11:02:48 EDT Thu 30 Jul 2026
Enter Symbol
or Name
USA
CA



Hot Chili Limited
Symbol HCH
Shares Issued 202,863,198
Close 2026-07-29 C$ 1.505
Market Cap C$ 305,309,113
Recent Sedar+ Documents

ORIGINAL: Hot Chili Quarterly Report - Period Ending 30 June 2026

2026-07-30 07:00 ET - News Release

Hot Chili Quarterly Report - Period Ending 30 June 2026

PR Newswire

PERTH, Australia, July 30, 2026 /PRNewswire/ --

Highlights

La Verde Emerging as Hot Chili Cornerstone Asset

  • Drilling at the Company's La Verde copper-gold (Cu-Au) porphyry deposit in coastal Chile continued during the quarter, with a third drill rig commencing in May.
  • La Verde is one of Chile's most significant new coastal Cu-Au porphyry discoveries and is fast-shaping as a cornerstone asset for the Company's coastal range Costa Fuego copper-gold (Cu-Au) project.
  • Standout results reported during the quarter included:
    • DKD044 recorded 391.1 m grading 0.51% CuEq¹ (0.42% Cu, 0.11 g/t Au) from surface, including:
      • 17.8 m grading 0.68% CuEq (0.63% Cu, 0.06 g/t Au) from surface
      • 40.7 m grading 0.60% CuEq (0.50% Cu, 0.12 g/t Au) from 103.3 m
      • 85.4 m grading 0.61% CuEq (0.50% Cu, 0.15 g/t Au) from 160 m
      • 19.7 m grading 0.70% CuEq (0.57% Cu, 0.15g/t Au) from 276.1 m
    • DKP053 recorded 250 m grading 0.50% CuEq (0.39% Cu, 0.14g/t Au) from 64 m depth, including
      • 36 m grading 0.72% CuEq (0.59% Cu, 0.18g/t Au) from 82 m
    • DKP054 recorded 124 m grading 0.46% CuEq (0.40% Cu, 0.07g/t Au) from 42 m depth, including
      • 26 m grading 0.71% CuEq (0.63% Cu, 0.10g/t Au) from 58 m
    • DKP058 recorded 108 m grading 0.54% CuEq (0.45% Cu, 0.11 g/t Au) from 24 m depth, including
      • 32 m grading 0.60% CuEq (0.52% Cu, 0.12 g/t Au) from 24 m
    • DKD049 recorded 213 m grading 0.44% CuEq (0.38% Cu, 0.07g/t Au) from 504 m depth, including
      • 57.3 m grading 0.60% CuEq (0.51% Cu, 0.10 g/t Au) from 535.8 m
    • DKP028D recorded 258.9 m grading 0.42% CuEq (0.33% Cu, 0.09 g/t Au) from 358 m, including
      • 27.4 m grading 0.76% CuEq (0.63% Cu, 0.16 g/t Au) from 499.5 m
  • Assays pending for 21 drillholes (three DD, three DD tails and 15 RC) and second accredited laboratory now operating at full capacity - significantly improving Hot Chili's assay turnaround times

Hot Chili Secures US$15 Million Via Amendment Agreement with OR Royalties

  • La Verde, a pre-resource asset, is now added to OR's royalty footprint for US$15 million in funding
  • OR royalty "look-through" value has doubled, given its equivalence to a 1.12% CuEq1 NSR royalty across payable metals for a total consideration of US$30 million (following additional US$15 million amendment agreement), and Hot Chili's current market capitalisation of approximately US$230 million
  • Change of Control Royalty Buyback terms aligned with ongoing strategic partnering process

 __________________________________



 
          1 CuEq considers assumed commodity prices and average metallurgical recoveries from test work. See qualifying statements below.



 
          2 US$15 million (approximately A$21.4 million)

Strong Cash Position of Approx. A$46 Million Following Closure of OR Deal

Cautionary Statement - JORC Code (2012)

The Costa Fuego Copper-Gold Project is currently at the Pre-Feasibility Study ("PFS") stage. The production targets and forecast financial information contained in this report are based on technical and economic assessments that are preliminary in nature. While the PFS incorporates Indicated and Inferred Mineral Resources, there is a lower level of geological confidence associated with Inferred Mineral Resources, and no certainty that further exploration or development will result in the conversion of Inferred Mineral Resources to Indicated or Measured categories.

The PFS is not a definitive study and is based on a number of assumptions, including commodity prices, capital and operating costs, metallurgical recoveries, permitting, and other factors, which are subject to change. The outcomes of the PFS should not be used as the basis for a final investment decision. Further work, including additional drilling, metallurgical testing, and detailed engineering, is required before the Company can make a decision to proceed to development.

Of the Mineral Resources scheduled for extraction in the PFS production plan, more than 99% are classified as Indicated, with the remaining <1% as Inferred. The Company has concluded that it has reasonable grounds for disclosing a production target which includes a small amount of Inferred Mineral Resources, as permitted under the JORC Code. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The viability of the development scenario envisaged in the PFS does not depend on the inclusion of Inferred Mineral Resources. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resource with continued drilling.

The Mineral Resources underpinning the production target in the PFS have been prepared by a Competent Person in accordance with the requirements of the JORC 2012. For full details on the Mineral Resource estimate, please refer to the ASX announcement of 27 March 2025.

To achieve the outcomes indicated in the PFS, including reaching Definitive Feasibility Study ("DFS"), mine construction and production stages, funding in the order of US$1.27 Billion will be required, including pre-production and working capital and assumed financing charges. Investors should note that there is no certainty that Hot Chili will be able to raise that amount of funding when needed. One of the key assumptions is that the funding for the Project will be available when required and on acceptable terms. It is also possible that such funding may only be available on terms that may be dilutive to, or otherwise affect the value of, Hot Chili's existing shares. It is also possible that Hot Chili could pursue other value realisation strategies such as debt financing, a sale or partial sale of its interest in the Costa Fuego Copper Project and/or Huasco Water, sale of further royalties and/or streaming rights, sale of non-committed offtake rights, and sale of non-core assets.

The Company cautions that there is no certainty that the results or estimates contained in the PFS will be realised.

This Report contains forward-looking statements. Hot Chili has concluded that it has a reasonable basis for providing these forward-looking statements and believes it has a reasonable basis to expect it will be able to fund development of the Costa Fuego Copper Project. However, a number of factors could cause actual results or expectations to differ materially from the results expressed or implied in the forward-looking statements. Given the uncertainties involved, investors should not make any investment decisions based solely of the results of the PFS.

SUMMARY OF OPERATIONAL ACTIVITIES

Higher-Grade Starter Pit Firming as a Standout Feature of La Verde

The Company's ongoing focus on shallow infill and step-out drilling across the up-dip extension of La Verde's high-grade core, continued to deliver more outstanding results from Reverse Circulation (RC) drill holes DKP053, DKP054, DKP056, and DKP058 (Figure 1 and Figure 2) during the quarter.

Numerous drilling intersections returned across the up-dip portion of La Verde's high-grade core, all contain broad zones of higher-grade (+0.7% CuEq) mineralisation from shallow depths. Importantly, assay results are pending for nearby up-dip drillhole DKP052 (Figure 3), results expected soon (see announcement dated 5 May 2026).

These ongoing shallow RC drill results further expand the footprint of near-surface, higher-grade mineralisation and continue to strengthen the scale and continuity of a significant, near-surface, enrichment zone - capable of delivering a higher-grade starter pit opportunity for Costa Fuego (Figure 4).

Expansion Drilling Delivering Continued Success

Diamond (DD) drilling assay results for step-out holes DKD044, DKD049 and DKP028D also confirmed additional bulk tonnage extensions and delivered further expansion of La Verde's high-grade core (Figures 2 and 3) during the quarter.

Assay results from DKD044 returned a significant intersection of 391 m grading 0.51% CuEq (0.42% Cu, 0.11g/t Au) from surface, (Figure 1), including several higher-grade intervals, confirming broad and continuous high-grade copper-gold mineralisation on the western side of the high-grade core

DD hole DKD049 was designed as a 175 m step-out from DKD039 - which recorded the highest-grade and widest drilling intersection to date at La Verde (725 m grading 0.42% CuEq (0.36% Cu, 0.07 g/t Au from 18m depth). Results from DKD049 confirm a significant expansion of La Verde's eastern flank at depth.

DKP028D successfully extended a previous RC drillhole (which ended in mineralisation), recording a further 200m down-hole of mineralisation across La Verde's western flank.

Advancing Toward Maiden Mineral Resource and Pre-Feasibility Study (PFS) Integration

Hydrogeological, geotechnical, metallurgical, mine engineering and environmental workstreams are all advancing well toward full integration of La Verde into the Company's Costa Fuego production hub. Additional mineralogical analysis activities were also carried out during the quarter, including Terraspec data collection and drill core scanning using LithologyIQ's hyperspectral instrument.

A maiden Mineral Resource Estimate (MRE) for La Verde is expected to be released later this year followed by a revised PFS for Costa Fuego and then finally culminating in the formal submission of an Environmental Impact Assessment for Costa Fuego in Q2CY 2027.

The Company expects that La Verde's rapid integration will be transformative for Costa Fuego's financial metrics and global standing, already ranked amongst the world's top five by-scale1, independent copper developments, not controlled by a major mining company.


 ___________________________________



 1                                   See Slide 20, Corporate Presentation Rule Symposium -
                                       July 2026

Additional ISO Accredited Assay Laboratory Engaged

During the quarter, delivery of assay results increased to over 10 weeks in some cases. Hot Chili took proactive measures and engaged the services of an additional ISO accredited laboratory in the region, to ensure reporting of outstanding assay results is fast tracked, and assay turnaround times are accelerated. Improved turnaround times have been noted from both laboratories since the addition of a second laboratory.

Project Development Advances

Hot Chili has established a dedicated project development team, led by experienced project director Mr David Bayona, to advance the Costa Fuego Project through its critical development phase. Under a single governance framework, the team is overseeing delivery of the Environmental Impact Assessment (EIA) and the revised Pre-Feasibility Study (PFS) programs, coordinating engineering, permitting, social performance, infrastructure, technical studies, project controls, key service providers, and third-party stakeholders.

This organisational transition marks an important step in Hot Chili's evolution from an exploration-focused company to a project development and delivery organisation, strengthening readiness for permitting, financing, detailed engineering and project execution. The integrated structure improves decision-making, maintains alignment across workstreams and enhances schedule discipline, positioning Costa Fuego for successful execution.

