Mr. Ranbir Kalan reports
MAXUS MINING COMPLETES RESOURCE-FOCUSED TECHNICAL STUDY, IDENTIFIES 11 GEOLOGICAL TARGETS AT QUARRY PROJECT
A resource-focused technical study by Understood Mineral Resources Ltd. (UMR) has been completed at Maxus Mining Inc.'s Quarry antimony project in Northern British Columbia.
The study represents another important step in Maxus's systematic advancement of the historic Bullseye zone, establishing preliminary drill-spacing benchmarks and identifying 11 geological target wireframes to support future exploration and resource delineation drilling. The findings provide a technical framework to guide the next stages of exploration and support the company's longer-term objective of advancing the project toward a potential National Instrument 43-101-compliant mineral resource estimate (MRE).
Quarry project highlights
-
Eleven geological targets developed: UMR generated 11 preliminary geological target wireframes based on historical silver, lead and zinc mineralization at the Beveley showing, providing a framework for future exploration and resource-focused drilling.
-
Drill-spacing benchmarks established: A review of 12 analogous international polymetallic deposits established preliminary drill-spacing benchmarks to guide the company's inaugural drill campaign on the project.
-
Historical data review completed: UMR evaluated available historical drilling and assay information, identifying key data gaps and opportunities for additional verification and expansion of mineralization.
-
Advancing toward a potential MRE: The completed study provides a technical foundation to guide future resource delineation drilling and support the work required for a potential future NI 43-101-compliant MRE.
"Completing this study marks another important milestone in advancing our understanding of the Quarry project," said Ranbir Kalan, director of Maxus Mining. "We are pleased to have identified eleven geological target areas and established a technical framework to guide future drilling. These findings provide valuable direction as we continue building on the historical exploration work at Quarry and evaluating the project's potential for a future mineral resource estimate."
UMR technical study results
The study completed by UMR focused on establishing preliminary drill-spacing benchmarks and developing geological targets to guide future resource-focused exploration at the Quarry antimony project.
As part of the study, UMR reviewed 12 international polymetallic mineral deposits with comparable mineralization characteristics to evaluate drill-spacing criteria associated with mineral resource classification. The review established preliminary drill-spacing benchmarks for indicated and inferred mineral resources, providing a technical framework to guide future drilling at the project.
UMR also reviewed available historical geological, drilling and assay data at the Beveley showing, including the historic Bullseye zone. This work resulted in the development of 11 preliminary geological target wireframes, based on historically reported silver, lead, and zinc plus or minus antimony mineralization, to assist in identifying and prioritizing areas for future exploration.
The study identified certain limitations in the historical data set, including incomplete assay records and limited drill-hole coverage, which currently restrict more detailed quantitative geological and preliminary resource modelling. The geological target wireframes and drill-spacing benchmarks provide an informed basis for addressing these limitations through future exploration.
The wireframes represent interpreted exploration targets and do not constitute a mineral resource estimate or establish mineralization continuity throughout their extents. The drill-spacing benchmarks are preliminary and do not, on their own, establish mineral resource classification.
Next steps
Maxus intends to incorporate the findings of the UMR study into its continuing exploration planning at Quarry, with a focus on refining geological interpretations, verifying historical data where required, and evaluating opportunities for future confirmation, infill and expansion drilling.
The company views the completed study as an important step toward establishing the technical foundation necessary to support a potential future NI 43-101-compliant mineral resource estimate at the historic Bullseye zone.
Comments on reliability of historical estimate
The historical estimate for the property is sourced from property file PF40196, Suzie Mining Explorations Ltd. Newsletter No. 17, prepared by Keith C. Fahrni, PEng, and dated July 14, 1978. The historical estimate is considered relevant to the company's continuing exploration of the Bullseye zone because it provides an indication of the location and distribution of historically reported mineralization and assists in planning further exploration and verification work. However, the historical estimate does not include sufficient documentation of the assumptions, parameters and estimation methods required to assess it under current Canadian Institute of Mining Definition Standards and, accordingly, its reliability as a current mineral resource cannot be established.
Historical work reported estimates of 99,781 tonnes grading 1.42 per cent Pb (lead), 2.24 per cent Zn (zinc) and 36.3 grams per tonne Ag (silver) (historically described as "drill-indicated"), as well as 2.72 Mt (million tonnes) grading 3.66 per cent Pb plus Zn and 36.3 g/t Ag across three zones.
The historical estimate uses terminology and classifications that are not directly comparable to current CIM Definition Standards. The 99,781-tonne estimate was historically described as drill-indicated, while the original category of the 2.72 Mt estimate was not historically classified. There are no directly comparable current CIM categories that can be attributed to these historical classifications.
A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves, and the company is not treating the historical estimate as current mineral resources or mineral reserves.
