07:23:44 EST Wed 28 Jan 2026
Enter Symbol
or Name
USA
CA



Banyan Gold Corp.
Symbol BYN
Shares Issued 414,377,982
Close 2026-01-27 C$ 1.23
Market Cap C$ 509,684,918
Recent Sedar+ Documents

ORIGINAL: Banyan Gold Intersects High-Grades and Visible Gold at AurMac, Yukon, Canada

2026-01-27 23:37 ET - News Release

VANCOUVER, BC / ACCESS Newswire / January 27, 2026 / Banyan Gold Corp. (the "Company" or "Banyan") (TSXV:BYN)(OTCQB:BYAGF) is pleased to announce it has intersected high-grade gold ("Au") mineralization in the Airstrip Deposit ("Airstrip") and Aurex Hill Zone ("Aurex Hill") at its AurMac Project ("AurMac"), Yukon, Canada.

Aurex Hill Intersections (East Powerline Deposit) Highlights:

  • AX-25-796 - 0.84 g/t Au over 38.9m within 0.64 g/t Au over 76.0m; including high-grade intervals of 26.35 g/t Au over 0.5m,

  • AX-25-802 - 2.82 g/t Au over 11.8m within 0.78 g/t Au over 51.1m; including high-grade interval of 7.26 g/t Au over 4.3m

Airstrip Intersections Highlights:

  • AX-25-720 - 1.10 g/t Au over 6.5m within 0.30 g/t Au over 38.9m; includes high-grade intervals of 16.70 g/t Au over 0.4m and 13.80 g/t Au over 1.0m,

  • AX-25-731 - 2.27 g/t Au over 5.0m, within 1.24 g/t Au over 11.0m; includes high-grade interval of 14.10 g/t Au over 0.5m,

  • AX-25-758 - 0.90 g/t Au over 18.9m, within 0.51 g/t Au over 43.8m; includes 17.14 g/t Au over 0.3m,

  • AX-25-792 - 4.25 g/t Au over 3.3m within 0.60 g/t Au over 37.6m; includes 14.60 g/t Au over 0.5m

"The high-grade gold mineralization in the Aurex Hill zone (East Powerline Deposit) and the Airstrip Deposit reinforces our understanding of the high-grade mineralization and achieves the objective of targeting areas suitable for starter pits," said Tara Christie, President and CEO. "In the Aurex Hill zone, high-grade sheeted quartz veins show potential for further expansion of the deposit, while the high-grade structures (marl) with brecciated quartz represent a new drill target (Figure 4). In Airstrip, the skarn mineralization in Cal 2 (lower horizon) shows consistent high-grade gold mineralization with holes AX-25-792 and AX-25-731, indicating the potential for eastward expansion at Airstrip (Figure 7 and 10)."

The high-grade gold drill core from Airstrip, Powerline and the very high-grade silver drill core (News release, January 22, 2026) will be available to view at the AMEBC roundup core shack #823 on January 28-29th, 2026.

Figure 1: Plan map of highlight gold intersections in Aurex Hill
Figure 2: Cross-section 468850E in Aurex Hill. High-grade mineralization in AX-25-802 has potential to convert waste blocks and extend mineralized domains that are open up and down dip as well as along strike.
Figure 3: Cross-section 469050E in Aurex Hill Zone has potential to extend high-grade mineralization in satellite pits in east Powerline.
Figure 4: High-grade gold mineralization in AX-25-802 is associated with zones of marl with associated brecciated quartz veins.
Figure 5: Sheeted quartz veins in AX-25-796 host high-grade gold mineralization and visible gold.
Figure 6: Visible gold grains from drillholes AX-25-796. Multiple instances of visible gold intergrown with Bi-Sulphosalts were intersected at 42.3m (left) and 115.1m (right). These examples of coarse-grained gold mineralization in sheeted quartz veins are typical of Powerline-style mineralization, indicating near-surface high-grade mineralized domains have potential to be expanded in the Aurex Hill area east of Powerline.
Figure 7: Plan map of highlight intersections in Airstrip for this release.
Figure 8: Cross-section 466400E in Airstrip. Skarn mineralization intersected in drill holes AX-25-747 have potential to expand conceptual pit to the south and west of Airstrip.
Figure 9: Cross-section 466800E in Airstrip. Skarn mineralization inAX25-756 and -758 have potential to convert waste blocks at southern edge of the conceptual pit as well as improve continuity of the Cal 1 horizon.
Figure 10: Cross-section 467900E in Airstrip. Intersection in drillhole AX-25-792 has potential to extend conceptual satellite pit in the east of Airstrip