Environmental Impact Assessment (EIA) On-Track

The Costa Fuego Environmental Impact Assessment (EIA) continues to advance, supported by a comprehensive schedule that enables weekly and monthly monitoring of progress, critical path activities, and milestones across all environmental workstreams.

A key strategic decision adopted during the quarter was the separation of the environmental permitting process into two independent EIAs:

  • EIA 1A - Huasco Water seawater intake, pumping and distribution system
  • EIA 1B - Costa Fuego Development Project.

This approach provides greater clarity for regulators, establishes independent areas of influence for environmental assessment, reduces duplication of baseline and impact evaluation work, and aligns the seawater supply system with the development of the mining project.

Key workstreams advanced during the quarter included environmental baseline studies, community and stakeholder engagement, indigenous engagement program, and preparation of the formal EIA documentation.

Revised Pre-Feasibility (PFS2)

In May 2026, Hot Chili commenced workstreams toward delivery of a significant revision of its 2025 Pre-Feasibility Study (PFS), aiming to incorporate the La Verde Cu-Au discovery into the Costa Fuego development strategy. The study remains on track and is being progressed in parallel with the Environmental Impact Assessment (EIA 1B) program under a common project governance framework.

The revised study is assessing development options to improve project economics, reduce execution risk and simplify project delivery. Key areas of assessment include the integration of La Verde and the potential development of a large open-pit mining scenario at Cortadera as an alternative to the previously defined open-pit and underground block cave operation for the later years of Costa Fuego's mine plan.

Results from the study will support selection of the preferred development pathway for Costa Fuego and provide greater clarity on project scope, mining strategy, infrastructure requirements and project economics.

Huasco Water - Update on Second Maritime Licence Application

A second maritime license application (desalination license) continues to advance through regulatory approval processes. Owing to a change of government in Chile earlier this year, the application has been delayed. Hot Chili has been assured by regulatory authorities that the application remains in progress, in-line with Huasco Water's priority status with the Chilean Ministry of Finance for streamlined approval processing.

The Company expects to receive an update in relation to this application in the coming months.

Social Integration and Community Support

Hot Chili continued its Huasco Valley community support programs during the quarter. A community perception study completed in June 2026, recorded a 93% "High Positive Awareness" score, with respondents recognising the Company's positive community relationships, and potential to develop a modern and responsible mining operation with the potential to revitalise employment social benefit for the Huasco Valley region.

During recent severe weather events in July, that prompted a government-declared state of emergency, Hot Chili worked pro-actively with local communities to prepare - providing water, fuel, food and coal to neighbouring residents of Costa Fuego. Following this once-in-fifty-year rain event, the team resumed visits to reconnect with communities, providing supplies and learning first-hand what was needed for recovery.

 1 See Page 25 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has
  been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


 (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au
  price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and
  Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation
  style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu (%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).

 (1) See Page 25 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There
  has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


 (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au
  price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and
  Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation
  style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).

 (1) See Page 25 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There
  has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


 2 Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au
  price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and
  Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation
  style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).

 (1) See Page 25 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There
  has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


 (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au
  price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and
  Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation
  style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).

Table 1. Drill Holes Completed for La Verde in Quarter 2 2026

          Prospect          Hole ID     East     North    RL    Depth     Dip                         Azi.                              Results


          La       MWDKP001          324,064  6,786,124  1,106        54      -90                                  0         No significant result
           Verde                                                                                                        returned


                   MWDKP002          325,511  6,785,654  1,171        90      -90                                  0         No significant result
                                                                                                                        returned


 MWDKP003                   323,167 6,787,100      1,042     60       -90        0        No significant result
                                                                                     returned


 MWDKP006                   324,410 6,786,674      1,102     48       -90        0        No significant result
                                                                                     returned


 MWDKP005                   322,883 6,785,505      1,075     60       -90        0        No significant result
                                                                                     returned


 MWDKP004                   324,566 6,785,505      1,170     72       -90        0        No significant result
                                                                                     returned


 DKP051                     324,326 6,785,713      1,170    372       -65       55 
      Results Pending


 DKP052                     324,756 6,786,024      1,188    354       -60      245 
      Results Pending


 DKP053                     324,570 6,785,969      1,174    408       -65       75        Significant result returned
                                                                                     Q3 2025


 DKP054                     324,756 6,786,024      1,188    216       -63       60        Significant result returned
                                                                                     Q3 2025


 DKP055                     324,499 6,786,032      1,165     42       -58       60 
      Results Pending


 DKP056                     324,756 6,786,024      1,188    402       -62      118        Significant result returned
                                                                                     Q3 2025


                   DKP057            324,674  6,786,108  1,182       330      -62                                300  
      Results Pending


                   DKP058            324,785  6,785,775  1,134       402      -58                                 70         Significant result returned
                                                                                                                        Q3 2025


                   DKP059            324,868  6,785,715  1,140       120      -60                                 65  
      Results Pending


                   DKP062            324,761  6,785,616  1,136       300      -58                                 80  
      Results Pending


                   DKP061            324,900  6,785,600  1,147       300      -60                                270  
      Results Pending


                   DKP063            324,564  6,785,708  1,134       417      -70                                 65  
      Results Pending


                   DKP064            324,508  6,785,669  1,157       324      -58                                100  
      Results Pending


                   DKP065            324,194  6,785,745  1,152       291      -60                                 75  
      Results Pending


                   DKP066            324,564  6,785,708  1,134       342      -60                                255  
      Results Pending


                   DKP067            324,785  6,785,775  1,134       300      -60                                114  
      Results Pending


                   DKP045D           324,410  6,785,944  1,110     840.5      -60                                 60  
      Results Pending


                   DKD037            324,524  6,785,836  1,122     777.1      -62                                 70  
      Results Pending


                   DKP028D           324,763  6,785,620  1,136     866.1      -60                                300         Significant result returned
                                                                                                                        Q3 2025


                   DKD060            324,908  6,785,762  1,139     772.7      -60                                260  
      Results Pending


                   DKP048D           324,740  6,785,847  1,151     457.9      -65                                 80  
      Results Pending


                   DKD049            324,600  6,785,852  1,126     779.9      -60                                260         Significant result returned
                                                                                                                        Q4 2025

Table 2. Significant Drilling Intersections from La Verde in Quarter 2 2026

         Hole ID         Coordinates        Azim        Dip                Hole                            Intersection              Interval               Copper
                                                                               Depth                                                                               Eq(1)         Copper          Gold           Silver           Molyb.


          North     East       RL    From        To         (m)                 (%                (% Cu)                (g/t                (ppm                  (ppm
                                                                               CuEq)                                      Au)                 Ag)                   Mo)


 DKD040          6785907    324632     1139          60         -59                   381                   4.4                 91.0                   86.6                 0.45            0.34           0.15             2.11             7


                                                                    incl                             12.0                 28.7                   16.7                  0.60            0.45           0.20             0.78               3


                                                                    & incl                           53.7                 78.4                   24.7                  0.55            0.41           0.19             1.07               6


                                                                                                    185.2                349.1                  163.9                  0.43            0.34           0.11             0.85              17


                                                                    incl                            206.0                226.0                   20.0                  0.60            0.43           0.23             0.96              12


                                                                    & incl                          285.0                322.0                   37.0                  0.50            0.42           0.09             0.80              15


 DKP041          6785786    324561     1124          55         -70                   380                  92.0                316.0                  224.0                 0.40            0.31           0.10             0.64            24


                                                                    Incl                            112.0                136.0                   24.0                  0.60            0.49           0.15             0.65              14


                                                                    & Incl                          216.0                262.0                   46.0                  0.50            0.38           0.14             0.64              44


 DKD042          6785902    324635     1140         300         -70                 258.1                  11.6                108.0                   96.4                 0.40            0.31           0.12             0.79             9


                                                                    Incl                             13.6                 25.5                   11.9                  0.51            0.41           0.13             0.59               8


                                                                    & Incl                           56.4                 72.8                   16.5                  0.45            0.34           0.15             0.51               9


                                                                    & Incl                           84.2                106.6                   22.4                  0.62            0.46           0.21             2.00              13


 DKD044          6785738    324508     1131          70         -65                 711.4                   0.0                391.3                  391.3                 0.50            0.42           0.11             0.85            18


                                                                    Incl                              0.0                 17.8                   17.8                  0.68            0.63           0.06             0.70              10


                                                                    & Incl                          103.3                144.0                   40.7                  0.60            0.50           0.12             0.86              20


                                                                    & Incl                          160.0                245.4                   85.4                  0.61            0.50           0.15             1.11              12


                                                                    & Incl                          276.1                295.8                   19.7                  0.70            0.57           0.15             1.06              33


                                                                    & Incl                          499.0                520.4                   21.3                  0.45            0.34           0.05             0.87             154


                                                                    & Incl                          595.0                620.8                   26.0                  0.46            0.39           0.08             0.68              25


 DKP028D         6785617    324758     1136         300         -60                 866.1                 358.0                616.9                  258.9                 0.42            0.33           0.09             0.62            58


                                                                    Incl                            380.0                447.6                   67.6                  0.52            0.38           0.13             0.67              85


                                                                    & Incl                          499.5                526.9                   27.4                  0.76            0.63           0.16             1.00              29


                                                                    & Incl                          570.8                591.3                   20.5                  0.50            0.40           0.07             0.99              99


                                                                    & Incl                          628.0                  674                     46                  0.31            0.20           0.03             0.50             203


 DKP043          6785855    324610     1131         104         -56                   342                   8.0                214.0                  206.0                 0.31            0.24           0.08             0.57            37


                                                                    Incl                             46.0                 58.0                   12.0                  0.42            0.32           0.14             0.35               6


                                                                    & Incl                          198.0                214.0                   16.0                  0.46            0.34           0.12             0.99              80


 DKP046          6786025    324597     1153         231         -59                   184                  28.0                112.0                  84.00                 0.40            0.32           0.10             0.50            12


                                                                    Incl                               54                   72                   18.0                  0.50            0.41           0.12             0.29               7


 DKP047          6785888    324396     1093          70         -65                    60 
 No Significant Intersection


 DKD049          6785858    324601     1131          80         -62                 779.9                  78.3                104.4                   26.1                 0.53            0.40           0.17             1.03            22


                                                                                                    503.6                716.6                  213.0                  0.44            0.38           0.07             0.72              18


