Mr. Luis Azevedo reports
BRAVO INTERCEPTS 38.0M AT 2.6 G/T PGM+AU + 0.29% NI, AND 29.0M AT 3.2 G/T PGM+AU + 0.21% NI AT LUANGA
Bravo Mining Corp. has released assay results from 22 infill and stepout drill holes (10 from the Central sector, five from the North sector and seven from the Southwest sector) at its 100-per-cent-owned Luanga palladium-plus-platinum-plus-rhodium-plus-gold-plus-nickel deposit, located in the Carajas mineral province, Para state, Brazil.
"These results from infill and extensional drilling in the Central, Southwest and North sectors continue to show the potential to expand and upgrade Luanga's mineral resource. Results continue to show consistency in grades and/or thicknesses intersected in earlier drilling and extend the mineralization in some areas to twice that previously intercepted. Furthermore, drilling reported herein shows evidence of high-grade gold mineralization, which indicates remobilized mineralization within Luanga, similar to the massive sulphide Ni mineralization recently reported in DDH16LU373," said Luis Azevedo, chairman and chief executive officer. "Concurrently, our copper-gold team has commenced their maiden drill program at the Luanga property, targeting iron oxide copper-gold and massive-sulphide-style copper-gold-dominated mineralization."
Highlights include:
-
The 2026 infill and extensional drill program continues to successfully define mineralization at depth and increasing drill density, supporting the next mineral resource estimate (MRE).
-
Results reported herein continue to demonstrate similar or better mineralized thicknesses and/or PGM+Au (platinum group metal plus gold) grades, commonly associated with increased Ni sulphide grades, in the main sulphide zone (MSZ).
-
DDH26LU350 shows further evidence of a potentially new style of remobilized mineralization, remobilized within the greater Luanga intrusion.
-
The interval of three metres at 18 grams per tonne PGM+Au, including 17.9 g/t Au, contains minor PGM+Ni+Cu, suggesting a Luanga-related source and potentially opening new exploration opportunities within and proximal to Luanga.
Luanga drilling update
Drilling results have been received from 22 infill and stepout drill holes at the Luanga PGM+Au+Ni deposit, comprising 10 holes from the Central sector, five from the North sector and seven from the Southwest sector. All drill holes reported herein are angled holes (minus 60 degrees), toward azimuth of 090 degrees, 330 degrees or 360 degrees depending on which sector. Together, this set of drill holes comprises a total of 5,107 metres of diamond drilling.
Section 1 in the Central sector illustrates extensional drilling, with three new drill holes (DDH26LU331, DDH26LU337 and DDH26LU340) progressively stepped below previously reported 2024 Bravo drill hole DDH24LU286. The 2026 drilling has extended the MSZ mineralization from previously defined depths of less than 200 metres to approximately 400 metres below surface, with grades and mineralized thicknesses remaining consistent with those observed up dip.
Mineralization remains open at depth, highlighting the potential to define additional inferred mineral resources at relatively shallow depths.
Section 2 in the Central sector is also an extensional drill section, with DDH26LU350 intersecting the MSZ approximately 100 metres below previously reported 2023 Bravo drill hole DDH23LU183. Drilling on this section aims to support the potential definition of new inferred mineral resources at depths that are still relatively shallow. This hole confirms that the MSZ mineralization continues at depth, with similar grades and mineralized thicknesses to those previously intersected up dip.
The 2026 drilling (DDH26LU350) extends the MSZ definition from a previously defined depth of approximately 175 metres to approximately 250 metres below surface in this area. Mineralization remains open at depth and is still considered potentially amenable open-pit mining, with potential to continue to extend resources in the future.
Within hole DDH26LU350, there is also a narrow zone of high-grade gold mineralization within the ultramafic footwall at Luanga, relatively close to surface (approximately 60 metres). Macroscopically, this interval was logged as an ultramafic rock (clinopyroxenite) with 1 per cent to 2 per cent disseminated sulphides, mostly pyrrhotite.
