P2 GOLD DRILLING CONTINUES TO EXPAND SULLIVAN ZONE MINERALIZATION
P2 Gold Inc. has released results from eight reverse circulation (RC) drill holes (GBR-141 to GBR-143 and GBR-147 to GBR-151) drilled on the downdip extension of the Sullivan zone as part of the infill and expansion drill program at its gold-copper Gabbs project in Nevada. Drilling intersected the new unit of hangingwall gold-copper mineralization previously discovered with drill holes GBR-133 and GBR-140 (see P2's news release dated Oct. 14, 2026) and confirmed the extension of the Sullivan zone to the southwest.
Drilling highlights
Select drill results (see Table 1 below for total drill results) from holes GBR-141 to GBR-143 and GBR-147 to GBR-151 drilled at the Sullivan Zone include:
-
Hole GBR-147 intersected 0.16 gram per tonne gold and 0.23 per cent copper over 44.20 metres starting 176.78 metres downhole and 13.72 metres grading 0.99 g/t gold and 0.15 per cent copper starting 300.23 metres downhole and ended in mineralization.
-
Hole GBR-150 intersected 0.28 g/t gold and 0.20 per cent copper over 59.44 metres starting 99.06 metres downhole, including
13.72 metres grading 0.78 g/t gold and 0.39 per cent copper starting 111.25 metres downhole, and ended in mineralization.
The newly identified hangingwall unit now intersected by drill holes GBR-133, GBR-140, GBR-142, GBR-148 and GBR-149 is interpreted to be a tabular body of gold-copper mineralization hosted in gabbro with thin interbeds of pyroxenite. The hangingwall mineralization appears to be in an area modelled as waste in the Gabbs 2025 preliminary economic assessment (see P2's news release dated Oct. 7, 2025) and accordingly has the potential to reduce the strip ratio for the Sullivan zone and concomitantly add to the economics of the feasibility study currently under way.
Drill holes GBR-141 to GBR-143 and GBR-147 to GBR-149 were drilled from two drill pads 50 metres apart testing the gold-copper mineralization downdip at the Sullivan zone. Drill holes GBR-150 and GBR-151 were drilled from a drill pad 350 metres to the northwest of the GBR-141-to-GBR-143 drill pad also testing the gold-copper mineralization downdip at the Sullivan zone. The Sullivan zone remains open at depth and appears to be thickening to the southwest, with the highest grades in hole GBR-147 at the bottom of the hole.
An updated mineral resource estimate (MRE) for Gabbs is targeted for completion later this quarter based on drilling completed to Oct. 31, 2026, which comprises the following totals by zone:
- Car Body:
- Six diamond holes (780 metres);
- Sullivan:
-
14 diamond holes (2,023 metres);
- 43 RC holes (9,359 metres);
- Lucky Strike:
-
19 diamond holes (3,283 metres);
- 72 RC holes (13,612 metres).
The updated MRE will form the basis of a feasibility study on placing Gabbs in production, which is expected to be completed in the first quarter of 2027.
Qualified person
Ken McNaughton, MASc, PEng, chief exploration officer of P2 Gold, is the qualified person, as defined by National Instrument 43-101, responsible for the Gabbs project. Mr. McNaughton has reviewed, verified and approved the scientific and technical information in this news release.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs project on the Walker Lane trend in Nevada, where work to support a feasibility study is under way. A positive preliminary economic assessment (see footnote below) has outlined a long-life, mid-size mine at Gabbs with annual average production of 109,000 ounces gold and 33 million pounds copper, processing nine million tonnes per year over a 14.2-year mine life. The feasibility study is advancing using a nominal production rate of 12 million to 14 million tonnes per year targeting average annual production of 150,000 ounces gold and 45 million to 50 million pounds of copper per year. The Gabbs project has excellent infrastructure with access through paved Highway 361 and power and water on site. All zones on the property remain open and an infill and expansion drill program is under way. An updated mineral resource estimate will be prepared for Gabbs, which is expected to be completed in the fourth quarter.
Note: Please see the National Instrument 43-101 technical report titled "Preliminary Economic Assessment Gabbs Heap Leach and Mill Project, Nye County, Nevada, USA," which has an effective date of Oct. 7, 2025, and a report date of Nov. 20, 2025, and is available on the company's website and SEDAR+.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.