                                                                    Incl                            535.8                593.1                   57.3                  0.60            0.51           0.10             1.11              28


                                                                    & Incl                          624.0                639.8                   15.8                  0.52            0.45           0.08             0.65              14


 DKP050          6785739    324625     1127          75         -60                   354                   6.0                114.0                  108.0                 0.37            0.31           0.08             0.31            10


                                                                    Incl                              8.0                 48.0                   40.0                  0.47            0.40           0.10             0.45               6


                                                                                                    138.0                240.0                  102.0                  0.35            0.28           0.09             0.34              19


 DKP053          6785969    324570     1174          75         -65                   408                   0.0                 32.0                   32.0                 0.38            0.34           0.04             0.49            20


                                                                                                     64.0                314.0                  250.0                  0.50            0.39           0.14             0.62              10


                                                                    Incl                             66.0                166.0                  100.0                  0.58            0.47           0.15             0.65              14


                                                                    Or
                                                                     Incl                            82.0                118.0                   36.0                  0.72            0.59           0.18             0.44              13


                                                                    & Incl                          248.0                276.0                   28.0                  0.62            0.46           0.21             0.84               7


 DKP054          6786024    324756     1188          60         -63                   216                  42.0                166.0                  124.0                 0.46            0.40           0.07             0.36            18


                                                                    Incl                             58.0                 84.0                   26.0                  0.71            0.63           0.10             0.23               9


 DKP055          6786037    324505     1165          60         -58                    42                   0.0                 32.0                   32.0                 0.34            0.30           0.03             0.43            26


 DKP056          6786024    324756     1188         118         -62                   402                  56.0                146.0                   90.0                 0.45            0.36           0.12             0.65            13


                                                                    Incl                             64.0                 94.0                   30.0                  0.62            0.50           0.17             0.43               6


                                                                    Or
                                                                     Incl                            64.0                 80.0                   16.0                  0.70            0.58           0.18             0.28               7


 DKP057          6786108    324674     1182         300         -62                   330                  56.0                106.0                   50.0                 0.41            0.35           0.08             0.77            10


 DKP058          6785775    324785     1134          70         -58                   402                  24.0                132.0                  108.0                 0.54            0.45           0.11             0.68            12


                                                                    Incl                             24.0                 56.0                   32.0                  0.60            0.51           0.10             0.63               6

 Notes to Table 1: Significant intercepts for La Verde are reported above a nominal cut-off grade of 0.20% Cu. Reported intersections may include internal dilution (intervals below 0.20% Cu), including zones exceeding 30 m
  downhole width, where the overall weighted average grade of the intersection remains above the cut-off grade. Significant intersections are separated where zones of internal dilution result in discrete intervals that do not
  meet the reporting criteria. The selection of a 0.20% Cu cut-off grade is aligned with a marginal economic cut-off for bulk tonnage polymetallic copper deposits of comparable grade in Chile and globally. Significant
  intersection widths (interval) have been rounded to the nearest metre.


  1 Copper Equivalent (CuEq) reported for the drill hole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au
   price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and
   Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation
   style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).

SUMMARY OF CORPORATE ACTIVITIES

Strategic Partnering Process Update

Hot Chili continues to advance its asset-level strategic Partnering Process, aimed at introducing one or more qualified partners with the financial, technical and operational capability to assist in funding and delivery of the projects.

During the quarter, the Company continued to engage with a range of prospective strategic partners with several new non-binding, indicative, incomplete and conditional proposals received following further in-bound interest in Hot Chili's Partnering Process.

The Company's management continued to facilitate ongoing due diligence activities, including site visits, while discussions continued in relation to existing non-binding, indicative, incomplete and conditional proposals received for potential transactions involving the projects.

The Partnering Process may result in a range of transactions for the Projects. Investors are cautioned that there is no certainty the Partnering Process will result in a transaction or binding agreement.

BMO Capital Markets continues to act as financial adviser in connection with the Partnering Process.

The Company will continue to update the market in accordance with its continuous disclosure obligations.

OR Royalty Amendment Agreement

Hot Chili has executed a binding Amended and Restated Investment Agreement (the "A&R Investment Agreement") with OR Royalties Inc. ("OR") under which OR will acquire a Net Smelter Return (NSR) royalty over the La Verde Project, part of the broader Costa Fuego copper-gold development in Chile, for a cash payment of US$15 million. The agreement expands the existing 2023 royalty arrangement between the parties and reinforces OR's support for the advancement of Costa Fuego.

The A&R Investment Agreement brings total royalty consideration under the OR royalty arrangement to US$30 million (see the Company's press releases dated 28 June 2023, and 26 July 2023) with Hot Chili to receive US$15 million ("Royalty Consideration") at closing of the transaction.

Hot Chili expects to receive the additional US$15 million (approximately A$21.4 million) upon completion of the agreement in coming days. Importantly, an updated change of control buy-back right was negotiated to ensure strategic flexibility to accommodate and not negatively impact the Company's ongoing Strategic Partnering Process.

Highlights include:

  • US$15 million in additional non-dilutive funding brings total OR royalty consideration to US$30 million, with proceeds directed toward La Verde and broader Costa Fuego advancement.
  • La Verde added to OR's royalty footprint, a pre-resource asset, representing a significant endorsement by one of North America's most technically rigorous royalty companies.
  • Doubling of "look-through" value given the OR royalty is equivalent to a 1.12% CuEq1 NSR royalty across payable metals for a total consideration of US$30 million, and Hot Chili's current market capitalisation of approximately US$280 million.
  • Updated Change of Control Buyback prior to the fourth anniversary of the original royalty closing. The OR NSR can be reduced to 0.5% NSR royalty on copper and 2.5% NSR royalty on gold.

Combined with Hot Chili's A$40 million equity raising completed in February 2026, the expected receipt of US$15 million (approximately A$21.4 million) further strengthens the Company's funding position as it advances Costa Fuego toward development. See announcement dated 7th July 2026 for full details of material terms to the OR A&R Investment Agreement.


 _________________________________



 
            1                    CuEq considers assumed commodity prices and average metallurgical recoveries from test work.
                                     See qualifying statements below.

Cash Position

As of 30 June 2026, the Company had cash of A$25 million and no debt.

The operating expenditure for quarter ended 30 June 2026 included payments for staff costs of A$0.8 million and administration and corporate costs of A$1.6 million.

The investing expenditure for quarter ended 30 June 2026 included payments for tenements of A$0.2 million, and payments for exploration and evaluation of A$7.3 million relating to drilling (three drill rigs in operation) and development study activities across the La Verde copper-gold porphyry discovery, value engineering workstreams and EIA submission activities.

Capital Structure

The following summarises the Company's securities on issue:

  • 202,863,198 ordinary fully paid shares
  • 1,212,121 options at AUD $2.145 expiring 12 August 2028
  • 452,802 service rights
  • 4,735,415 performance rights

Additional ASX Disclosure Information

ASX Listing Rule 5.3.2: There was no substantive mining production and development activities during the quarter.

ASX Listing Rule 5.3.3 - Schedule of Mineral Tenements as of 30 June 2026.

The schedule of Mineral Tenements and changes in interests is appended at the end of this activities report.

ASX Listing Rule 5.3.4: Reporting under a use of funds statement in a Prospectus does not apply to the Company currently.

ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the quarter per Section 6.1 of the Appendix 5B totalled $234,000. This is comprised of directors' salaries and superannuation of $234,000.

Health, Safety, Environment and Quality

Field operations during the quarter included geological reconnaissance activities, diamond and reverse circulation drilling, sampling exercises baselines and site investigations for EIA and PFS2, across the Company's Costa Fuego project landholdings, focused on La Verde and Productora. Activities on new tenements are run at the Productora or Cortadera operations centers and their safety statistics are included under the figures for all projects.

Two Lost Time Injuries (LTIs) were recorded during the quarter. The first involved entrapment of the little finger on a worker's left hand during drilling activities, resulting in a finger fracture. The second involved a same level fall, resulting in a contusion to a worker's left hand.

Hot Chili's sustainability framework ensures an emphasis on business processes that target long-term economic, environmental and social value. The Company is dedicated to continual monitoring and improvement of health, safety and the environmental systems. There is no greater importance than ensuring the safety of our people and their families.

Table 3. HSEQ Quarter 2 2026 Performance and Statistics


 
            Deposit                      Domeyko                    Productora                      All Projects



 
            Timeframe            Q2 2026         Cum.(2)  Q2 2026              Cum.(2)    Q2 2026                Cum.(2)
                                                      2024                           2024                               2024



 LTI events                              1                1         1                     1           2                       4



 NLTI events                             3                1         1                     1           4                       5



 Days lost                              13               17         4                     4          17                     128



 LTIFR index                            30               19       171                    19          49                      21



 ISR index                             388              158       684                    75         421                     665



 IFR Index                             120               46         0                    37           0                      47



 Thousands of man-hours               33.5              108       5.8                    53        40.4                     192



 Incidents on materials and assets       2                2         0                     0           2                       2



 Environmental incidents                 0                0         0                     0           0                       0



 Headcount(1)                           82               29        14                    19          98                      62

 Notes: HSEQ is the acronym for Health, Safety, Environment and Quality. LTIFR per million-manhours. Safety performance is reported on a monthly basis to the National Mine Safety Authority on a standard E-100 form; (1)
  Average monthly headcount (2) Cumulative statistics since April, 2024.

Tenement Changes During the Quarter

During the Quarter, the following mining exploration concessions have expired upon reaching their expiration date: "Solar 2", "Solar 4", "Solar 6", "Solar 8", "Solar 10", "Soledad 1" and "Soledad 3".

Furthermore, Sociedad Minera La Frontera SpA ("La Frontera") has claimed 1 mining exploitation concession called "WH 1 1/20", which is in process to be constituted. During the same period, La Frontera acquired from Antofagasta Minerals S.A., pursuant to purchase and sale agreements, the following mining exploitation concessions: "Arboleda 7 1/25" and "Navarro 1 41/60".

In addition, the following mining exploitation concessions, which are currently in the process of being granted, have been incorporated into the Domeyko Project: "Porfiada Sur 1 1/60", "Porfiada Sur 2 1/60", "Porfiada Sur 3 1/40", and "Porfiada Sur 4 1/60".

Finally, Sociedad Minera El Aguila SpA ("El Aguila") has claimed 1 mining exploitation concession called "HWZC 1 1/20", which is in process to be constituted.