Table 1: Diamond drillhole assay intercepts for Aurex Hill in this release

Hole ID

depth from (m)

depth to (m)

Au Interval (m)

Au Interval (g/t)

AX-25-759

26.2

74.0

47.8

0.66

including

29.2

31.2

2.0

6.85

including

30.2

31.2

1.0

9.72

and including

51.4

52.7

1.3

7.55

and

93.5

94.5

1.0

0.57

and

108.0

109.5

1.5

0.69

AX-25-765

33.5

38.0

4.5

1.66

including

33.5

36.5

3.0

2.13

and

51.0

55.0

4.0

0.62

and

78.5

80.0

1.5

0.53

and

93.2

94.5

1.3

1.77

and

123.2

124.7

1.5

0.42

and

135.5

137.0

1.5

0.57

AX-25-768

26.0

41.2

15.2

0.47

including

38.0

39.6

1.6

1.77

and

58.3

70.8

12.5

0.49

including

58.3

59.7

1.4

2.19

and

120.9

122.9

2.0

0.86

including

120.9

122.1

1.2

1.16

and

175.4

176.6

1.2

0.31

AX-25-796

3.0

54.2

51.2

0.42

including

3.0

6.1

3.1

2.55

and including

30.0

30.4

0.4

1.65

and including

41.2

54.2

13.0

0.46

including

53.5

54.2

0.7

3.06

and

76.2

152.2

76.0

0.64

including

81.3

92.5

11.2

1.07

including

81.3

82.0

0.7

6.74

and including

91.0

92.5

1.5

4.89

and including

105.2

144.1

38.9

0.84

including

105.2

105.6

0.4

7.29

and including

115.1

115.6

0.5

26.35

and including

125.0

125.6

0.6

5.57

and including

127.7

138.4

10.7

0.62

and

176.3

176.8

0.5

10.03

AX-25-802

11.5

18.8

7.3

0.29

and

23.5

27.6

4.1

0.27

and

36.4

38.0

1.6

0.45

and

51.8

52.7

0.9

0.88

and

85.6

88.2

2.6

0.44

and

107.0

108.5

1.5

0.42

and

131.4

182.5

51.1

0.78

including

154.2

166.0

11.8

2.82

including

161.7

166.0

4.3

7.26

including

164.5

166.0

1.5

12.60

Table 2: Diamond drillhole assay intercepts for Airstrip in this release

HOLE NUMBER

depth from

depth to

Au Interval (m)

Au Interval (g/t)

