01:27:14 EST Wed 04 Mar 2026
Enter Symbol
or Name
USA
CA



Blackrock Silver Corp
Symbol BRC
Shares Issued 360,631,930
Close 2026-03-02 C$ 2.29
Market Cap C$ 825,847,120
Recent Sedar+ Documents

Blackrock Silver receives Tonopah air quality permit

2026-03-03 15:04 ET - News Release

Mr. Andrew Pollard reports

BLACKROCK SILVER RECEIVES FIRST OF THREE KEY PERMITS FOR THE TONOPAH WEST PROJECT

The Nevada Department of Environmental Protection (NDEP), through the Bureau of Air Pollution Control, has issued the Class II air quality and surface disturbance permit for Blackrock Silver Corp.'s Tonopah West mineral project, located along the Walker Lane trend in Nye and Esmeralda counties, Nevada, United States.

The permit allows for the disturbance of up to 150 acres (60.7 hectares) at Tonopah West with appropriate dust control measures and a continuing program using the best practical methods to prevent particulate matter from becoming airborne. The term of the permit is five years, which can be extended and modified as Tonopah West moves toward permitting and construction of its proposed exploration decline, test mining and bulk sample extraction programs.

Data collection continues for the hydrogeological and geochemical programs that will form the basis for the water pollution control permit. Five humidity cells are in process to review acid-generating potential of the waste and mineralized lithologies that will be encountered and transported to the surface during the tunnelling and construction of the exploration decline, including stockpiles for mineralized material mined as part of the bulk sample program.

The hydrogeological program is designed to understand the groundwater dynamics focused on potential flow and volumes to support required management and disposal as needed during the test mining and bulk sample phase of the program. Waste dump, stockpiles and portal entry engineering designs are on schedule and will be completed and used to calculate surface disturbance that will be the cornerstone for the modification to the Nevada reclamation permit. The permitting process is on schedule, with all permits anticipated by mid-2027. Once all permits are in hand, the company will decide when to commence with the exploration decline, test mining and bulk sample extraction programs at Tonopah West.

Qualified person

Blackrock's exploration activities at Tonopah West are conducted and supervised by William Howald, executive chairman of Blackrock. William Howald, AIPG certified professional geologist No. 11041, is a qualified person as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects. He has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Blackrock Silver is an American-focused emerging primary silver developer systematically advancing the high-grade Tonopah West project, situated in the historic Queen of the Silver Camps, in a jurisdiction consistently ranked as one of the top mining regions globally. The company is backstopped by a veteran board and technical team with a proven record of discovering, financing and building major precious metal mines in Nevada and globally. Blackrock is committed to establishing a secure, high-margin, domestic supply of silver and gold.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.