Figure 6 below outlines the HCH tenement holdings, including any significant changes between quarters.

The Company's existing tenements are detailed in the tables below.

Table 4. Current Tenement Holdings in Chile as of 30th June 2026

Cortadera Project Tenements

                                      
 
       Cortadera Project


      N°                    License ID              HCH % Held    HCH % Earning Area (ha) Agreement
                                                                                           Details


 
 1            
          ALCENIA 1/10     100% SMEA SpA                              50


 
 2                   AMALIA 942 A 1/6   100% Frontera SpA                            53


 
 3          
          ATACAMITA 1/82   100% Frontera SpA                            82


 
 4                   CORROTEO 1 1/260   100% Frontera SpA                           260


 
 5                   CORROTEO 5 1/261   100% Frontera SpA                           261


 
 6                  CORTADERA 1 1/200   100% Frontera SpA                           200


 
 7          
          CORTADERA 1/40   100% Frontera SpA                           374


 
 8                  CORTADERA 2 1/200   100% Frontera SpA                           200


 
 9      
          CORTADERA 41         100% Frontera SpA                             1


 
 10     
          CORTADERA 42         100% Frontera SpA                             1


 
 11         
          LAS CANAS 1/15   100% Frontera SpA                           146


 
 12     
          LAS CANAS 16         100% Frontera SpA                             1


 
 13          LAS CANAS ESTE 2003 1/30   100% Frontera SpA                           300


 
 14                  MAGDALENITA 1/20   100% Frontera SpA                           100


 
 15                 PAULINA 10 B 1/16   100% Frontera SpA                           136


 
 16                 PAULINA 11 B 1/30   100% Frontera SpA                           249


 
 17                 PAULINA 12 B 1/30   100% Frontera SpA                           294


 
 18                 PAULINA 13 B 1/30   100% Frontera SpA                           264


 
 19                 PAULINA 14 B 1/30   100% Frontera SpA                           265


 
 20                 PAULINA 15 B 1/30   100% Frontera SpA                           200


 
 21                 PAULINA 22 A 1/30   100% Frontera SpA                           300


 
 22                   PAULINA 24 1/24   100% Frontera SpA                           183


 
 23                 PAULINA 25 A 1/19   100% Frontera SpA                           156


 
 24                 PAULINA 26 A 1/30   100% Frontera SpA                           294


 
 25                  PAULINA 27A 1/30   100% Frontera SpA                           300


 
 26          PURISIMA 1/8 (1/2 Y 5/6)   100% Frontera SpA                            20   NSR 1.5%


 
 27         
          CF 1             100% Frontera SpA                           300


 
 28         
          CF 2             100% Frontera SpA                           300


 
 29         
          CF 3             100% Frontera SpA                           300


 
 30         
          CF 4             100% Frontera SpA                           300


 
 31         
          CF 5             100% Frontera SpA                           200


 
 32         
          CF 6             100% Frontera SpA                           200


 
 33         
          CF 7             100% Frontera SpA                           100


 
 34         
          CF 8             100% Frontera SpA                           200


 
 35         
          CF 9             100% Frontera SpA                           100


 
 36         
          CF 10            100% Frontera SpA                           200


 
 37         
          CF 11            100% Frontera SpA                           200


 
 38             CHAPULIN COLORADO 1/3   100% Frontera SpA                             3


 
 39       
          CHILIS 1           100% Frontera SpA                           200


 
 40       
          CHILIS 3           100% Frontera SpA                           100


 
 41       
          CHILIS 4           100% Frontera SpA                           200


 
 42       
          CHILIS 5           100% Frontera SpA                           200


 
 43       
          CHILIS 6           100% Frontera SpA                           200


 
 44       
          CHILIS 7           100% Frontera SpA                           200


 
 45       
          CHILIS 8           100% Frontera SpA                           200


 
 46       
          CHILIS 9           100% Frontera SpA                           300


 
 47         
          CHILIS 10 1/38   100% Frontera SpA                           190


 
 48       
          CHILIS 11          100% Frontera SpA                           200


 
 49         
          CHILIS 12 1/60   100% Frontera SpA                           300


 
 50       
          CHILIS 13          100% Frontera SpA                           300


 
 51       
          CHILIS 14          100% Frontera SpA                           300


 
 52       
          CHILIS 15          100% Frontera SpA                           300


 
 53       
          CHILIS 16          100% Frontera SpA                           300


 
 54       
          CHILIS 17          100% Frontera SpA                           300


 
 55       
          CHILIS 18          100% Frontera SpA                           300


 
 56      
          CORTADERA 1         100% Frontera SpA                           200


 
 57      
          CORTADERA 2         100% Frontera SpA                           200


 
 58      
          CORTADERA 3         100% Frontera SpA                           200


 
 59      
          CORTADERA 4         100% Frontera SpA                           200


 
 60      
          CORTADERA 5         100% Frontera SpA                           200


 
 61                  CORTADERA 6 1/60   100% Frontera SpA                           265


 
 62                  CORTADERA 7 1/20   100% Frontera SpA                            93


 
 63          
          CRISTINA 1/40     100% SMEA SpA                              40


 
 64           
          DIABLITO 1/5     100% SMEA SpA                              25


 
 65                  DONA FELIPA 1/10   100% Frontera SpA                            50


 
 66        
          DORO 1            100% Frontera SpA                           200


 
 67        
          DORO 2            100% Frontera SpA                           200


 
 68        
          DORO 3            100% Frontera SpA                           300


 
 69                FALLA MAIPO 2 1/10   100% Frontera SpA                            99


 
 70                 FALLA MAIPO 3 1/8   100% Frontera SpA                            72


 
 71                FALLA MAIPO 4 1/26   100% Frontera SpA                            26


 
 72       
          MINORI 1             100% SMEA SpA                             300


 
 73       
          MINORI 2             100% SMEA SpA                             300


 
 74       
          MINORI 3             100% SMEA SpA                             300


 
 75       
          MINORI 4             100% SMEA SpA                             300


 
 76      
          PORFIADA B          100% Frontera SpA                           200


 
 77      
          PORFIADA D          100% Frontera SpA                           300


 
 78      
          PORFIADA G          100% Frontera SpA                           200


 
 79      
          PORFIADA I          100% Frontera SpA                           300


 
 80      
          PORFIADA II         100% Frontera SpA                           300


 
 81     
          PORFIADA III         100% Frontera SpA                           300


 
 82      
          PORFIADA IV         100% Frontera SpA                           300


 
 83      
          PORFIADA V          100% Frontera SpA                           200


 
 84      
          PORFIADA VI         100% Frontera SpA                           100


 
 85      
          PORFIADA X          100% Frontera SpA                           200


 
 86    
          SAN ANTONIO 1         100% Frontera SpA                           200


 
 87    
          SAN ANTONIO 2         100% Frontera SpA                           200


 
 88    
          SAN ANTONIO 3         100% Frontera SpA                           300


 
 89    
          SAN ANTONIO 4         100% Frontera SpA                           300


 
 90    
          SAN ANTONIO 5         100% Frontera SpA                           300


 
 91            
          MARINA 1/10   100% Frontera SpA                           100


 
 92           
          CATITA V 1/9   100% Frontera SpA                             9


 
 93       
          CHILIS 19          100% Frontera SpA                           300


 
 94        
          PAULINA           100% Frontera SpA                           100


 
 95                   ARBOLEDA 7 1/25   100% Frontera SpA                           234


 
 96                   NAVARRO 1 41/60   100% Frontera SpA                            81


 
 97              
          WH 1 1/20   100% Frontera SpA                           100


                               TOTAL                                               19.377      23162


 Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited

Productora Project Tenements

                        
     
   Productora Project


        N°         License ID             HCH % Held  HCH %  Area
                                                     Earning   (ha)                  Agreement Details


