About Bell Mountain
Bell Mountain is Lincoln's advanced-stage gold-silver project in Churchill county, Nevada, approximately 40 miles east of Fallon. The project comprises the Spurr, Varga, Sphinx and East Ridge deposits, and is designed as an open-pit, heap-leach operation.
Lincoln continues to advance engineering, infrastructure, environmental compliance and financing activities at Bell Mountain with the objective of positioning the project for a potential construction decision.
About Lincoln Gold Mining Inc.
Lincoln Gold Mining is a Canadian mineral exploration and development company focused on advancing its gold projects in Nevada. The company's principal assets are the Bell Mountain gold-silver project in Churchill county and the Pine Grove gold project in Lyon county.
Qualified person
Joseph Sawyer, PE, president of the company's United States operations and a qualified person as defined by National Instrument 43-101 -- Standards of Disclosure for Mineral Projects, has reviewed and approved the technical information contained in this news release.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.