06:30:52 EST Mon 16 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Pecoy Copper Corp.
Symbol PCU
Shares Issued 210,690,791
Close 2026-11-13 C$ 1.85
Market Cap C$ 389,777,963
Recent Sedar+ Documents

ORIGINAL: Pecoy Copper Intersects 727 Metres at 0.30% Copper and 0.11 g/t Gold at South Breccia; Northwest Returns 220 Metres at 0.40% Copper and 0.030% Molybdenum

South Breccia includes 470 metres at 0.32% Cu and 0.15 g/t Au; East Breccia returns 236 metres at 0.40% Cu, including 92 metres at 0.50% Cu

2026-11-16 06:15 ET - News Release

VANCOUVER, British Columbia, Nov. 16, 2026 (GLOBE NEWSWIRE) -- Pecoy Copper Corp. (“Pecoy Copper” or the “Company”) (TSXV: PCU; FSE: D5E; OTCQX: PCUUF) is pleased to report results from ten diamond drill holes, PEC26-073 through PEC26-082, totalling 8,842.25 metres at its Pecoy Project (the “Project”) in southern Peru. Four holes returned intervals of more than 140 metres averaging at least 0.40% copper across the South Breccia, the East Breccia and the Northwest areas, with associated gold at South Breccia and molybdenum in the Northwest.

Highlights:

  • South Breccia – another strong copper-gold intersection. PEC26-082 returned 727.25 metres at 0.30% Cu and 0.11 g/t Au, including 188.0 metres at 0.40% Cu and 0.12 g/t Au. The 727.25-metre intersection includes 470.0 metres at 0.15 g/t Au and 0.32% Cu. PEC26-078 returned 143.45 metres at 0.40% Cu and 0.07 g/t Au in the western part of the South Breccia.
  • Northwest– broad copper-molybdenum mineralization and a priority growth opportunity. PEC26-081 returned 220.0 metres at 0.40% Cu and 0.030% Mo from 104 metres, including 54.6 metres at 0.51% Cu. The 220.0 metre interval lies within a 564.0-metre interval averaging 0.30% Cu and 0.020% Mo from 2.0 metres. The hole tested the margin of the interpreted MTP-01 target, providing geological information to guide further testing.
  • East Breccia – first hole of the 2026 program to test the East Breccia returns broad, higher-grade copper mineralization. PEC26-076 returned 236.0 metres at 0.40% Cu, including 92.0 metres at 0.50% Cu, within a broader interval of 513.9 metres at 0.30% Cu in the East Breccia area.

Vincent Metcalfe, President and CEO of Pecoy Copper, commented: “Hole 082 reinforces the importance of South Breccia at Pecoy, returning more than 700 metres of copper-gold mineralization, including 470 metres at 0.32% Cu and 0.15 g/t Au. Hole 078 adds another broad 0.40% copper intersection in the western part of South Breccia. In the Northwest, hole 081 builds on our earlier results with broad copper-molybdenum mineralization and a separate deeper intersection beneath the resource pit shell. These results give us clear priorities for further drilling as we test their potential to expand Pecoy’s mineral resource.”

Exploration results by sector

South Breccia copper and gold – PEC26-078 and PEC26-082

PEC26-082 provides another substantial copper-gold intersection in South Breccia, the Company’s principal mineralized body. Drilled east to west from an eastern collar, the hole was designed to cross South Breccia to improve understanding of its structural controls and the association between copper and gold mineralization. PEC26-078 was collared approximately 136 metres west of PEC26-072 and drilled steeply northward. The principal copper-gold intervals lie within the resource pit shell used to constrain the April 30, 2025 Mineral Resource Estimate.

PEC26-082 returned 727.25 metres at 0.30% Cu and 0.11 g/t Au from 264.0 metres, including 188.0 metres at 0.40% Cu and 0.12 g/t Au from 576.0 metres, which in turn includes 68.9 metres at 0.50% Cu.

Within the 727.25-metre intersection, PEC26-082 returned 470.0 metres at 0.32% Cu and 0.15 g/t Au from 296.0 metres, including 178.0 metres at 0.30% Cu and 0.20 g/t Au from 474.0 metres. Current drilling adds support to a previously interpreted gold-enriched zone within South Breccia and provides further information for geological modeling and subsequent drilling.

PEC26-078 returned 143.45 metres at 0.40% Cu, 0.07 g/t Au and 0.008% Mo from 276.5 metres, including 36.0 metres at 0.50% Cu from 372.0 metres. Local intrusions interrupt South Breccia and are interpreted as thin, steep to vertical dykes.