AX-25-686

15.0

16.5

1.5

0.66

and

52.6

70.2

17.6

0.33

including

52.6

53.9

1.3

1.14

and

91.5

112.4

20.9

0.64

including

91.5

103.5

12.0

0.98

and

138.2

148.5

10.3

1.03

including

143.1

144.4

1.3

5.22

and

172.0

173.5

1.5

0.32

and

186.0

196.5

10.5

0.31

AX-25-689

19.3

20.4

1.1

0.51

and

74.5

76.0

1.5

0.68

and

87.6

115.8

28.2

0.37

including

106.0

107.4

1.4

1.97

and

146.5

167.4

20.9

0.33

and

186.2

189.1

2.9

0.96

including

186.2

187.6

1.4

1.18

AX-25-691

15.5

17.0

1.5

0.42

and

105.5

131.5

26.0

0.39

including

113.0

122.5

9.5

0.77

and

149.0

243.2

94.2

0.54

including

157.6

182.2

24.6

0.35

and including

198.4

220.8

22.4

0.52

including

220.4

220.8

0.4

6.82

and including

240.1

242.3

2.2

9.09

including

241.0

241.6

0.6

14.10

and

262.8

272.9

10.1

0.69

including

267.1

268.5

1.4

3.49

AX-25-720

12.9

51.8

38.9

0.30

including

45.3

51.8

6.5

1.10

including

45.3

45.6

0.3

14.40

and

82.4

84.9

2.5

9.81

including

82.4

82.8

0.4

16.70

and including

83.9

84.9

1.0

13.80

AX-25-731

36.2

47.2

11.0

1.24

including

37.7

42.7

5.0

2.27

including

38.6

39.1

0.5

14.10

and

73.8

74.4

0.6

0.91

and

79.0

80.5

1.5

0.40

AX-25-742

124.4

126.0

1.6

0.36

and

143.5

150.0

6.5

0.73

including

149.0

150.0

1.0

3.12

and

176.0

180.5

4.5

0.65

and

201.6

202.5

0.9

0.53

and

208.0

210.7

2.7

0.39

and

218.6

220.2

1.6

0.39

and

235.2

237.0

1.8

8.27

including

235.2

235.8

0.6

25.40

AX-25-747

56.8

63.4

6.6

0.57

including

61.9

63.4

1.5

1.70

and

86.0

101.4

15.4

0.61

including

92.9

94.2

1.3

4.66

and

112.5

114.2

1.7

0.89

and

142.3

213.6

71.3

0.50

including

142.3

143.2

0.9

3.38

and including

161.5

162.6

1.1

1.54

and including

189.0

212.2

23.2

0.83

including

191.2

194.6

3.4

3.25

and including

211.2

212.2

1.0

4.75

and

234.7

236.7

2.0

0.30

AX-25-749

81.5

82.0

0.5

0.32

and

100.5

102.5

2.0

0.83

and

119.0

132.6

13.6

0.28

and

149.1

167.3

18.2

0.56

including

149.1

151.0

1.9

2.86

and including

163.0

164.6

1.6

1.02

and

211.4

218.5

7.1

0.43

and

227.3

233.3

6.0

0.31

AX-25-756

64.1

131.6

67.5

0.35

including

66.6

70.2

3.6

0.90

and including

87.2

90.2

3.0

1.00

and including

110.3

126.0

15.7

0.55

including

125.0

126.0

1.0

3.81

and

149.9

171.9

22.0

0.34

including

164.7

167.4

2.7

1.24

and

189.7

191.2

1.5

0.49

AX-25-758

53.0

61.0

8.0

0.45

including

59.4

61.0

1.6

1.89

and

81.7

82.8

1.1

1.35

and

91.2

92.4

1.2

0.46

and

95.2

95.8

0.6

0.56

and

135.2

179.0

43.8

0.51

including

160.1

179.0

18.9

0.90

including

160.1

160.4

0.3

17.14

and including

174.4

175.3

0.9

4.64

and

200.7

203.0

2.3

0.51

AX-25-762B

7.5

9.0

1.5

0.76

and

65.3

76.2

10.9

1.13

including

66.6

73.2

6.6

1.41

including

68.1

69.3

1.2

4.64

and

93.8

139.1

45.3

0.29

including

107.3

108.4

1.1

1.68

and including

121.9

135.5

13.6

0.39

and

174.0

178.5

4.5

2.03

including

175.9

178.5

2.6

3.14

including

175.9

176.2

0.3

19.60

and

205.6

206.0

0.4

0.88

and

212.2

213.3

1.1

0.32

and

215.8

217.8

2.0

0.57

and

233.5

235.0

1.5

0.36

and

246.0

247.5

1.5

0.33

and

250.5

252.0

1.5

0.38

and

255.0

256.5

1.5

0.33

and

258.0

259.5

1.5

0.33

and

275.9

277.5

1.6

0.32

and

285.6

291.5

5.9

0.82

including

285.6

287.0

1.4

2.48

AX-25-775

25.7

27.2

1.5

0.32

and

28.7

30.2

1.5

0.35

and

112.1

114.6

2.5

0.54

and

133.1

185.8

52.7

0.47

including

153.0

153.4

0.4

1.57

including

170.0

185.8

15.8

1.09

including

175.6

185.8

10.2

1.58

including

175.6

178.9

3.3

2.68

and

213.5

215.9

2.4

0.42

and

223.0

224.0

1.0

0.87

and

242.6

243.4

0.8

1.30

and

277.5

278.5

1.0

0.32

and

313.1

314.6

1.5

0.57

AX-25-780

13.0

81.3

68.3

0.40

including

28.0

31.5

3.5

1.33

and including

76.0

81.3

5.3

2.12

including

80.2

80.6

0.4

17.10

AX-25-792

52.4

55.4

3.0

1.22

including

52.4

53.9

1.5

1.98

and

129.1

130.6

1.5

0.31

and

135.1

136.6

1.5

0.50

and

141.4

143.0

1.6

0.30

and

160.2

197.8

37.6

0.60

including

177.4

180.7

3.3

4.25

including

177.4

178.9

1.5

8.43

including

177.4

177.9

0.5

14.60

and including

196.7

197.8

1.1

3.59

Note: Calculated true widths are approx. 90% of reported drill widths.