  
  1          ALGA 7 A 1/32      80% SMEA SpA                  89


  
  2       ALGA VI 4            100% SMEA SpA                   2


  
  3           ALGA VI 5/24      80% SMEA SpA                  66


  
  4            ARENA 1 1/6      80% SMEA SpA                  40


  
  5           ARENA 2 1/17      80% SMEA SpA                 113


  
  6         AURO HUASCO 1A
                          1/8      80% SMEA SpA                  35


  
  7               CABRITO-
                  CABRITO 1/9      80% SMEA SpA                  50


  
  8          CACHIYUYITO 1
                         1/20      80% SMEA SpA                 100


  
  9          CACHIYUYITO 2
                         1/60      80% SMEA SpA                 300


  
  10         CACHIYUYITO 3
                         1/60      80% SMEA SpA                 300


  
  11        CARMEN I, 1/50      80% SMEA SpA                 222


  
  12       CARMEN II, 1/60      80% SMEA SpA                 274


  
  13        CF 12            100% Frontera SpA               100


  
  14        CF 13            100% Frontera SpA               200


  
  15        CF 14            100% Frontera SpA               300


  
  16        CHICA               80% SMEA SpA                   1


  
  17           CHOAPA 1/10      80% SMEA SpA                  50


  
  18         CUENCA A 1/51      80% SMEA SpA                 255


  
  19         CUENCA B 1/28      80% SMEA SpA                 139


  
  20         CUENCA C 1/51      80% SMEA SpA                 255


  
  21       CUENCA D             80% SMEA SpA                   3


  
  22       CUENCA E             80% SMEA SpA                   1


  
  23         ELEONOR RIGBY
                         1/10   100% Frontera SpA               100


  
  24            ELQUI 1/14      80% SMEA SpA                  61


  
  25         ESPERANZA 1/5      80% SMEA SpA                  11


  
  26           FRAN 1 1/60      80% SMEA SpA                 220


  
  27          FRAN 12 1/40      80% SMEA SpA                 200


  
  28          FRAN 13 1/40      80% SMEA SpA                 200


  
  29          FRAN 14 1/40      80% SMEA SpA                 200


  
  30          FRAN 15 1/60      80% SMEA SpA                 300


  
  31         FRAN 18, 1/60      80% SMEA SpA                 273


  
  32           FRAN 2 1/20      80% SMEA SpA                 100


  
  33         FRAN 21, 1/46      80% SMEA SpA                 226


  
  34           FRAN 3 1/20      80% SMEA SpA                 100


  
  35           FRAN 4 1/20      80% SMEA SpA                 100


  
  36           FRAN 5 1/20      80% SMEA SpA                 100


  
  37           FRAN 6 1/26      80% SMEA SpA                 130


  
  38           FRAN 7 1/37      80% SMEA SpA                 176


  
  39           FRAN 8 1/30      80% SMEA SpA                 120


  
  40          JULI 10 1/60      80% SMEA SpA                 300


  
  41         JULI 11, 1/60      80% SMEA SpA                 300


  
  42         JULI 12, 1/42      80% SMEA SpA                 210


  
  43         JULI 13, 1/20      80% SMEA SpA                 100


  
  44         JULI 14, 1/50      80% SMEA SpA                 250


  
  45         JULI 15, 1/55      80% SMEA SpA                 275


  
  46          JULI 16 1/60      80% SMEA SpA                 300


  
  47          JULI 17 1/20      80% SMEA SpA                 100


  
  48       JULI 19              80% SMEA SpA                 300


  
  49       JULI 20              80% SMEA SpA                 300


  
  50          JULI 21 1/60      80% SMEA SpA                 300


  
  51       JULI 22              80% SMEA SpA                 300


  
  52          JULI 23 1/60      80% SMEA SpA                 300


  
  53          JULI 24 1/60      80% SMEA SpA                 300


  
  54       JULI 25              80% SMEA SpA                 300


  
  55       JULI 27 B, 1/10      80% SMEA SpA                  48


  
  56         JULI 27, 1/30      80% SMEA SpA                 146


  
  57         JULI 28, 1/60      80% SMEA SpA                 300


  
  58          JULI 9, 1/60      80% SMEA SpA                 300


  
  59           JULIETA 10,
                         1/60      80% SMEA SpA                 300


  
  60      JULIETA 11            80% SMEA SpA                 300


  
  61      JULIETA 12            80% SMEA SpA                 300


  
  62       JULIETA 13 1/60      80% SMEA SpA                 298


  
  63       JULIETA 14 1/60      80% SMEA SpA                 269


  
  64       JULIETA 15 1/40      80% SMEA SpA                 200


  
  65      JULIETA 16            80% SMEA SpA                 200


  
  66      JULIETA 17            80% SMEA SpA                 200


  
  67       JULIETA 18 1/40      80% SMEA SpA                 200


  
  68      JULIETA 5             80% SMEA SpA                 200


  
  69      JULIETA 6             80% SMEA SpA                 200


  
  70      JULIETA 7             80% SMEA SpA                 100


  
  71      JULIETA 8             80% SMEA SpA                 100


  
  72      JULIETA 9             80% SMEA SpA                 100


  
  73            JULITA 1/4      80% SMEA SpA                   4


  
  74          LEONA 2A 1/4      80% SMEA SpA                  10


  
  75           LIMARI 1/15      80% SMEA SpA                  66


  
  76               LOA 1/6      80% SMEA SpA                  30


  
  77            MAIPO 1/10      80% SMEA SpA                  50


  
  78           MONTOSA 1/4      80% SMEA SpA                  35                                  NSR 3%


  
  79          ORO INDIO 1A
                         1/20      80% SMEA SpA                  82


  
  80        PEGGY SUE 1/10   100% Frontera SpA               100


  
  81       PRODUCTORA 1/16      80% SMEA SpA                  75


  
  84           TOLTEN 1/14      80% SMEA SpA                  70


  
  85           URANIO 1/70                    0 %            350 25-year Lease Agreement US$250,000 per
                                                                     year (average for the 25 year term);
                                                                    plus 2% NSR all but gold; 4% NSR gold;
                                                                              5% NSR non-metallic


  
  86           ZAPA 1 1/10      80% SMEA SpA                 100


  
  87              ZAPA 1/6      80% SMEA SpA                   6                                  GSR 1%


  
  88           ZAPA 3 1/23      80% SMEA SpA                  92


  
  89          ZAPA 5A 1/16      80% SMEA SpA                  80


  
  90           ZAPA 7 1/24      80% SMEA SpA                 120


  
  91    SIERRA SOLIS 1         100% SMEA SpA                 200


  
  92    SIERRA SOLIS 2         100% SMEA SpA                 300


  
  93    SIERRA SOLIS 3         100% SMEA SpA                 300


  
  94    SIERRA SOLIS 4         100% SMEA SpA                 200


  
  95    SIERRA SOLIS 5         100% SMEA SpA                 300


  
  96    SIERRA SOLIS 6         100% SMEA SpA                 300


  
  97    SIERRA SOLIS 7         100% SMEA SpA                 300


  
  98    SIERRA SOLIS 8         100% SMEA SpA                 300


  
  99      ZAPALLO 1            100% SMEA SpA                 100


 
  100      ZAPALLO 2            100% SMEA SpA                 200


 
  101      ZAPALLO 3            100% SMEA SpA                 200


 
  102           HWZC 1 1/14     100% SMEA SpA                  98


                      TOTAL                                  17.276


 
 Note. SMEA SpA is subsidiary company - 80% owned by Hot Chili Limited, 20% owned by CMP (Compañía Minera del Pacífico)



 
 Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Domeyko Project Tenements

                         
 
       Domeyko Project


      N°        License ID             HCH % Held          HCH % Earning  Area
                                                                           (ha)                        Agreement Details


 
 1        ANTONIO 1 1/56                         100% Frontera SpA        280           100% HCH Domeyko Purchase Option
                                                                                                      Agreement
                                                                                     US$320,000 (already satisfied)
                                                                                 US$200,000  payable by April 19th 2027
                                                                                US$3.480,000  payable by April 19th 2028
                                                                                                                       NSR 1%


 
 2          ANTONIO 1/40                         100% Frontera SpA        200


 
 3       ANTONIO 10 1/21                         100% Frontera SpA         63


 
 4       ANTONIO 19 1/30                         100% Frontera SpA        128


 
 5       ANTONIO 21 1/20                         100% Frontera SpA         60


 
 6       ANTONIO 36 1/15                         100% Frontera SpA         74


 
 7        ANTONIO 5 1/40                         100% Frontera SpA        200


 
 8        ANTONIO 9 1/40                         100% Frontera SpA        193


 
 9      CAZURRO 1                                100% Frontera SpA        200


 
 10     CAZURRO 2                                100% Frontera SpA        200


 
 11     CAZURRO 3                                100% Frontera SpA        300


 
 12     CAZURRO 4                                100% Frontera SpA        300


 
 13     CAZURRO 5                                100% Frontera SpA        100


 
 14     CAZURRO 6                                100% Frontera SpA        200


 
 15     CAZURRO 7                                100% Frontera SpA        200


 
 16     CAZURRO 8                                100% Frontera SpA        200


 
 17    CERRO MOLY 1                              100% Frontera SpA        300


 
 18    CERRO MOLY 2                              100% Frontera SpA        300


 
 19    CERRO MOLY 3                              100% Frontera SpA        300


 
 20    CERRO MOLY 4                              100% Frontera SpA        300


 
 21       CAZURRO 3 1/60                         100% Frontera SpA        300


 
 22       CAZURRO 4 1/60                         100% Frontera SpA        300


 
 23       CAZURRO 7 1/40                         100% Frontera SpA        200


 
 24         EMILIO 1 1/8                         100% Frontera SpA         38


 
 25         EMILIO 3 1/9                         100% Frontera SpA         45


 
 26            INES 1/40                         100% Frontera SpA        200


 
 27           LORENA 1/2                         100% Frontera SpA          2


 
 28        MERCEDITA 1/7                         100% Frontera SpA         22


 
 29          PRIMO 1 1/6                         100% Frontera SpA         36


 
 30        SANTIAGUITO 5
                      1/24                         100% Frontera SpA        114


 
 31          DOMINOCEROS                         100% Frontera SpA         20         100% HCH Dominoceros Purchase Option
                1/20 (1/4)                                                                            Agreement
                                                                                    US$1,000,000 (already satisfied)
                                                                                   US$1,000,000 payable by October 25th
                                                                                                   2026
                                                                                  US$6,890,000  payable by October 25th
                                                                                                   2027


 
 32      CF SUR 1          100% Frontera SpA                              300


 
 33      CF SUR 2          100% Frontera SpA                              300


 
 34      CF SUR 3          100% Frontera SpA                              300


 
 35      CF SUR 4          100% Frontera SpA                              300


 
 36      CF SUR 5          100% Frontera SpA                              200


 
 37      CF SUR 6          100% Frontera SpA                              300


 
 38      CF SUR 7          100% Frontera SpA                              300


 
 39      CF SUR 8          100% Frontera SpA                              300


 
 40      CF SUR 9          100% Frontera SpA                              200


 
 41     CF SUR 10          100% Frontera SpA                              200


 
 42     CF SUR 11          100% Frontera SpA                              300


 
 43     CF SUR 12          100% Frontera SpA                              300


 
 44     CF SUR 13          100% Frontera SpA                              300


 
 45     CF SUR 14          100% Frontera SpA                              300


 
 46     CF SUR 15          100% Frontera SpA                              200


 
 47     CF SUR 16          100% Frontera SpA                              300


 
 48     CF SUR 17          100% Frontera SpA                              300


 
 49     CF SUR 18          100% Frontera SpA                              300


 
 50     CF SUR 19          100% Frontera SpA                              300


 
 51     CF SUR 20          100% Frontera SpA                              300


 
 52     CF SUR 21          100% Frontera SpA                              300


 
 53     CF SUR 22          100% Frontera SpA                              300


 
 54     CF SUR 23          100% Frontera SpA                              200


 
 55     CF SUR 24          100% Frontera SpA                              200


 
 56     CF SUR 25          100% Frontera SpA                              300


 
 57     CF SUR 26          100% Frontera SpA                              300


 
 58     CF SUR 27          100% Frontera SpA                              300


 
 59     CF SUR 28          100% Frontera SpA                              200


 
 60     CF SUR 29          100% Frontera SpA                              300


 
 61     CF SUR 30          100% Frontera SpA                              200


 
 62     CF SUR 31          100% Frontera SpA                              300


 
 63     CF SUR 32          100% Frontera SpA                              300


 
 64     CF SUR 33          100% Frontera SpA                              300


 
 65     CF SUR 34          100% Frontera SpA                              300


 
 66     CF SUR 35          100% Frontera SpA                              300


 
 67     CF SUR 36          100% Frontera SpA                              200


 
 68     CF SUR 37          100% Frontera SpA                              200


 
 69            KRETA 1/4   100% Frontera SpA                               16         The mining concession is included in
                                                                                                     SanAntonio

                                                                                  
          Purchase Option Agreement


 
 70       MARI 1           100% Frontera SpA                              300


 
 71            MARI 1/12   100% Frontera SpA                               64       The mining concession is included in San
                                                                                         Antonio Purchase Option Agreement


 
 72       MARI 6           100% Frontera SpA                              300


 
 73       MARI 8           100% Frontera SpA                              300


 
 74     PAJONALES          100% Frontera SpA                              300


 
 75       PORFIADA SUR 1
                      1/60                         100% Frontera SpA        300


 
 76       PORFIADA SUR 2
                      1/60                         100% Frontera SpA        300


 
 77       PORFIADA SUR 3
                      1/40                         100% Frontera SpA        200


 
 78       PORFIADA SUR 4
                      1/60                         100% Frontera SpA        300


                   TOTAL                                                 17.855


 
 Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

El Fuego Project Tenements

                      
          
            San Antonio Project


      N°         License ID                           HCH %              HCH % Earning Area
                                                       Held                              (ha) 
          
            Agreement Details


 
 1           MERCEDES 1/3                                       100% Frontera SpA        50    100% HCH San Antonio Purchase Option Agreement

                                                                                               
          USD 2,400,000 already paid.

