Mr. Rodrigo Roso reports
SCOTIA METALS SECURES OPTION TO ACQUIRE 100% OF NORDESTINA LITHIUM PROJECT, BRAZIL: SPODUMENE-BEARING PEGMATITES MAPPED ALONG A 3.3 KM CORRIDOR
Scotia Metals Corp. has entered into an option agreement dated Nov. 13, 2026, to acquire an indirect 100-per-cent interest in the Nordestina lithium project, a 16,566-hectare land package of nine mineral permits in northeastern Bahia state, Brazil, adding a second hard-rock lithium address to its Acadia lithium project in Nova Scotia.
Nordestina lies in the Sao Francisco Craton, in a granite-greenstone setting of the type that hosts some of the world's best-known zoned LCT (lithium-cesium-tantalum) pegmatites, including Tanco (Manitoba, Canada) and Bikita (Zimbabwe). The Nordestina pegmatites do not appear on the regional geological map of the Geological Survey of Brazil (CPRM); they were identified through historical small-scale artisanal workings and then mapped in the field during 2026.
"At the historic pit, spodumene, lepidolite and pollucite are present, indicating a highly fractionated LCT pegmatite system -- a lithium-cesium assemblage characteristic of the most evolved zones of world-class zoned pegmatites such as Bikita in Zimbabwe," said James Abson, vice-president of exploration of Scotia Metals. "Away from the pit, the outcrops look like the barren, feldspar-rich outer zones typically present in these systems, in which lithium mineralization tends to appear in the inner zones and toward the core -- and lithium minerals are appearing on the floor of the shallow workings."
"Our team has built and re-engineered lithium projects in Brazil, including Sigma's Grota do Cirilo and Lithium Ionic's Bandeira, and Nordestina is the kind of ground we look for, with lithium minerals at surface," said Rodrigo Roso, chief executive officer and director of Scotia Metals. "The Nordestina option complements our ongoing work at Acadia and gives us a second prospective hard-rock lithium project to evaluate through a disciplined, data-driven exploration process. Both projects offer distinct exploration opportunities, and we believe this approach gives Scotia multiple avenues to pursue new discoveries and create long-term shareholder value."
A zoned lithium-cesium system at surface
Geological mapping has recorded 280 observation points (either outcrop or boulder float), 166 of them pegmatite related. Suspected spodumene has been identified visually at 100 locations (still to be confirmed by laboratory analysis) along a north-south pegmatite-bearing corridor more than three kilometres (km) long, with lepidolite at 13 sites and pollucite, a cesium mineral, at three. Individual pegmatites appear to be several hundred metres long and zoned in places, with some exposures estimated at approximately 10 to 30 metres thick (exact thicknesses to be confirmed by future drilling).
The historical pit, opened during short-lived small-scale artisanal workings by a third party in the past (vendor information, not verified by the company), exposes spodumene, lepidolite and pollucite. Three nearby shallow satellite pits expose a flat-lying quartz-albite pegmatite sheet without lithium minerals in one and lepidolite on the floor of the other two. These observations are consistent with a zoned pegmatite model in which lithium-bearing inner zones may lie beneath barren outer zones; pitting and drilling are required to test this interpretation.
A key objective of the work program is to determine whether the historic pit, the satellite pits and the various spodumene outcrops along the corridor form a single zoned pegmatite complex or separate bodies.
Next steps at Nordestina:
- Integrate assay results from the 1,355 soil and rock samples with the magnetics, radiometrics, lidar (light detection and ranging) and mapping to define first drill targets;
- Test the link between the historical pit and the other outcrops along the corridor, and map fractionation trends toward the most evolved zones;
- Complete the regional soil coverage of the eight permits outside the main target, to test whether the corridor continues and whether other LCT pegmatites are present;
- Map and channel sample the walls of the historical pit once dewatering is complete.
First laboratory results are expected in late November, 2026, subject to laboratory capacity. Results will be reported as they are received and reviewed.
Two lithium addresses, one builder team
At Acadia, Scotia commenced its maiden diamond drill program in November, 2026, testing the potential bedrock source of spodumene-bearing boulders at the Green Wolf target (see news release dated Nov. 9, 2026). Nordestina adds a second, geologically distinct lithium address on terms that let exploration results, rather than a payment schedule, determine the company's capital commitment.
Option agreement terms
The option agreement is among Scotia Metals, as optionee, and Jean Claude Nydegger and Nilda Ferreira Cardozo Nydegger, as optionors, with Mine Invest Brazil Ltda. acting as intervening party and co-obligor. It grants Scotia an exclusive, irrevocable option to acquire 100 per cent of the equity of a Brazilian project-holding company into which the nine mineral permits and related assets will be transferred, giving Scotia an indirect 100-per-cent interest in the project at closing following exercise of the option. The principal terms are:
- Option payments: $10,000 (U.S.) per month during the option period. These option payments are not credited against the exercise price;
- Term: the option may be exercised at Scotia's sole discretion at any time up to and including May 31, 2028, subject to the terms of the option agreement;
- Exercise price: $2-million (U.S.) in cash for 100 per cent of the equity of the project-holding company, adjusted for any net debt or contingencies at closing;
- No work commitment: Scotia may explore the project at its own cost during the option period, including mapping, sampling, geophysics and drilling, but has no minimum expenditure obligation. Scotia may withdraw on 30 days of notice, after which no further monthly payments accrue;
- Existing exploration costs: Scotia will settle documented exploration costs incurred by R-Tek International DMCC in connection with Nordestina, in an amount not exceeding $210,000 (U.S.), subject to the terms of the option agreement and applicable exchange acceptance.
The obligations under the option agreement are subject to the transfer of the mineral permits to the project-holding company, including approval by Brazil's National Mining Agency (ANM), and acceptance of the Canadian Securities Exchange, as applicable.
Qualified person and technical notes
The scientific and technical information in this news release has been reviewed and approved by James Abson, PGeo, vice-president of exploration of Scotia Metals, and a qualified person as defined by National Instrument 43-101. Mr. Abson is not independent of the company. He visited the Nordestina project in August, 2026.
At Nordestina, mineral identifications are based on preliminary visual field observations; laboratory confirmation is pending. Soil and rock samples have been submitted to SGS Geosol, Belo Horizonte, Brazil, for analysis. Grab samples are selective by nature and are not necessarily representative of mineralization on the property. References to the Tanco and Bikita deposits are for geological context only; the company's qualified person has not verified information on those deposits and mineralization there is not necessarily indicative of mineralization at Nordestina. Information on the history of the small-scale workings was provided by the vendors and has not been verified by the company; the qualified person visited some of the workings during his site visit. No drilling has been completed at Nordestina and no mineral resource or mineral reserve has been established. Mapped extents are between observation points and do not imply a continuous mineralized body.
The Acadia information referenced in this news release has been previously disclosed by the company, including in its news release dated Nov. 9, 2026, and in its NI 43-101 technical report on the L3 lithium project (now the Acadia lithium project), effective June 15, 2026, available on SEDAR+.
About Scotia Metals Corp.
Scotia Metals is a mineral exploration company focused on the acquisition and advancement of lithium and battery metals projects. Its principal asset is the 100-per-cent-owned Acadia lithium project in southwestern Nova Scotia, Canada, along trend to the north and south of the Brazil Lake lithium property, with access to paved roads, grid power, ports and airports. Scotia also holds an option to acquire 100 per cent of the Nordestina lithium project in Bahia state, Brazil. The company's strategy is to build a portfolio of high-quality lithium projects through systematic exploration and disciplined acquisitions.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.