Northwest copper-molybdenum mineralization and growth opportunity – PEC26-081

PEC26-081 returned 220.0 metres at 0.40% Cu and 0.030% Mo from 104.0 metres, including 54.6 metres at 0.51% Cu and 0.024% Mo from 120.0 metres. The 220-metre interval lies within the resource pit shell and is contained within a broader 564.0-metre interval averaging 0.30% Cu and 0.020% Mo from 2.0 metres. The higher-grade interval is hosted by porphyritic granite adjoining the North Breccia and crosses the supergene-to-primary transition.

PEC26-081 also returned a separate deeper interval of 317.5 metres at 0.22% Cu and 0.010% Mo from 691.5 metres to the 1,009.0-metre end of hole, beneath the resource pit shell. The Company interprets this mineralization as remaining open at depth. This deeper intersection provides a target for drilling to test the potential extent of Northwest mineralization beyond the shell. Drilled due north, PEC26-081 tested the margin of MTP-01, the interpreted geophysical target introduced on September 9, 2026. PEC26-084 was drilled closer to the interpreted core, while PEC26-086 was drilled to test ground potentially within or closer to the anomaly. Results from PEC26-081, PEC26-084 and PEC26-086 will help the geological team interpret the anomaly and guide subsequent drilling.

Gold and Molybdenum Context

The gold and molybdenum associated with these broad copper intersections provide additional by-product potential at Pecoy. Ongoing Phase 2 metallurgical testwork is evaluating improved gold recovery and the potential to produce a separate molybdenum concentrate, building on the Phase 1 review announced on May 26, 2026. The potential economic contribution of gold and molybdenum remains subject to metallurgical testwork and further evaluation.

East Breccia higher-grade copper mineralization – PEC26-076

PEC26-076 was the first hole drilled by the Company during the 2026 program to test the previously identified East Breccia, intersecting it in the upper portion of the hole before testing the Central Breccia target at depth. The East Breccia area returned 236.0 metres at 0.40% Cu from 174.0 to 410.0 metres, including 92.0 metres at 0.50% Cu from 278.0 metres, within a broader interval of 513.9 metres at 0.30% Cu.

Logging records magmatic-hydrothermal and crackle breccias, intervening intrusive material and short dykes, with associated chalcopyrite. The overlapping, geologically defined East Breccia package returned 216.4 metres at 0.41% Cu from 157.9 to 374.3 metres.

Central Breccia sparsely drilled target and interpreted extension – PEC26-076

Central Breccia remains a sparsely drilled target with very limited historical drilling, including the intersection in PEC-032. At depth, PEC26-076 returned 196.9 metres grading 0.20% Cu from 679.0 metres to 875.9 metres, including 20.0 metres at 0.40% Cu from 854.0 metres. The intersection lies partly beneath the resource pit shell and supports an interpreted 315-metre downdip extension relative to PEC-032. Follow-up drilling will test Central Breccia eastward and downdip.

Centre of the Pit and mineralization beneath the resource pit shell

PEC26-074 returned an upper interval of 248.0 metres at 0.25% Cu from 45.0 metres, including 36.5 metres at 0.40% Cu from 120.0 metres. Deeper in the hole, it returned 182.3 metres at 0.21% Cu from 773.0 metres to the 955.3-metre end of hole beneath the resource pit shell. This deeper intersection provides a target for testing the continuity and extent of mineralization beneath the resource pit shell.

West Pampa Zone – PEC26-077

PEC26-077 was a first-pass test of underdrilled ground at West Pampa, and returned 213.0 metres at 0.25% Cu from 56.0 metres, including 120.0 metres at 0.30% Cu from 80.0 metres. The hole tested previously underdrilled ground within the resource pit shell in an area with little historical drilling. The composite includes breccia and intrusive rocks. The Company interprets the newly recognized West Pampa body as a monomictic breccia with diabase clasts.

Eastern step out and other sectors – PEC26-075, PEC26-073, PEC26-079 and PEC26-080

PEC26-075, collared east of the deposit outline, returned 126.0 metres at 0.25% Cu from 18.0 metres, including 49.5 metres at 0.30% Cu and 15.7 metres at 0.40% Cu. A deeper interval of 274.0 metres at 0.15% Cu from 600.0 to 874.0 metres lies mostly beneath the resource pit shell.