                                                                                                US$2,000,000 payable by September 30th 2026 to
                                                                                                          exercise the El Fuego Option.



         (2 additional and conditional payments of USD
                                                                                                2,000,000, each one, to be paid by December 31,
                                                                                                2030 under certain conditions detailed at title
                                                                                                 "Tenement Changes During the Quarter" of this
                                                                                                               quarterly report.)


 
 2             PORFIADA A
                       1/33                                       100% Frontera SpA       160


 
 3             PORFIADA C
                       1/60                                       100% Frontera SpA       300


 
 4             PORFIADA E
                       1/20                                       100% Frontera SpA       100


 
 5             PORFIADA F
                       1/50                                       100% Frontera SpA       240


 
 6            PORFIADA IX
                       1/60                                       100% Frontera SpA       300


 
 7           PORFIADA VII
                       1/60                                       100% Frontera SpA       270


 
 8               PORFIADA
                  VIII 1/60                                       100% Frontera SpA       300


 
 9        PRIMA 1                                               100% Frontera SpA         1


 
 10       PRIMA 2                                               100% Frontera SpA         2


 
 11           ROMERO 1/31                                       100% Frontera SpA        31


 
 12           SAN ANTONIO
                        1/5                                       100% Frontera SpA        25


 
 13          SAN JUAN SUR
                        1/5                                       100% Frontera SpA        10


 
 14          SAN JUAN SUR
                       6/23                                       100% Frontera SpA        90


 
 15           SANTIAGO  Z
                       1/30                                       100% Frontera SpA       300


 
 16     SANTIAGO 1/4
              Y 20                                                100% Frontera SpA        75


 
 17              SANTIAGO
                      15/19                                       100% Frontera SpA        25


 
 18              SANTIAGO
                      21/36                                       100% Frontera SpA        76


 
 19              SANTIAGO
                      37/43                                       100% Frontera SpA        26


 
 20           SANTIAGO A,
                       1/26                                       100% Frontera SpA       244


 
 21           SANTIAGO B,
                       1/20                                       100% Frontera SpA       200


 
 22           SANTIAGO C,
                       1/30                                       100% Frontera SpA       300


 
 23           SANTIAGO D,
                       1/30                                       100% Frontera SpA       300


 
 24           SANTIAGO E,
                       1/30                                       100% Frontera SpA       300


                    TOTAL                                                               3.725


 
 Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

                     
     
 Cordillera Project


      N°        License ID           HCH %             HCH % Earning Area
                                      Held                             (ha)                       Agreement Details


 
 1     ALBORADA III 1/35                      100% Frontera SpA       162        100% HCH Purchase Option Agreement
                                                                                   USD 100,000 already paid
                                                                              US$100,000 payable by November 14th
                                                                                             2026

                                                                                  US$100,000 payable by November 14th
                                                                                                   2027
                                                                            US$3,700,000 payable by November 14th
                                                                                             2028
                                                                            NSR 1% for underground mining and 1,5%
                                                                                      for open-pit mining


 
 2      ALBORADA IV 1/20                      100% Frontera SpA        54


 
 3     ALBORADA VII 1/25                      100% Frontera SpA        95


 
 4           CAT IX 1/30                      100% Frontera SpA       150


 
 5        CATITA IX 1/20                      100% Frontera SpA       100


 
 6       CATITA XII 1/13                      100% Frontera SpA        61


 
 7        CORDILLERA 1/5                      100% Frontera SpA        20


 
 8         HERREROS 1/14                      100% Frontera SpA        28


 
 9     MINA HERREROS III
                       1/6                      100% Frontera SpA        18


 
 10     MINA HERREROS IV
                      1/10                      100% Frontera SpA        23


 
 11        PORSIACA 1/20                      100% Frontera SpA        20


 
 12        QUEBRADA 1/10                      100% Frontera SpA        28


 
 13            VETA 1/17                      100% Frontera SpA        17


                   TOTAL                                                776


 
 Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Qualifying Statements

The scientific and technical information relating to the Company's Costa Fuego project in this report has been derived from or is based on the Costa Fuego Copper project pre-feasibility study (the "Costa Fuego PFS" or 2025 PFS), which has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and Joint Ore Reserves Committee of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (the "JORC Code") and reviewed and approved by the "Qualified Persons" as defined under NI 43-101 and "Competent Persons" as defined under the JORC Code, as set out below. The 2025 PFS was compiled by the Qualified Persons and Competent Persons listed below based on information available up to the effective date of the PFS. Additional details of responsibilities are provided at page 48 of presentation "Costa Fuego Preliminary Feasibility Study March 2025" released on March 27, 2025.

Conceptual Open Pit Shells

Conceptual open pit shells represent Exploration Targets as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code). They are based on completed exploration activities reported in the announcement released 19 May 2025 ('Hot Chili Announces Latest Drill Results for La Verde, Doubling Porphyry Discovery Footprint').

The conceptual open pit shells were generated using copper (Cu) prices of US$3.50/lb Cu and US$6.00/lb Cu on a series of nested Cu grade shells. Other input parameters informing the conceptual open-pit shells (pit slope angles, mining cost, processing cost, etc.) were derived from values reported in the March 2025 Costa Fuego Pre-feasibility Study and are considered appropriate for the style of mineralisation encountered at the La Verde Cu-Au porphyry discovery.

Any potential quantity and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Further exploration activities are detailed in this announcement and include (but may not necessarily be limited to) a program of diamond drill holes aiming to extend the mineralised footprint at La Verde. Drilling commenced on 22 September 2025, with the length of the program dependent on a number of considerations including (but not limited to) the results of the exploration activities and regulatory applications and approvals.

PFS Technical Report

For readers to fully understand the information in this report, they should read the PFS Technical Report available on SEDAR+ (www.sedarplus.ca) and at www.hotchili.net.au in its entirety titled "Costa Fuego Project, Chile, Preliminary Feasibility Study NI 43-101 Technical Report" dated May 9 2025 with an effective date of March 27 2025, including all qualifications, assumptions, limitations and exclusions. The PFS Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The technical information in this report is subject to the assumptions and qualifications to be contained in the PFS Technical Report. The PFS Technical Report replaces and supersedes the technical report titled "Costa Fuego Copper Project - NI 43-101 Technical Report Mineral Resource Estimate Update" dated April 8, 2024, with an effective date of February 26, 2024 (the "2024 PEA").

Qualified Persons - NI 43-101

The PFS was compiled by Wood Australia Pty Ltd with contributions from a team of independent "Qualified Persons" within the meaning of NI 43 -101. The scientific and technical information contained in this report pertaining to Costa Fuego has been reviewed and verified by the following independent qualified persons within the meaning of NI 43-101:

  • Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) of Haren Consulting - Mineral Resource Estimate
  • Mr Dean David (FAUSIMM (CP)) of Wood Pty Ltd - Metallurgy
  • Mr Piers Wendlandt (PE) of Wood Pty Ltd - Market Studies and Contracts, Economic Analysis
  • Mr David Cuello (MAUSIMM) of GMT Servicios de Ingeniería - Geotechnical
  • Mr Jeffrey Stevens (Pr. Eng, MSAIMM) of Wood Pty Ltd - Infrastructure and Capital Cost
  • Mr Luis Bernal (Comisión Minera (PC) Registered Member) of Process Mineral Consulting - Leaching
  • Mr Anton von Wielligh (FAUSIMM) of ABGM Consulting Pty Ltd - Mine Planning and Scheduling
  • Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) of High River Services - Environmental

The above independent Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security, and analytical procedures underlying such information.

Competent Persons - JORC

The information in this report that relates to Mineral Resources, Exploration Results, and Ore Reserves for the Costa Fuego Project is based on information compiled by:

  • Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) who is a full-time employee of Haren Consulting - Mineral Resource Estimate
  • Mr Dean David (FAUSIMM (CP)) who is a full-time employee of Wood Pty Ltd - Metallurgy
  • Mr Piers Wendlandt (PE) who is a full-time employee of Wood Pty Ltd - Market Studies and Contracts, Economic Analysis
  • Mr David Cuello (MAUSIMM) who is a full-time employee of GMT Servicios de Ingeniería - Geotechnical
  • Mr Jeffrey Stevens (Pr. Eng, MSAIMM) who is a full-time employee of Wood Pty Ltd - Infrastructure and Capital Cost
  • Mr Luis Bernal (Comisión Minera (PC) Registered Member) who is a full-time employee of Process Mineral Consulting - Leaching
  • Mr Anton von Wielligh (FAUSIMM) who is a full-time employee of ABGM Consulting Pty Ltd - Mine Planning and Scheduling
  • Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) who is a full-time employee of High River Services - Environmental
  • Mr Christian Easterday (MAIG), who is the Managing Director and is a full-time employee of Hot Chili Limited - Exploration Results

Ms Haren, Mr David, Mr Wendlandt, Mr Cuello, Mr Stevens, Mr Bernal, Mr LaPorte, Mr Easterday, and Mr von Wielligh each have sufficient experience, which is relevant to the style of mineralisation and types of deposits under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the JORC Code and as Qualified Persons under NI43-101.

