09:02:44 EST Mon 09 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Spanish Mountain Gold Ltd.
Symbol SPA
Shares Issued 538,101,157
Close 2026-11-06 C$ 0.225
Market Cap C$ 121,072,760
Recent Sedar+ Documents

Spanish Mountain Gold Expands Higher Grade Near Surface Mineralization Starting at 16 M Down the Hole Intersecting 40.7 M of 1.26 g/t Gold and Files Updated Preliminary Economic Assessment

2026-11-09 07:30 ET - News Release


VANCOUVER, British Columbia -- (Business Wire)

Spanish Mountain Gold Ltd. (the “Company” or “Spanish Mountain Gold”) (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to provide assay results recently received for 21 diamond drill holes on the Spanish Mountain Gold project (the “Project”) and announce it has filed on SEDAR+ an updated 2026 Preliminary Economic Assessment (2026 PEA). The 2026 PEA further outlines potential Project scale upside to its proposed mine located in the Cariboo Gold Corridor, British Columbia, Canada (see our news release dated September 21, 2026).

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20261109457634/en/

Figure 1: Drill Collar Location Map. The figure illustrates the collar locations for drill holes reported in this news release. Section lines correspond to cross-sections presented in Figures 2 to 6. Collar coordinates are summarized in Table 2. (Drilling planned and currently underway for condemnation and at Phoenix deposit excluded.)

Figure 1: Drill Collar Location Map. The figure illustrates the collar locations for drill holes reported in this news release. Section lines correspond to cross-sections presented in Figures 2 to 6. Collar coordinates are summarized in Table 2. (Drilling planned and currently underway for condemnation and at Phoenix deposit excluded.)

Approximately 47,011 metres of a planned 60,000 metres 2026 Feasibility Drill Program have been completed to date. The Company is continuing to advance the Project turning its focus now towards the completion of the 60 km drill program and a potential MRE update by year end 2026, advancing the feasibility study to completion in H1, 2028 and a subsequent build decision. This news release presents assay results from holes 26-DH-1419 to 26-DH-1436, 26-DH-1438, 26-DH-1439 and 26-DH-1441, and commentary on the potential expanded production scale scenario outlined in Section 24 of the 2026 PEA. Results are pending for 49 drilled holes.

Drilling Highlights:

  • 26-DH-1421 intersected 138.55 m of 0.50 g/t gold from 14.85 m, including 40.7 m of 1.26 g/t gold from 16.0 m.
  • 26-DH-1429intersected 174.0 m of 0.29 g/t gold from 51.0 m, including43.0 m of 0.93 g/t gold from 51.0 m and 7.55m of 0.38 g/t gold from 138.3 m.
  • 26-DH-1432intersected 219.20 m of 0.29 g/t gold from 44.0 m, including28.0 m of 0.96 g/t gold from 44.0 m.
  • 26-DH-1434intersected 241.0 m of 0.30 g/t gold from 44.0 m, including68.0 m of 0.52 g/t gold from 44.0 m and 93.0m of 0.36 g/t gold from 192.0 m.
  • 26-DH-1422, returned 155.0 m of 0.34 g/t gold from 161.0 m, including 86.07 m of 0.43 g/t gold from 170.0 m.
  • 26-DH-1435 intersected258.20 m of 0.29 g/t gold from 51.3 m, including 147.5 m of 0.41 g/t gold from 162.0 m.

Mike Buchanan, Vice President Exploration commented, “I am excited to join Spanish Mountain Gold as Vice President, Exploration. Spanish Mountain represents one of British Columbia’s premier gold development opportunities, combining a substantial mineral resource, exploration potential, and the opportunity for higher-grade mineralization to enhance the mine plan through reduced waste stripping and improved project economics.”

These drill holes are part of the 2026 Feasibility Drill Program, initiated in March 2026 targeting infill drilling and resource expansion at the Main Deposit. Other drill programs to provide information on condemnation, geotechnical, metallurgy, geochemistry and groundwater will be used to support the Feasibility Study which is targeted for completion in H1 2028.

2026 PEA – Alternate Project Development Plan

The 2026 PEA update presents the potential for a larger scale pit with moderate conceptual footprint impacts that would contain approximately 348 Mt of mineralized mill feed at a grade of 0.39 g/t or 4.4 Moz from measured, indicated and inferred mineral resources. As the company works to complete its 60 km 2026 Exploration Drill Program and continues to optimize its mill flowsheet utilizing coarse particle flotation and associated mill throughput enhancements, it expects to assess this alternate case as part of the feasibility study underway (as filed on SEDAR+, November 6, 2026).

Peter Mah, President, CEO and Director commented, “We are very encouraged with the ongoing positive drill results reported in recent news releases. We see the potential for an even larger scale gold operation in a region of British Columbia, Canada where jobs and economic opportunities are critically needed to support a vibrant community.”