Table 3: Collar Locations for drillholes in this release

HOLE ID

EASTING (m)

NORTHING (m)

ELEVATION (m)

Depth (m)

Azimuth

Dip

AX-25-686

467313

7083850

787

199.6

0

-60

AX-25-689

467285

7083788

786

231.7

0

-60

AX-25-691

467190

7083765

785

274.3

0

-60

AX-25-720

466562

7084003

736

91.4

0

-60

AX-25-731

467700

7083976

792

85.3

0

-60

AX-25-742

466503

7083708

728

251.5

0

-60

AX-25-747

466382

7083763

726

251.5

0

-60

AX-25-749

466308

7083817

713

256.0

0

-60

AX-25-756

466706

7083821

756

201.2

0

-60

AX-25-758

466774

7083743

763

278.8

0

-60

AX-25-759

469621

7082616

988

147.8

0

-60

AX-25-762B

466802

7083830

765

310.9

0

-60

AX-25-765

469680

7082559

992

175.3

0

-60

AX-25-768

469735

7082563

994

196.6

0

-60

AX-25-775

466855

7083774

767

326.1

335

-53

AX-25-780

466812

7084016

770

150.9

0

-60

AX-25-792

467882

7083972

794

202.7

0

-60

AX-25-796

469057

7082690

965

189.0

0

-60

AX-25-802

468849

7082657

943

185.9

0

-60

Analytical Method and Quality Assurance/Quality Control Measures

All diamond drill core was systematically logged and photographed by Banyan geology personnel. All core samples (HTW and NTW diameter) were split on-site at Banyan's core processing facilities. Once split, half samples were placed back in the core boxes with the other half of split samples sealed in poly bags with one part of a three-part sample tag inserted within. Samples were delivered by Banyan personnel or a dedicated expediter to the Bureau Veritas, Whitehorse preparatory laboratory where samples are prepared and then shipped to Bureau Veritas's Analytical laboratory in Vancouver, B.C. for pulverization and final chemical analysis.

Core splits reported in this news release were analysed by Bureau Veritas of Vancouver, B.C., utilizing the four-acid digestion ICP-ES 35-element MA-300 or ICP-ES/MS 59-element MA-250 analytical package with FA-450 50-gram Fire Assay with AAS finish for gold on all samples. Samples returning >10 g/t Au were reanalysed by fire assay with gravimetric finish on a 50g sample (FA-550). High-grade samples with documented visible gold are also analysed using metallic screen fire assay (FS-652). Bureau Veritas is an accredited lab following ISO/IEC 17025:2017 SCC File Number 15895. A robust system of standards, ¼ core duplicates and blanks has been implemented in the 2025 exploration drilling program and is monitored as chemical assay data becomes available.

Qualified Persons

Duncan Mackay, M.Sc., P.Geo., is a "Qualified Person" as ‎defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101"), and has reviewed and approved the content of this news release in respect of all disclosure other than the MRE.‎ Mr. Mackay is Vice President Exploration for Banyan and has verified the data disclosed in this news release, including the sampling, ‎‎analytical and test data underlying the information.

Upcoming Events

  • AME Roundup, Vancouver, January 28 - 29

    • Core Shack Booth 823

  • Money Talks: World Outlook Financial Conference, Vancouver, February 6 - 7

  • 121 Mining Investment, Cape Town, February 9 - 10

  • African Mining Indaba, Cape Town, February 9 - 12

  • BMO 35rd Global Metals, Mining & Critical Minerals Conference, Hollywood, FL, February 22 - 25

About Banyan

Banyan's primary asset, the AurMac Project is located in the Traditional Territory of First Nation of Na-Cho Nyäk Dun, in Canada's Yukon Territory. The current Mineral Resource Estimate ("MRE") for the AurMac Project has an effective date of June 28, 2025 and comprises an Indicated Mineral Resource of 2.274 million ‎ounces of gold ("Au") (112.5 M tonnes at 0.63 g/t) and an Inferred Mineral Resource of 5.453 Moz of Au (280.6 M tonnes at 0.60 g/t ) (as defined in the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition ‎Standards for Mineral Resources & Mineral Reserves incorporated by reference into NI 43‑101). The 303 square kilometres ("sq km") AurMac Project lies 40 kilometres from Mayo, Yukon. The AurMac Project is transected by the main Yukon highway and benefits from a 3-phase powerline, existing power station and cell phone coverage.