Disclaimer

This report has been prepared by management of Hot Chili Limited ("Hot Chili" or the "Company") and does not represent a recommendation to buy or sell securities of the Company. Investors should always consult their investment advisors prior to making any investment decisions. This report does not purport to be complete or contain all of the information that may be material to the current or future business, operations, financial condition or prospects of the Company and Hot Chili makes no representation or warranty, express or implied, as to the accuracy or completeness of the information contained in this report. Certain information contained herein is based on, or derived from, information obtained from independent third-party sources, publicly available reports and other trade and industry sources. Hot Chili believes that such information is accurate and that the sources from which it has been obtained are reliable; however, Hot Chili has not independently verified such information and does not assume any responsibility for the accuracy or completeness of such information. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note for U.S. Investors Concerning Mineral Resources

NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning material mineral projects. Technical disclosure contained in this report has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and technical information contained in this report may not be comparable to similar information disclosed by domestic United States companies subject to the SEC's reporting and disclosure requirements.

All amounts in this report are in U.S. dollars unless otherwise noted.

Forward Looking Statements

This report contains certain statements that are "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of applicable Australian securities legislation (collectively, the "forward-looking statements"). Forward-looking statements reflect the Company's current expectations, forecasts, and projections with respect to future events, many of which are beyond the Company's control, and are based on certain assumptions. No assurance can be given that these expectations, forecasts, or projections will prove to be correct, and such forward-looking statements included in this announcement should not be unduly relied upon. Forward-looking information is by its nature prospective and requires the Company to make certain assumptions and is subject to inherent risks and uncertainties. All statements other than statements of historical fact are forward-looking statements. The use of any of the words "capable", "estimate", "expansion", "expectations", "likely", "may", "plan", "potential", "project", "reinforce", "large-scale", "could", "should", "will", "would", variants of these words and similar expressions are intended to identify forward-looking statements.

In this report, forward-looking statements relate, among other things, to: the potential of the La Verde discovery; regulatory applications and approvals; and the Company's future exploration and other business plans.

Forward-looking statements involve known and unknown risks, uncertainties, and other factors, which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. A number of factors could cause actual results to differ materially from a conclusion, forecast or projection contained in the forward-looking statements in this announcement, including, but not limited to, the following material factors: the ability of drilling and other exploration activities to accurately predict mineralisation; operational risks; risks related to the cost estimates of exploration; sovereign risks associated with the Company's operations in Chile; changes in estimates of mineral resources or mineral reserves of properties where the Company holds interests; recruiting qualified personnel and retaining key personnel; future financial needs and availability of adequate financing; fluctuations in mineral prices; market volatility; exchange rate fluctuations; ability to exploit successful discoveries; the production at or performance of properties where the Company holds interests; ability to retain title to mining concessions; environmental risks; financial failure or default of joint venture partners, contractors or service providers; competition risks; economic and market conditions; and other risks and uncertainties described elsewhere in this announcement and elsewhere in the Company's public disclosure record.

Although the forward-looking statements contained in this report are based upon assumptions which the Company believes to be reasonable, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. With respect to forward-looking statements contained in this announcement, the Company has made assumptions regarding: future commodity prices and demand; availability of skilled labour; timing and amount of capital expenditures; future currency exchange and interest rates; the impact of increasing competition; general conditions in economic and financial markets; availability of drilling and related equipment; effects of regulation by governmental agencies; future tax rates; future operating costs; availability of future sources of funding; ability to obtain financing; and assumptions underlying estimates related to adjusted funds from operations. The Company has included the above summary of assumptions and risks related to forward-looking information provided in this announcement to provide investors with a more complete perspective on the Company's future operations, and such information may not be appropriate for other purposes. The Company's actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits the Company will derive therefrom.

For additional information with respect to these and other factors and assumptions underlying the forward-looking statements made herein, please refer to the public disclosure record of the Company, including the Company's most recent Annual Report, which is available on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. New factors emerge from time to time, and it is not possible for management to predict all those factors or to assess in advance the impact of each such factor on the Company's business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in any forward-looking statement.

The forward-looking statements contained in this announcement are expressly qualified by the foregoing cautionary statements and are made as of the date of this announcement. Except as may be required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking statement to reflect events or circumstances after the date of this announcement or to reflect the occurrence of unanticipated events, whether as a result of new information, future events or results, or otherwise. Investors should read this entire announcement and consult their own professional advisors to ascertain and assess the income tax and legal risks and other aspects of an investment in the Company.

Mineral Resource Statement

  1 Mineral Resources are reported on a 100% Basis -combining Mineral Resource Estimates for the Cortadera, Productora, Alice and San Antonio deposits. All figures are rounded, reported to appropriate significant figures and
   reported in accordance with the Joint Ore Reserves Committee Code (2012) and NI 43-101. Mineral Resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice
   Guidelines (29 November 2019) and reported in accordance CIM Definition Standards for Mineral Resources and Mineral Reserves (10 May 2014) that are incorporated by reference into NI 43-101.



 2 Mineral Resources are inclusive of the Mineral Reserve


  3 The Productora deposit is 100% owned by Chilean incorporated company Sociedad Minera El Aguila SpA (SMEA). SMEA is a joint venture (JV) company - 80% owned by Sociedad Minera El Corazón SpA (a 100% subsidiary of Hot Chili),
   and 20% owned by Compañía Minera del Pacífico S.A (CMP).


  4 The Cortadera deposit is controlled by a Chilean incorporated company Sociedad Minera La Frontera SpA (Frontera). Frontera is a subsidiary company - 100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of
   Hot Chili.


  5 The San Antonio deposit is controlled through Frontera (100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of Hot Chili Limited) and Frontera is party to an Option Agreement pursuant to which it can earn
   a 100% interest in the property.


  6 The Mineral Resource Estimates (MRE) in the tables above form coherent bodies of mineralisation that are considered amenable to a combination of open pit and underground extraction methods based on the following parameters:
   Base Case Metal Prices: Copper US$ 3.00/lb, Gold US$ 1,700/oz, Molybdenum US$ 14/lb, and Silver US$20/oz.


  7 All MRE were assessed for Reasonable Prospects of Eventual Economic Extraction (RPEEE) using both Open Pit and Block Cave Extraction mining methods at Cortadera and Open Pit mining methods at the Productora, Alice and San
   Antonio deposits.


  8 Metallurgical recovery averages for each deposit consider Indicated + Inferred material and are weighted to combine sulphide flotation and oxide leaching performance. Process recoveries: Cortadera - Weighted recoveries of 82%
   Cu, 55% Au, 81% Mo and 36% Ag. CuEq(%) = Cu(%) + 0.55 x Au(g/t) + 0.00046 x Mo(ppm) + 0.0043 x Ag(g/t). San Antonio -Weighted recoveries of 85% Cu, 66% Au, 80% Mo and 63% Ag. CuEq(%) = Cu(%) + 0.64 x Au(g/t) + 0.00044 x
   Mo(ppm) + 0.0072 x Ag(g/t) Alice -Weighted recoveries of 81% Cu, 47% Au, 52% Mo and 37% Ag. CuEq(%) = Cu(%) + 0.48 x Au(g/t) + 0.00030 x Mo(ppm) + 0.0044 x Ag(g/t). Productora - Weighted recoveries of 84% Cu, 47% Au, 48%
   Mo and 18% Ag. CuEq(%) = Cu(%) + 0.46 x Au(g/t) + 0.00026 x Mo(ppm) + 0.0021 x Ag(g/t). Costa Fuego - Recoveries of 83% Cu, 53% Au, 71% Mo and 26% Ag. CuEq(%) = Cu(%) + 0.53 x Au(g/t) + 0.00040 x Mo(ppm) + 0.0030 x Ag(g/t)


  9 Copper Equivalent (CuEq) grades are calculated based on the formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm ×
   Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu recovery). The base case cut-off grade for Mineral Resources considered amenable to open pit extraction methods at the Cortadera, Productora, Alice and San
   Antonio deposits is 0.20% CuEq, while the cut-off grade for Mineral Resources considered amenable to underground extraction methods at the Cortadera deposit is 0.27% CuEq. It is the Company's opinion that all the elements
   included in the CuEq calculation have a reasonable potential to be recovered and sold.


  10 Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The MRE include Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied
   to them that would enable them to be categorised as Mineral Reserves. It is reasonably expected that the majority of Inferred mineral resources could be upgraded to Measured or Indicated Mineral Resources with continued
   exploration.


  11 The effective date of the MRE is 26 February 2024. The MRE was previously reported in the 2024 PEA. Hot Chili Limited confirms it is not aware of any new information or data that materially affects the information included
   in the 2024 PEA and all material assumptions and technical parameters stated for the MRE in the 2024 PEA continue to apply and have not materially changed.


  12 Hot Chili Limited is not aware of political, environmental, or other risks that could materially affect the potential development of the Mineral Resources other than as disclosed in the 2025 PFS. A detailed list of Costa
   Fuego Project risks is included in Chapter 25 of the 2025 PFS Technical Report titled "Costa Fuego Copper Project NI43-101 Technical Report Preliminary Feasibility Study" and dated 9 May 2025 (effective 27 March 2025), is
   available on SEDAR+ (www.sedarplus.ca) and the Company's website (www.hotchili.net.au).

Ore Reserve Statement


 1 Mineral Reserves are reported on a 100% Basis - combining Mineral Reserve estimates for the Cortadera, Productora, Alice and San Antonio deposits, and have an effective date of 27 March 2025.


  2 An Ore Reserve (declared in accordance with JORC Code 2012) was previously reported at Productora, a component of Costa Fuego, on 2nd March 2016 on the ASX. The Company was not subject to the requirements of NI 43-101 at that
   time.


  3 Mineral Reserve estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (29 November 2019) and reported in accordance CIM Definition Standards for Mineral
   Resources and Mineral Reserves (10 May 2014) that are incorporated by reference into NI 43-101. Mineral Reserve estimates are in accordance with the JORC Code.  References to "Mineral Reserves" mean "Ore Reserves" as defined
   in the JORC Code and references to "Proven Mineral Reserves" mean "Proved Ore Reserves" as defined in the JORC Code.



 4 The Mineral Reserve reported above was not additive to the Mineral Resource. The Mineral Reserve is based on the 26 February 2024 Mineral Resource.


  5 Tonnages and grades are rounded to two significant figures. All figures are rounded, reported to appropriate significant figures and reported in accordance with the Joint Ore Reserves Committee Code (2012) and NI 43-101. As
   each number is rounded individually, the table may show apparent inconsistencies between the sum of rounded components and the corresponding rounded total.