Throughout Central and Southwest sectors, the stratigraphy or igneous layering at in the Luanga complex has been overturned, bringing the ultramafic footwall to surface. Higher-grade mineralization is believed to be related to remobilization of mineralization from within the greater Luanga intrusion. The interval of three metres at 18 g/t PGM+Au is dominated by three metres at 17.9g/t Au, while the presence of minor amounts of PGM+Ni+Cu would clearly point to Luanga PGM+Au mineralization as a source. This further supports other observations regarding remobilization of mineralization at Luanga, such as some of the massive sulphide Ni mineralization in DDH26LU373 (reported Nov. 16, 2026), which graded 23.6 metres at 0.85 per cent Ni, 0.49 per cent Cu and 1.07 g/t PGM+Au, including 8.4 metres at 1.59 per cent Ni, 0.95 per cent Cu and 1.94 g/t PGM+Au.
Section 3 in Southwest sector shows an infill section, where drilling on this section aims to support upgrading the inferred mineral resources to the indicated category. Drilling on this section shows that the MSZ mineralization continues at depth, in the fresh rock, with similar grades and mineralized thicknesses from hole to hole.
Near-surface mineralization defined by DDH26LU348 successfully supports the continuity of mineralization and the potential to upgrade inferred mineral resources closer to surface while showing significantly greater mineralized thicknesses; 2023 drill hole 22LU184 also demonstrates high-grade remobilized mineralization in the stratigraphic footwall, physically above the overturned main Luanga PGM+Au mineralization.
The fresh rock component of the mineralized intersection compares favourably with previously reported fresh rock intersections, while the oxidized portion is likely influenced by dispersion and supergene effects, resulting in a much broader mineralized intersection.
Drill results status update
In total, 476 drill holes have been completed by Bravo to date, for 106,782 metres, including eight metallurgical holes (not subject to routine assaying). Results have been reported for 419 Bravo drill holes to date. Assay results for 49 holes are currently outstanding (excluding the metallurgical holes), which mostly relate to exploration drilling outside the Luanga PGM+Au+Ni resource area. In total, 58 trenches have been completed to date (for 10,901 metres), with all results reported.
About Bravo Mining Corp.
Bravo is a Canadian- and Brazil-based mineral exploration and development company focused on advancing its PGM, nickel and copper-gold Luanga project in the Carajas mineral province, Para state, Brazil. Bravo is one of the most active explorers in Carajas.
The team, comprising local and international geologists, has a proven record of PGM, nickel and copper discoveries in the region. They have successfully taken a past IOCG greenfield project from discovery to development and production in Carajas.
The Luanga project is situated on mature freehold farming land and benefits from being located close to operating mines and a mining-experienced work force, with excellent access and proximity to existing infrastructure, including road, rail and hydroelectric grid power. Bravo's current environmental, social and governance activities include planting more than 56,000 high-value trees in and around the project area and hiring and contracting locally.
Technical disclosure
Technical information in this news release has been reviewed and approved by Simon Mottram, FAusIMM (fellow of Australian Institute of Mining and Metallurgy), president of Bravo Mining, who serves as the company's qualified person as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects. Mr. Mottram has verified the technical data and opinions contained in this news release.
Assay methodologies and quality assurance/quality control
Samples follow a chain of custody between collection, processing and delivery to the SGS Geosol laboratory in Parauapebas, state of Para, Brazil. The drill core is delivered to the core shack at Bravo's Luanga site facilities and processed by geologists, who insert certified reference materials, blanks and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas SGS Geosol laboratory by Bravo staff. Additional information about the methodology can be found on the SGS Geosol website in its analytical guides. Information regarding preparation and analysis of historic drill core is also presented in the table below, where the information is known.
QA/QC is maintained internally at the lab through rigorous use of internal certified reference materials, blanks and duplicates. An additional QA/QC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QA/QC sample returns an unacceptable value, an investigation into the results is triggered, and, when deemed necessary, the samples that were tested in the batch with the failed QA/QC sample are retested.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.