PEC26-073 was drilled from the North Breccia area to target Early Dark Micaceous (“EDM”) zones at depth. PEC26-079 tested the EDM Vein Zone in the underdrilled centre-of-pit saddle area, while PEC26-080 also tested the saddle. Much of this area was previously unestimated because of insufficient drilling, despite lying within the resource pit shell. These holes provide additional geological and assay information for future modeling. Assays over the full 350.45-metre length of PEC26-080, from surface to the end of the hole, averaged 0.21% Cu, including 68.35 metres at 0.30% Cu and 16.05 metres at 0.40% Cu. The hole was lost and restarted as separate hole PEC26-080A, whose assays are pending.

Table 1: Selected Drill Intersections

HoleFrom
(m)
To
(m)
Length
(m)
Cu
(%)
Au
(g/t)
Mo
(%)
Ag
(g/t)
Area
(type)
PEC26-073424.00764.00340.000.250.020.0130.74North-Central
(EDM depth target)
incl.488.00578.0090.000.300.020.0151.05
PEC26-07445.00293.00248.000.250.020.0030.96Centre of the Pit
(in-pit and depth expansion)


incl.50.00194.00144.000.300.020.0031.06
incl.120.00156.5036.500.400.020.0021.68
and450.00940.00490.000.200.020.0041.11
and overlap.773.00955.30182.300.210.020.0030.88(below pit)
PEC26-07518.00144.00126.000.250.020.0080.47East
(step-out and depth)


incl.86.00135.5049.500.300.020.0080.54
incl.114.00129.7015.700.400.020.0080.62
and600.00874.00274.000.150.020.0040.59
PEC26-076124.10638.00513.900.300.020.0101.15East and Central Breccia
(in-pit and down-dip extension)





incl.157.90374.30216.400.410.030.0101.19
overlap.174.00410.00236.000.400.030.0101.16
incl.278.00370.0092.000.500.040.0131.39
also incl.440.55466.0025.450.410.030.0071.65
and679.00875.90196.900.200.060.0060.94
incl.854.00874.0020.000.400.040.0042.00
PEC26-07756.00269.00213.000.250.020.0051.00West Pampa
(first-pass test)
incl.80.00200.00120.000.300.020.0061.13
PEC26-078231.50444.00212.500.300.050.0071.23South Breccia
(in-pit, western test)


incl.266.50438.00171.500.350.060.0071.37
incl.276.50419.95143.450.400.070.0081.50
incl.372.00408.0036.000.500.080.0111.86
PEC26-07923.80628.00604.200.200.020.0041.03Centre of the Pit EDM Vein Zone
(saddle test)

incl.38.0084.0046.000.300.010.0030.60
incl.42.0050.008.000.410.020.0030.78
PEC26-0800.00350.45350.450.210.020.0061.12Centre of the Pit
(underdrilled saddle)

incl.221.65290.0068.350.300.010.0101.03
incl.259.95276.0016.050.400.010.0071.14
PEC26-0812.00566.00564.000.300.030.0201.14Northwest
(MTP-01 margin, extension)



incl.2.00536.00534.000.300.030.0211.16
incl.8.00376.00368.000.350.030.0251.34
incl.104.00324.00220.000.400.030.0301.32
incl.120.00174.6054.600.510.040.0241.52
and691.501,009.0317.500.220.020.0100.72(below pit)
PEC26-082264.00991.25727.250.300.110.0061.17South Breccia
(in-pit
structural and
Cu–Au test)






incl.296.00766.00470.000.320.150.0071.23
incl.474.00652.00178.000.300.200.0051.11
overlap.552.00894.00342.000.350.090.0061.29
incl.576.00764.00188.000.400.120.0081.45
incl.695.10764.0068.900.500.060.0121.67
also incl.802.00844.0042.000.400.060.0051.48
also incl.946.00984.0038.000.410.040.0111.63

Note: Reported intervals represent downhole lengths; true thicknesses have not yet been determined. Grades are length-weighted averages. Internal lower-grade intervals are included. Values may not sum exactly due to rounding.No individual-sample copper cut-off was applied. Overlapping and included intervals are not additive.