 6 Mineral Reserves are reported using long-term metal prices of US$4.30/lb Cu, US$2,280/oz Au, US$27/oz Ag, US$20/lb Mo.



 7 The Mineral Reserve tonnages and grades are estimated and reported as delivered to plant (the point where material is delivered to the processing facility) and is therefore inclusive of ore loss and dilution.


  8 The Productora deposit is 100% owned by Chilean incorporated company Sociedad Minera El Aguila SpA (SMEA). SMEA is a joint venture (JV) company - 80% owned by Sociedad Minera El Corazón SpA (a 100% subsidiary of Hot Chili),
   and 20% owned by Compañía Minera del Pacífico S.A (CMP).


  9 The Cortadera deposit is controlled by a Chilean incorporated company Sociedad Minera La Frontera SpA (Frontera). Frontera is a subsidiary company - 100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of
   Hot Chili.


  10 The San Antonio deposit is controlled through Frontera (100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of Hot Chili) and Frontera is party to an Option Agreement pursuant to which it can earn a 100%
   interest in the property.


  11 The Mineral Reserve Estimate as of 27 March 2025 for Costa Fuego was prepared by Anton von Wielligh, Fellow with the AUSIMM (FAUSIMM). Mr. von Wielligh fulfils the requirements to be a "Qualified Person" within the meaning
   of NI 43-101 and is the Competent Person under JORC for the Mineral Reserve.


  12 Hot Chili Limited is not aware of political, environmental, or other risks that could materially affect the potential development of the Mineral Reserves other than as disclosed in the 2025 PFS. A detailed list of Costa
   Fuego Project risks is included in Chapter 25 of the 2025 PFS Technical Report titled "Costa Fuego Copper Project NI43-101 Technical Report Preliminary Feasibility Study" and dated 9 May 2025 (effective 27 March 2025), is
   available on SEDAR+ (www.sedarplus.ca) and the Company's website (www.hotchili.net.au).

Appendix 5B

Mining exploration entity or oil and gas exploration entity
quarterly cash flow report


  Name of entity



 
            Hot Chili Limited



  ABN                           Quarter ended ("current
                                  quarter")


                  91 130 955 725             30 June2026


 
   
    Consolidated statement of cash flows                                                   Current                                Year to
                                                                                                  quarter                                  date
                                                                                                                      $A'000 (12 months)
                                                                                                                                                 $A'000



 1.                                                                          Cash flows from operating activities



 1.1                                           
 Receipts from customers



 1.2                                           
 Payments for


                                                
 (a)  exploration & evaluation


                                                
 (a)  development


                                                
 (b)  production


                                                
 (c)  staff costs                                                                         (755)   (2,987)


                                                
 (d)  administration and corporate costs                                                (1,609)   (5,898)



 1.3                                           
 Dividends received (see note 3)



 1.4                                           
 Interest received                                                                          177        336



 1.5                                           
 Interest and other costs of finance paid



 1.6                                           
 Income taxes paid



 1.7                                           
 Government grants and tax incentives



 1.8                                           
 Other (provide details if material)



 
   1.9                                                      Net cash from /(used in) operating activities                             (2,187)   (8,549)





 
   2.                                        
 
            Cash flows from investing activities



 2.1                                           
 Payments to acquire or for:


                                                
 (a)  entities


                                                
 (b)  tenements                                                                           (215)   (4,234)


                                                
 (c)  property, plant and equipment                                                       (130)     (198)


                                                
 (d)  exploration & evaluation                                                          (7,276)  (18,819)


                                                
 (e)  investments


                                                
 (f)  other non-current assets



 2.2                                           
 Proceeds from the disposal of:


                                                
 (a)  entities


                                                
 (b)  tenements


                                                
 (c)  property, plant and equipment


                                                
 (d)  investments


                                                
 (e)  other non-current assets



 2.3                                           
 Cash flows from loans to other entities



 2.4                                           
 Dividends received (see note 3)



 2.5                                           
 Other (CMP recoup)                                                                                 1,292



 
   2.6                                                      Net cash from /(used in) investing activities                             (7,621)  (21,959)





 
   3.                                        
 
            Cash flows from financing activities

                                                                                                                                                  54,189



 3.1                                             Proceeds from issues of equity securities (excluding convertible
                                                   debt securities)



 3.2                                           
 Proceeds from issue of convertible debt securities



 3.3                                           
 Proceeds from exercise of options



 3.4                                             Transaction costs related to issues of equity securities or
                                                   convertible debt securities                                                             (100)   (3,772)



 3.5                                           
 Proceeds from borrowings



 3.6                                           
 Repayment of borrowings



 3.7                                           
 Transaction costs related to loans and borrowings



 3.8                                           
 Dividends paid



 3.9                                           
 Other (provide details if material)



 
   3.10                                                     Net cash from /(used in) financing activities                               (100)    50,417





 
   4.                                                       Net increase /(decrease) in cash and cash equivalents for the
                                                                period



 4.1                                           
 Cash and cash equivalents at beginning of period                                        35,220      5,189



 4.2                                             Net cash from /(used in) operating activities (item 1.9 above)                         (2,187)   (8,549)



 4.3                                             Net cash from /(used in) investing activities (item 2.6 above)                         (7,621)  (21,959)



 4.4                                             Net cash from /(used in) financing activities (item 3.10 above)                          (100)    50,417



 4.5                                           
 Effect of movement in exchange rates on cash held                                        (364)     (150)



 
   4.6                                                      Cash and cash equivalents at end of period                                 24,948     24,948


 5.                                     Reconciliation of cash and cash equivalents        Current  Previous
                                                                                             quarter  quarter
              at the end of the quarter (as shown in the consolidated statement
               of cash flows) to the related items in the accounts                            $A'000   $A'000



 5.1     
 Bank balances                                                                      8,841     5,428



 5.2     
 Call deposits                                                                     16,107    29,792



 5.3     
 Bank overdrafts



 5.4     
 Other (provide details)



 
   5.5                Cash and cash equivalents at end of quarter (should equal item 4.6
                          above)                                                              24,948    35,220


 6.                                    Payments to related parties of the entity and their associates                                          Current quarter
                                                                                                                                                       $A'000



 6.1      Aggregate amount of payments to related parties and their associates
            included in item 1                                                                                                                              234



 6.2      Aggregate amount of payments to related parties and their associates
            included in item 2



 
   Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.


 7.  
 
             Financing facilities                                                      Total facility Amount drawn
                                                                                                   amount at    at quarter
                                                                                                  quarter end       end
          Note: the term "facility' includes all forms of financing
           arrangements available to the entity. Add notes as necessary
           for an understanding of the sources of finance available to
           the entity.                                                                                  $A'000       $A'000



 7.1 
 Loan facilities



 7.2 
 Credit standby arrangements



 7.3 
 Other (please specify)



 7.4 
 
            Total financing facilities





 7.5 
 
            Unused financing facilities available at quarter end



 7.6   Include in the box below a description of each facility above, including the lender,
         interest rate, maturity date and whether it is secured or unsecured. If any additional
         financing facilities have been entered into or are proposed to be entered into after
         quarter end, include a note providing details of those facilities as well.




 8.                                      Estimated cash available for future operating activities   
          
            
              $A'000



 8.1 
      Net cash from / (used in) operating activities (item 1.9)                                                                     (2,187)



 8.2        (Payments for exploration & evaluation classified as investing activities) (item
              2.1(d))                                                                                                                      (7,276)



 8.3 
      Total relevant outgoings (item 8.1 + item 8.2)                                                                                (9,463)



 8.4 
      Cash and cash equivalents at quarter end (item 4.6)                                                                            24,948



 8.5 
      Unused finance facilities available at quarter end (item 7.5)



 8.6 
      Total available funding (item 8.4 + item 8.5)                                                                                  24,948





 8.7                     Estimated quarters of funding available (item 8.6 divided by item 8.3)                                              2.64


        Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as "N/A". Otherwise, a figure for the estimated quarters of funding available must be included in
         item 8.7.



 8.8        If item 8.7 is less than 2 quarters, please provide answers to the following questions:


             8.8.1     Does the entity expect that it will continue to have the current level of net
              operating cash flows for the time being and, if not, why not?


                                                                                                                                             N/A


             8.8.2     Has the entity taken any steps, or does it propose to take any steps, to raise
              further cash to fund its operations and, if so, what are those steps and how likely does it
              believe that they will be successful?


                                                                                                                                             N/A


             8.8.3     Does the entity expect to be able to continue its operations and to meet its
              business objectives and, if so, on what basis?


                                                                                                                                             N/A


                          Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above
                           must be answered.

Compliance statement

  1. This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
  2. This statement gives a true and fair view of the matters disclosed.

Date: 30 July 2026

Authorised by: By the Board
(Name of body or officer authorising release - see note 4)


 
  Notes



 1.       This quarterly cash flow report and the accompanying activity report provide a basis for
            informing the market about the entity's activities for the past quarter, how they have been
            financed and the effect this has had on its cash position. An entity that wishes to disclose
            additional information over and above the minimum required under the Listing Rules is
            encouraged to do so.



 2.       If this quarterly cash flow report has been prepared in accordance with Australian Accounting
            Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
            Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this
            quarterly cash flow report has been prepared in accordance with other accounting standards
            agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply
            to this report.



 3.       Dividends received may be classified either as cash flows from operating activities or cash
            flows from investing activities, depending on the accounting policy of the entity.



 4.       If this report has been authorised for release to the market by your board of directors, you
            can insert here: "By the board". If it has been authorised for release to the market by a
            committee of your board of directors, you can insert here: "By the [name of board committee -
            eg Audit and Risk Committee]". If it has been authorised for release to the market by a
            disclosure committee, you can insert here: "By the Disclosure Committee".



 5.       If this report has been authorised for release to the market by your board of directors and
            you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate
            Governance Council's Corporate Governance Principles and Recommendations, the board should
            have received a declaration from its CEO and CFO that, in their opinion, the financial
            records of the entity have been properly maintained, that this report complies with the
            appropriate accounting standards and gives a true and fair view of the cash flows of the
            entity, and that their opinion has been formed on the basis of a sound system of risk
            management and internal control which is operating effectively.

View original content to download multimedia:https://www.prnewswire.com/news-releases/hot-chili-quarterly-report---period-ending-30-june-2026-302838627.html

SOURCE Hot Chili Limited

© 2026 Canjex Publishing Ltd. All rights reserved.