Drill Results (Table 1)

Hole

From (m)

To (m)

Length (m)*

Gold Grade (g/t Au)

26-DH-1419

28.07

75.00

46.93

0.30

Including

45.90

75.00

29.10

0.43

26-DH-1420

No significant intercepts

26-DH-1421

14.85

153.40

138.55

0.50

Including

16.00

56.70

40.70

1.26

26-DH-1422

47.40

51.83

4.43

0.77

26-DH-1422

161.00

316.00

155.00

0.34

Including

170.00

256.07

86.07

0.43

26-DH-1423

36.00

48.00

12.00

0.30

26-DH-1424

167.00

176.00

9.00

0.36

Including

167.00

168.35

1.35

1.90

26-DH-1425

5.50

21.00

15.50

0.33

26-DH-1425

52.00

109.00

57.00

0.25

26-DH-1425

152.40

222.30

69.90

0.24

Including

152.40

161.00

8.60

0.46

Including

210.50

222.30

11.80

0.92

26-DH-1426

43.00

150.60

107.60

0.21

Including

88.00

91.20

3.20

0.70

Including

145.40

150.60

5.20

0.64

26-DH-1427

5.50

49.00

43.50

0.45

Including

23.90

36.00

12.10

1.01

26-DH-1427

198.30

204.00

5.70

0.64

26-DH-1428

173.46

176.20

2.74

0.98

26-DH-1428

280.58

288.18

7.60

0.69

26-DH-1429

51.00

225.00

174.00

0.29

Including

51.00

94.00

43.00

0.93

Including

138.30

145.85

7.55

0.38

26-DH-1430

108.00

121.65

13.65

0.38

26-DH-1430

212.00

222.00

10.00

0.98

26-DH-1431

68.00

103.35

35.35

0.37

Including

68.00

72.65

4.65

0.82

Including

92.00

103.35

11.35

0.69

26-DH-1432

44.00

263.20

219.20

0.29

Including

44.00

72.00

28.00

0.96

Including

126.00

130.00

4.00

1.16

Hole

From (m)

To (m)

Length (m)*

Gold Grade (g/t Au)

26-DH-1433

283.00

287.00

4.00

0.41

26-DH-1433

416.00

418.00

6.67

3.34

26-DH-1434

44.00

285.00

241.00

0.30

Including

44.00

112.00

68.00

0.52

Including

192.00

285.00

93.00

0.36

26-DH-1435

51.30

309.50

258.20

0.29

Including

162.00

309.50

147.50

0.41

26-DH-1436

78.00

82.00

4.00

2.62

26-DH-1436

194.00

256.00

62.00

0.19

26-DH-1438

44.00

239.00

195.00

0.27

including

75.00

162.00

87.00

0.39

26-DH-1439

16.60

28.45

11.85

0.70

Including

118.00

160.00

42.00

0.64

26-DH-1441

58.00

157.86

99.86

0.33

Including

102.00

106.00

4.00

1.39

Including

139.90

154.00

14.10

0.80

 

*Length is core length: True thickness is not determined.

Abbreviations: m = meters, g/t = grams per tonne, Au = gold

Table 2: Drill Collar Information

Hole ID

Easting

(mE)

Northing

(mN)

Elev

(m)

Azimuth

(°)

Inclination

(°)

Depth

(m)

Core

Size

26-DH-1419

604,717

5,827,703

1,138

120.1

60.0

153

HQ3

26-DH-1420

603,808

5,827,749

1,171

109.8

60.0

314

HQ3

26-DH-1421

604,622

5,827,548

1,189

123.3

59.4

231

HQ3

26-DH-1422

604,099

5,827,747

1,199

119.9

64.9

357

HQ3

26-DH-1423

604,725

5,827,673

1,139

120.2

59.9

114

HQ3

26-DH-1424

603,808

5,827,749

1,171

110.1

50.1

375

HQ3

26-DH-1425

604,137

5,827,604

1,223

120.2

70.1

315

HQ3

26-DH-1426

604,649

5,827,819

1,119

120.1

59.9

201

HQ3

26-DH-1427

604,088

5,827,619

1,215

119.8

69.9

282

HQ3

26-DH-1428

603,805

5,827,751

1,179

50.0

55.0

371

HQ3

26-DH-1429

604,603

5,827,840

1,124

120.2

60.0

228

HQ3

26-DH-1430

604,053

5,827,631

1,209

119.9

70.0

273

HQ3

26-DH-1431

604,578

5,827,866

1,120

121.6

59.9

240

HQ3

26-DH-1432

604,406

5,827,508

1,232

123.3

64.9

282

HQ3

26-DH-1433

603,737

5,827,735

1,169

113.2

64.9

449

HQ3

26-DH-1434

604,619

5,827,764

1,135

128.2

61

200

HQ3

26-DH-1435

604,445

5,827,464

1,249

117.6

64.3

369

HQ3

26-DH-1436

604,417

5,827,467

1,249

120.1

61.1

264

HQ3

26-DH-1438

604,524

5,827,720

1,159

120.1

60.0

240

HQ3

26-DH-1439

604,435

5,827,450

1,253

120.1

61.0

300

HQ3

26-DH-1441

604,551

5,827,709

1,159

119.9

60.0

255

HQ3

Collar coordinates and hole depths to be confirmed upon final survey data entry. Abbreviations: metres = m, Collar coordinates Datum: UTM NAD83 Zone 10N

Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)

Drill core is received daily from the rigs and logged for recovery, RQD, lithology, alteration, mineralization and vein style and intensity before samples are marked for cutting, with core photography being done to capture the marked sample intervals. The entire holes are sampled, with core sawn in half and samples labeled and bagged. The remaining half core is stored on-site. Numbered security tags are applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals to monitor laboratory performance, including blanks, certified reference materials and duplicates. Standards, blanks, preparation and field duplicates account for a minimum of 20% of the samples in addition to the laboratory's internal quality assurance programs. The QAQC program is overseen by the Company's Qualified Person, Michael Buchanan, P.Geo., Vice President Exploration.

The data verification process involves a multi-step approach to ensure accuracy and integrity. This includes a detailed quality control (QC) analysis of the data, which is performed using both internal and external platforms, such as the MxDeposit™ software. The QC checks involve monitoring the results of analyses of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verify the nature of the results presented.

Drill core samples were submitted to MSALABS's analytical facility in Prince George, British Columbia, for sample preparation and PhotonAssay™ analysis. The MSALABS facilities are accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with all analytical methods incorporating quality control materials at defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of the Company.

PhotonAssay™

The PhotonAssay™ method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay™ instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable subsample for 2 testing cycles (MSALABS Method CPA-Au1). The PhotonAssay™ instrument bombards 400- to 600-gram samples contained in sealed containers with gamma rays. Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). The method offers a gold detection range from 0.015 ppm (lower limit) to 10,000 ppm (upper limit).

Spanish Mountain Gold implemented Photon assaying after conducting two QAQC methodologies to validate the accuracy of PhotonAssay™ results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both MSA code FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish).

Multi-Elemental Analysis

For the 2026 drilling campaign, Spanish Mountain Gold routinely obtains multi-element determinations using a four-acid digestion followed by ICP-OES and ICP-MS analysis (MSA code IMS-230).

NSR Buy Back

The Company is also pleased to report that it has entered into an agreement (“Buy Back Agreement”) to buy back a portion of the net smelter interest that was originally granted to Robert Mickle (the “Mickle NSR”). The Mickle NSR is a 2.5% net smelter royalty interest on certain claims of the Spanish Mountain Gold Project. Pursuant to the Buy Back Agreement, the Company will acquire in a first closing 25% of the Mickle NSR (i.e., 0.625%) for $755,000, in cash, payable in stages, with the final payment due on July 1, 2030. In a second closing, the Company will acquire the vendor’s additional interest in the Mickle NSR (the exact percentage of which is subject to confirmation from the other parties with an interest in the Mickle NSR) for $5,000, in cash.

The first closing is expected to occur on November 10, 2026. Following the purchase of the additional interest from the vendor in the second closing, the Company will have the right to buydown the remaining Mickle NSR royalty to .6875% for $343,750. The second closing will occur on the earlier of receipt of confirmation from all holders of the Mickle NSR of the vendor’s additional interest, the commencement of commercial production at the Project, and July 1, 2030. The vendor is at arm’s-length to the Company.

Qualified Person

Michael Buchanan, MSc, P.Geo., Vice President Exploration for Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.

About Spanish Mountain Gold Ltd.

Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold project towards construction of the next gold mine in the Cariboo Gold Corridor, British Columbia. On May 1, 2026, the Company received the first instalment of US$22.5 million in connection with the sale of a 1.5% NSR to Wheaton Precious Metals for US$55 million (see news release from May 1, 2026). In Q2 2026, the Company initiated a feasibility study on the Project, which is fully funded and will position the Company to make a construction decision in 2028.

The Company is seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities, which the Company terms “The Relentless Pursuit of Better Gold”. For more information on Spanish Mountain Gold, please visit the Company's website: www.spanishmountaingold.com or the Company’s profile on www.sedarplus.ca.

On Behalf of the Board,
“Peter Mah”
President, Chief Executive Officer and Director
Spanish Mountain Gold Ltd.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING INFORMATION:

Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and includes but is not limited to information with respect to exploration drilling extending gold mineralization, the potential to reduce waste stripping requirements and support enhancements to the 10-year mine plan, the potential production scale upside, the receipt of the two remaining instalments from the sale of the 1.5% NSR to Wheaton Precious Metals for US$55 million, the feasibility study being fully-funded, the results of the feasibility study, and the timeline to complete the feasibility study in H1 2028 and make a construction decision in 2028. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.

Contacts:

For more information, contact:
Peter Mah
(604) 601-3651
info@spanishmountaingold.com

Source: Spanish Mountain Gold Ltd.

© 2026 Canjex Publishing Ltd. All rights reserved.