Table 2: Drillhole Information – Previously Reported Holes and Reported in this Release

HoleUTM
East
UTM
North
Elev
(masl)
AzimuthDipLength
Drilled (m)
Area
PEC25-06571397782672841901N0-801186.25South Breccia
PEC25-06671379682672521831N0-751068.50South Breccia
PEC26-06771310482681201718N175-751040.00Northwest
PEC26-06871363082680002016N180-751,058.10Centre of the pit
PEC26-06971371082680372001N180-70901.00Centre of the pit
PEC26-07071361182683271860N180-65947.00North-Central
PEC26-07171340482676831927N180-80776.20Centre of the pit
PEC26-07271363482672531795N0-82956.00South Breccia
PEC26-07371341582682341856N180-81938.00North-Central
PEC26-07471332582676181858N180-70955.30Centre of the pit
PEC26-07571404082677122062N130-75938.85East step-out
PEC26-07671381682681582040N180-721073East and Central
PEC26-07771308482675131706N180-72599.25West Pampa
PEC26-07871349882672491766N0-85923.00South Breccia
PEC26-07971320182675381739N175-70850.00EDM Vein Zone
PEC26-08071350582678432025N180-75350.45Centre of the pit
PEC26-08171330382679971867N0-601009.00Northwest
PEC26-08271420082674011948N270-601205.40South Breccia

Note: Coordinate Reference System (CRS): WGS 84 / UTM Zone 18S (EPSG:32718)

Table 3: Other Drilling & Target Area – Assays pending or holes in progress

HoleUTM
East
UTM
North
Elev
(masl)
AzimuthDipLength
Drilled (m)
Area
PEC26-080A71350582678432025180-751021Centre of the Pit
PEC26-08371404982672971921270-621070South Breccia
PEC26-084713197826826217250-74905Northwest
PEC26-0857128838268068163090-45974EDM Vein Zone
PEC26-08671319782682721725315-60696Northwest
PEC26-08771389482672821866102-75650SBX Gold Zone
PEC26-088713235826768418450-85508Supergene Zone
PEC26-089713214826804018350-82In progressSupergene Zone
PEC26-09071353382680921997235-65In progressEDM Centre
PEC26-0917140868267229200179-78In progressSBX Gold Zone
PEC26-09271389482672821866249-78In progressSBX Gold Zone

Note: Coordinate Reference System (CRS): WGS 84 / UTM Zone 18S (EPSG:32718)

Exploration Productivity and 2026 Program

As of November 13, 2026, the Company had drilled over 26,000 metres in the current campaign, which began in December 2025, with 25 holes completed and 4 holes in progress. The Company continues to target approximately 35,000 metres of drilling at Pecoy in 2026. Assays are pending from 7 completed holes totalling 5,824 metres.

Follow-up priorities include defining South Breccia’s copper–gold mineralization and interpreted gold-enriched zone, testing the extent and continuity of Northwest copper–molybdenum mineralization and the MTP-01 target, and testing Central Breccia eastward and downdip. The results will inform ongoing geological modeling and future resource evaluation. Southern extensions remain a priority as access becomes available.

For more information about Pecoy Copper, please visit our website at www.pecoycopper.com or view the Company’s VRIFY presentation in connection with this release at https://vrify.com/decks/24958.

Figure 1: Plan view of the Pecoy Project showing the current deposit outline, principal mineralized zones, exploration target areas and current drill hole locations

Figure 1 - Plan View - Drilling Status

Figure 2: Looking north - Cross-section showing broad copper-gold mineralization at South Breccia in PEC26-082

Figure 2 - B-B'

Figure 3: Looking west - Cross-section showing East Breccia copper mineralization and the interpreted Central Breccia downdip extension in PEC26-076

Figure 3 -C-C'

Figure 4: Looking west - Northwest cross-section showing copper–molybdenum mineralization in PEC26-081 and copper mineralization beneath the resource pit shell in PEC26-074.

Figure 4 -H-H'

Qualified Persons and Technical Notes

The scientific and technical information in this news release has been reviewed and approved by Vincent Cardin-Tremblay, P.Geo., Chief Geological Officer of Pecoy Copper and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

The Qualified Person verified the data disclosed in this news release by reviewing the final laboratory assay workbooks and certificates, drillhole collar and downhole-survey data, sampling and analytical procedures, and QA/QC results. No limitations were imposed on the verification process.

Diamond drill core from the Pecoy Project was logged and sampled at the Company’s secure core facility at site by Company personnel. Drill core was sawn in half, with one half retained for reference and the other half sampled at nominal intervals of up to 2 metres, with sample boundaries adjusted to respect geological contacts. Core diameter varied between HQ and NQ depending on depth.

Samples were bagged, sealed, and transported by commercial carrier to the Bureau Veritas preparation laboratory in Arequipa, Peru, where samples were crushed and a 250 g split was pulverized to 85% passing 75 micrometres (200 mesh). Prepared pulps were then sent to the Bureau Veritas assay laboratory in Lima, Peru. Bureau Veritas is an ISO-accredited laboratory and is independent of the Company.