Work that may be required to verify the historical estimate and support the preparation of a potential future mineral resource estimate includes a desktop compilation of historical drill data, confirmatory/twin drilling at appropriate spacing, specific-gravity testing by domain, modern analytical QA/QC (quality assurance/quality control) with check assays, validation of collar locations and downhole surveys, development of a 3-D geological/grade model, and QP verification to CIM standards.
About the Quarry antimony project
The 2,632-hectare Quarry antimony project is located on the north side of the Osilinka River, between Tenakhi and Wasi creeks, approximately 46 kilometres northwest of Germansen Landing, British Columbia. The historic Quarry showing is exposed in a limestone quarry, where recrystallized and dolomitized limestones of the Neoproterozoic Ingenika Group host mineralized quartz veins. Documented minerals include sphalerite, galena, cerussite, chalcopyrite, boulangerite, malachite, azurite and possibly stibnite.
Historical exploration has identified multiple zones of base and precious metal mineralization across the project. Historical sampling includes a 1991 sample that returned 20 per cent Sb (antimony), 0.34 per cent Zn, 0.89 g/t Au, 3.8 per cent Cu (copper), 42.5 per cent Pb and 0.65 g/t Ag, while earlier grab samples collected in 1954 averaged 83.5 per cent Pb and 1,576 g/t Ag.
Within the Bullseye zone, historical drilling returned reported averages intervals including 23.6 m of 1.83 per cent Pb, 2.82 per cent Zn and 56.2 g/t Ag in hole 77-11 and 6.91 m of 2.42 per cent Pb, 2.43 per cent Zn and 87.7 g/t Ag in hole 80-66. Reported intervals represent historical drilled lengths; true widths are not known.
Maxus has compiled available historical drill-hole information and incorporated the data into its geological interpretation and modelling workflow. The recently completed UMR study builds upon this work, providing preliminary drill-spacing benchmarks and geological target wireframes to guide future exploration.
The project offers reliable, year-round access, supporting ongoing exploration initiatives. The region is underlain by the Neoproterozoic Ingenika Group and Paleozoic rocks of the Big Creek, Otter Lakes, Atan, Razorback and Echo Lake groups.
Community engagement
Maxus recognizes that meaningful engagement with first nations and local communities is an important component of responsible mineral exploration. The company remains committed to maintaining transparent communication, minimizing environmental disturbance and building respectful long-term relationships as exploration activities progress.
Qualified person statement
The scientific and technical information contained in this news release has been reviewed and approved by Morgan Verge, PGeo, vice-president, exploration, of the company and a qualified person as defined in National Instrument 43-101 -- Standards of Disclosure for Mineral Projects. Ms. Verge has reviewed the technical findings provided by Understood Mineral Resources, along with available historical exploration records and supporting technical documentation. Historical results reported by previous operators have not been independently verified by the qualified person.
The analogous deposits referenced in the UMR study are presented for the purpose of evaluating preliminary drill-spacing criteria. Mineral resources reported at these deposits are not necessarily indicative of mineralization, mineral resources or exploration results that may be achieved at the project.
About Maxus Mining Inc.
Maxus Mining is a mineral exploration company focused on locating, acquiring and, if warranted, advancing economic mineral properties in premier jurisdictions. The company is actively progressing its diversified portfolio totalling approximately 16,490 hectares of prospective terrain across British Columbia, Canada.
The portfolio includes 9,492 hectares across three antimony projects: the flagship Alturas antimony project, where a recent discovery returned high-grade naturally occurring antimony up to 69.98 per cent Sb; the Hurley antimony project, located adjacent to Endurance Gold Corp.'s Reliance gold project, where 2024 drilling reported 19.2 per cent Sb and 2.16 g/t Au over 0.5 m; and the Quarry antimony project, which hosts historical polymetallic samples grading 0.89 g/t Au, 3.8 per cent Cu, 0.34 per cent Zn, 42.5 per cent Pb, 0.65 g/t Ag and 20 per cent Sb.
Maxus's portfolio further includes the 3,875-hectare Lotto tungsten project, where a selected 1980 grab sample from a scheelite-bearing quartz vein assayed 10.97 per cent WO3, and the 3,123-hectare Penny copper project, which has over 100 years of recorded exploration. Recent work programs at Penny included rock sampling and geological mapping, with 2017 sampling returning copper values of 1,046 parts per million Cu (TK17-149c), 1,808 ppm Cu (TK17-28) and 2,388 ppm Cu (TK17-12). The project is strategically located near the historic Sullivan mine at Kimberley, B.C., an area that continues to attract significant exploration activity.
Maxus Mining is committed to advancing its British Columbia projects through targeted exploration programs designed to unlock value across multiple critical mineral systems.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.