Table 4: Pit-Constrained Indicated and Inferred Mineral Resources - AurMac Project

Deposit

Gold Cut-Off (g/t)

Tonnage
(M Tonnes)

Average Gold Grade (g/t)

Contained Gold (Moz)

Indicated MRE

Airstrip

0.30

27.7

0.69

0.611

Powerline

0.30

84.8

0.61

1.663

Total Combined Indicated MRE

0.30

112.5

0.63

2.274

Inferred MRE

Airstrip

0.30

10.1

0.75

0.245

Powerline

0.30

270.4

0.60

5.208

Total Combined Inferred MRE

0.30

280.6

0.60

5.453

Notes to Table 3:

  1. The effective date for the MRE is June 28, 2025, and was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent "Qualified Person" within the meaning of NI 43-101.

  2. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.

  3. The CIM Definition Standards were followed for classification of Mineral Resources. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these Inferred Mineral Resources as an ‎Indicated Mineral Resource.

  4. Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using a US$/CAN$ exchange rate of 0.73 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$2,050/ounce, US$2.50/t mining cost, US$10.00/t processing cost, US$2.00/t G+A, 90% gold recoveries, and 45° pit slopes.1

  5. The number of tonnes and ounces was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.

In addition to the AurMac Project, the Company holds the Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the "Hyland Project") in the Traditional Territory of the Kaska Nations, closest to the Liard First Nation and Daylu Dena Council. The Hyland Project represents a sediment hosted, structurally controlled, intrusion related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads. The updated MRE comprises an Indicated Mineral Resource of 337 thousand ("K") ‎ounces ("oz") of gold ("Au") and 2.63 million ("M") oz of silver ("Ag") (11.3 M tonnes of ore at 0.93 g/t Au and 7.27 g/t Ag), and an Inferred Mineral Resource of 118 Koz of Au and 0.86 Moz Ag (3.9 M tonnes of ore at 0.95 g/t Au and 6.94 g/t Ag)(as defined in the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition ‎Standards for Mineral Resources & Mineral Reserves incorporated by reference into NI 43‑101) effective September 1, 2025 and with technical report filed on Sedar on October 27, 2025.

Banyan also holds the Nitra Gold Project, a grassroots exploration project located in the Mayo Mining district, approximately 10 km west of the AurMac Gold property. The Nitra Property lies in the northern part of the Selwyn basin and is underlain by metaclastic rocks of the Late Proterozoic Yusezyu Formation of the Hyland Group, similar to lithologies hosting portions of the AurMac Project. Middle Cretaceous Tombstone Plutonic suite intrusions occur along the property including the Morrison Creek and Minto Creek stocks. The property is 100% owned and operated by Banyan and covers approximately 313.9 sq km. The property is accessible by road along the Silver Trail Highway, South McQuesten Road and 4x4 roads.

Banyan trades on the TSX-Venture Exchange under the symbol "BYN" and is quoted on the OTCQB Venture Market under the symbol "BYAGF". For more information, please visit the corporate website at or contact the Company.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"
Tara Christie
President & CEO

For more information, please contact:

Tara Christie • 778 928 0556 • tchristie@banyangold.com
Jasmine Sangria • 604 312 5610 • jsangria@banyangold.com

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

FORWARD LOOKING INFORMATION: This release contains forward-looking information, which is not comprised of historical facts and is based upon the Company's current internal expectations, estimates, projections, assumptions and beliefs. Such information can generally be identified by the use of forwarding-looking wording such as "may", "will", "expect", "estimate", "anticipate", "intend(s)", "believe", "potential" and "continue" or the negative thereof or similar variations, Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the potential for resource expansion; the potential to convert inferred resources into indicated resource, mineral resource estimates; mineral recoveries and anticipated mining costs. Factors that could cause actual results to differ materially from such forward-looking information include uncertainties inherent in resource estimates, continuity and extent of mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan's public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

1 The gold price and cost assumptions are consistent with current pricing assumptions and costs and, in particular, with those employed for recent technical reports for similar pit-constrained Yukon gold projects.

SOURCE: Banyan Gold Corp.



View the original press release on ACCESS Newswire

© 2026 Canjex Publishing Ltd. All rights reserved.