Gold analyses were performed using fire assay fusion with ICP-OES finish on a 30 g sample (FA330). Samples returning gold values greater than 10 g/t Au were re-analyzed using fire assay with gravimetric finish (FA530). Copper and silver were analyzed by ICP-OES/MS following a four-acid digestion as part of a 45-element multi-element suite (4A200). Samples returning values over the upper detection limit (Au, Ag, Cu, Zn, Mo, Pb) were re-analyzed using four-acid digestion with AAS finish (MA402).

A comprehensive Quality Assurance and Quality Control (QA/QC) program was implemented as part of the sampling and analysis procedures. Certified reference materials, blanks, and duplicate samples (field, preparation, and analytical duplicates) were inserted into the sample stream at regular intervals, representing approximately 15% of the total samples submitted. No significant QA/QC issues were identified during the analysis, and the results are considered reliable for reporting purposes.

An NI 43-101 technical report in respect of the Pecoy Project with an effective date of April 30, 2025 and dated July 23, 2025 was prepared by Mining Plus and is available on SEDAR+ under the Company’s profile. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

About Pecoy Copper

Pecoy Copper is advancing the Pecoy Copper-Gold-Molybdenum-Silver Project and the Tororume Project, which together cover approximately 19,800 hectares in southern Peru’s Arequipa region. Pecoy hosts a current inferred mineral resource of 865 million tonnes at 0.34% Cu, with associated gold, molybdenum, and silver credits.

Less than 49,000 metres of drilling had been completed at Pecoy before the current campaign. The Project lies approximately 1,650 metres above sea level and benefits from year-round access and proximity to highways, power, water and the Pacific ports of Matarani and Ilo.

The Company's common shares trade on the TSX Venture Exchange under the symbol PCU, on the Frankfurt Stock Exchange under the symbol D5E, and on the OTCQX under the symbol PCUUF.

For further information, please contact:

Vincent Metcalfe, President & CEO
Pecoy Copper Corp.
Suite 2700, 666 Burrard Street, Vancouver, BC V6C 2X8

Tel: 1 (778) 401-9305 | Email: info@pecoycopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Cautionary Note Regarding Forward-Looking Information

This news release contains forward-looking information and forward-looking statements within the meaning of applicable securities legislation. Forward-looking information includes, but is not limited to, statements regarding the planned 35,000-metre 2026 drill program at Pecoy; future drilling, modeling and interpretation at South Breccia, the Northwest, East Breccia, Central Breccia, West Pampa, Centre-of-Pit and North-Central target areas; the potential geometry, continuity, scale, extension and resource-growth implications of the mineralized system; interpretation and testing of the MTP-01 anomaly; ongoing Phase 2 metallurgical testwork and potential gold and molybdenum by-products; future access to southern extensions; and the Company's ability to identify targets that may support future resource evaluation. Forward-looking information is based on management's current expectations, estimates, assumptions and beliefs, including assumptions regarding funding, permits, access, personnel, drilling productivity, laboratory turnaround times and the availability of equipment and contractors. Forward-looking information is subject to known and unknown risks and uncertainties, many of which are beyond the Company's control, that may cause actual results to differ materially from those expressed or implied. These risks include exploration and geological risk, uncertainty in target interpretations, metallurgical variability and recovery risk, operational risk, permitting and community-relations risk, financing and market risk, and the other risk factors described in the Company's continuous-disclosure filings available on SEDAR+. Forward-looking information is provided as of the date of this news release. Except as required by applicable law, the Company undertakes no obligation to update or revise such information. Readers should not place undue reliance on forward-looking information.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/db836848-64f5-406e-8fd0-389617a09a37

https://www.globenewswire.com/NewsRoom/AttachmentNg/a2130e34-ef2f-4771-b708-4ff0e1989fc6

https://www.globenewswire.com/NewsRoom/AttachmentNg/2f9ed1fa-8fea-4fd6-8b62-2b5ee38a8c53

https://www.globenewswire.com/NewsRoom/AttachmentNg/4165af33-93b4-4527-a165-72299b9f9eac


Primary Logo

Figure 1 - Plan View - Drilling Status

Figure 1 - Plan View - Drilling Status
Figure 2 - B-B'

Figure 2 - B-B'
Figure 3 -C-C'

Figure 3 -C-C'
Figure 4 -H-H'

Figure 4 -H-H'

© 2026 Canjex Publishing Ltd. All rights reserved.