12:02:52 EDT Wed 11 Mar 2026
Enter Symbol
or Name
USA
CA



Tocvan Ventures Corp
Symbol TOC
Shares Issued 78,108,954
Close 2026-03-10 C$ 0.90
Market Cap C$ 70,298,059
Recent Sedar+ Documents

Tocvan Ventures appoints Wagner as special adviser

2026-03-11 10:13 ET - News Release

Mr. Brodie Sutherland reports

TOCVAN ANNOUNCES APPOINTMENT OF DARIN WAGNER AS SPECIAL ADVISOR

Tocvan Ventures Corp. has appointed Darin Wagner, PGeo, as special adviser to the company.

Mr. Wagner brings over 35 years of experience in mineral exploration and corporate development, with a proven record of building and leading successful exploration companies. He is a recognized expert in gold systems, including those in mesothermal, epithermal and porphyry environments. Notably, Mr. Wagner co-founded and led West Timmins Mining, which was acquired for $424-million, and Balmoral Resources, acquired for $140-million. He has also held advisory roles with prominent companies such as Mag Silver and Midnight Sun Mining, contributing to significant discoveries and value creation in the mining sector.

In his role as special adviser, Mr. Wagner will provide strategic guidance on exploration strategies, project development and corporate initiatives as Tocvan advances its flagship Gran Pilar gold-silver project toward near-term production. His expertise aligns perfectly with the company's focus on epithermal gold-silver systems in the mining-friendly jurisdiction of Sonora, Mexico.

"We are thrilled to welcome Darin to the Tocvan team," said Brodie Sutherland, chief executive officer of Tocvan. "His exceptional track record in discovering and advancing gold/precious metal deposits in multiple jurisdictions, combined with his experience in corporate growth and M&A [merger and acquisition] will be invaluable as we accelerate our path to production at Gran Pilar. His insights will help us unlock the full potential of our projects and deliver substantial value to our shareholders."

Mr. Wagner commented: "I am excited to join Tocvan as special adviser at this pivotal stage in the company's growth. The Gran Pilar project represents a compelling opportunity in one of Mexico's premier mining districts. There has literally never been a better time to become a gold producer, even at a modest scale, than today. I look forward to working with the team to advance their exploration and development efforts."

This appointment further strengthens Tocvan's technical and strategic advisory capabilities as the company continues to position itself as a leading precious metals explorer in Mexico.

The Gran Pillar project, Sonora, Mexico

100-per-cent-controlled priority targets for trenching and drilling:

  1. South block main zone expansion:
    1. Follow-up on 2025 drill success:
      1. 19.4 grams per tonne Au over 3.1 metres within 106.6 metres of 0.6 g/t Au (Feb. 25, 2025, news release);
      2. 5.4 g/t Au over 6.1 metres within 41.2 metres of 1.0 g/t Au (May 7, 2025, news release);
      3. 136 g/t Ag over 10.7 metres within 42.7 metres of 41 g/t Ag (June 25, 2025, news release);
  2. South block (Nov. 12, 2024, news release):
    1. Placer corridor (900-metre strike length):
      1. Soil samples up to 21.2 g/t Au and greater than 2,000 g/t Ag;
    2. Placer source area:
      1. Soil samples up to 2.4 g/t Au and 22 g/t Ag;
      2. Rock samples up to 7.3 g/t Au and 389 g/t Ag;
  3. North block:
    1. North alteration zone (3.2-kilometre-by-1.5-kilometre area):
      1. Two-metre chip sample -- 5.6 g/t Au and 106 g/t Ag (Oct. 19, 2023, news release);
      2. Historic mine working sample -- 3.2 g/t Au and 1,225 g/t Ag (March 8, 2024, news release).

Gran Pilar drill highlights:

  • 2025 diamond drilling highlights include:
    • 83.5 m of 1.3 g/t Au, including 9.7 m of 10.3 g/t Au (March 11, 2025, news release);
    • 97.4 m of 0.7 g/t Au, including 36.3 m of 1.6 g/t Au (March 19, 2025, news release);
    • 64.9 m of 1.2 g/t Au, including 3.0 m of 21.6 g/t Au and 209 g/t Ag (March 26, 2025, news release);
    • 46.9 m of 0.5 g/t Au, including 2.6 m of 7.2 g/t Au and 80 g/t Ag (April 16, 2025, news release);
  • 2025 reverse circulation drilling highlights include:
    • 106.8 m of 0.6 g/t Au, including 3.1 m of 19.4 g/t Au (Feb. 25, 2025, news release);
    • 41.2 m of 1.0 g/t Au, including 6.1 m of 5.4 g/t Au (May 7, 2025, news release);
  • 2024 RC drilling highlights (all lengths are drilled thicknesses):
    • 42.7 m of 1.0 g/t Au, including 3.1 m of 10.9 g/t Au;
    • 56.4 m of 1.0 g/t Au, including 3.1 m of 14.7 g/t Au;
    • 16.8 m of 0.8 g/t Au and 19 g/t Ag;
  • 2022 phase 3 diamond drilling highlights (all lengths are drilled thicknesses):
    • 116.9 m of 1.2 g/t Au, including 10.2 m of 12 g/t Au and 23 g/t Ag;
    • 108.9 m of 0.8 g/t Au, including 9.4 m of 7.6 g/t Au and five g/t Ag;
    • 63.4 m of 0.6 g/t Au and 11 g/t Ag, including 29.9 m of 0.9 g/t Au and 18 g/t Ag;
  • 2021 phase 2 RC drilling highlights (all lengths are drilled thicknesses):
    • 39.7 m of 1.0 g/t Au, including 1.5 m of 14.6 g/t Au;
    • 47.7 m of 0.7 g/t Au, including three m of 5.6 g/t Au and 22 g/t Ag;
    • 29 m of 0.7 g/t Au;
    • 35.1 m of 0.7 g/t Au;
  • 2020 phase 1 RC drilling highlights (all lengths are drilled thicknesses):
    • 94.6 m of 1.6 g/t Au, including 9.2 m of 10.8 g/t Au and 38 g/t Ag;
    • 41.2 m of 1.1 g/t Au, including 3.1 m of 6.0 g/t Au and 12 g/t Ag;
    • 24.4 m of 2.5 g/t Au and 73 g/t Ag, including 1.5 m of 33.4 g/t Au and 1,090 g/t Ag;
  • 15,000 m of historic core and RC drilling; highlights include:
    • 61.0 m of 0.8 g/t Au;
    • 21.0 m of 38.3 g/t Au and 38 g/t Ag;
    • 13.0 m of 9.6 g/t Au;
    • 9.0 m of 10.2 g/t Au and 46 g/t Ag.

Pilar bulk sample summary:

  • 62-per-cent recovery of gold achieved over 46-day leaching period;
  • Head grade calculated at 1.9 g/t Au and seven g/t Ag; extracted grade calculated at 1.2 g/t Au and three g/t Ag;
  • Bulk sample only included coarse fraction of material (three-fourths of an inch to one-eighth of an inch);
  • Fine fraction (minus one-eighth of an inch) indicates rapid recovery with agitated leach:
    • Agitated bottle roll test returned rapid and high recovery results: 80-per-cent recovery of gold and 94-per-cent recovery of silver after rapid 24-hour retention time.

Additional metallurgical studies:

  • Gravity recovery with agitated leach results of five composite samples returned:
    • 95- to 99-per-cent recovery of gold;
    • 73- to 97-per-cent recovery of silver;
    • Includes the recovery of 99 per cent gold and 73 per cent silver from drill core composite at 120-metre depth.

About Tocvan Ventures Corp.

Tocvan Ventures is a dynamic exploration and development company advancing high-potential gold and silver projects in the mine-friendly jurisdiction of Sonora, Mexico. At its flagship Gran Pilar gold-silver project, Tocvan holds a 100-per-cent interest in over 21 square kilometres of prospective ground, bolstered by the pivotal 2023 land acquisition that provides ample space for scalable mine infrastructure, including a planned 50,000-tonne pilot production facility. The company also maintains a 51-per-cent interest in a one-square-kilometre joint venture area with Colibri Resources, further expanding its footprint. Recent exploration successes, including near surface 3.1 m at 19.4 g/t Au, underscore Gran Pilar's potential as a premier gold-silver asset. Additionally, Tocvan's 100-per-cent-owned Picacho gold-silver project, located in the prolific Caborca trend -- home to some of Mexico's largest gold deposits -- positions the company for further growth. With robust metallurgical results (up to 99-per-cent gold recovery and 97-per-cent silver recovery) and a strategic capital to bolster growth, Tocvan is poised to deliver significant shareholder value in a market buoyed by record-high gold prices. With approximately 59 million shares outstanding, Tocvan is committed to unlocking the full potential of its assets through innovative exploration, strategic development and investor-focused initiatives.

Quality assurance/quality control

Rock and drill samples were shipped for sample preparation to ALS Ltd. in Hermosillo, Sonora, Mexico, and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay with atomic absorption spectroscopy finish. Overlimits for gold (greater than 10 g/t) were analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP finish. Overlimit analyses for silver (greater than 100 g/t) were reassayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising certified reference samples and blank samples were systematically inserted into the sample stream and analyzed as part of the company's robust quality assurance/quality control protocol.

Soil samples were shipped for sample preparation to ALS in Hermosillo, Sonora, Mexico, and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold and multielement analysis of soils was completed by aqua regia digestion and ICP-MS finish using a 50-gram nominal weight. Overlimit gold values greater than one g/t were reassayed with a more robust aqua regia digestion and ICP-MS finish. Overlimit analyses for silver (greater than 100 g/t) were reassayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising blank samples and certified reference materials were systematically inserted into the sample stream and analyzed as part of the company's robust quality assurance/quality control protocol.

Mr. Sutherland, chief executive officer for Tocvan and a qualified person as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this release.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.