Imperial Metals' Red Chris produces 22M lb Cu in Q2

2022-07-20 20:02 ET - News Release

Mr. Brian Kynoch reports

RED CHRIS PRODUCTION AND EXPLORATION UPDATE

Imperial Metals Corp.'s Red Chris metal production (100 per cent) for the second quarter of 2022 was 22.0 million pounds copper and 19,540 ounces gold, up 65 per cent and 62 per cent, respectively, from 13.3 million pounds copper and 12,088 ounces gold produced during the first quarter of 2022.

The improved production was a result of higher throughput (2.6 million tonnes versus 2.0 million tonnes), higher head grades (0.48 per cent copper and 0.39 gram per tonne gold compared with 0.41 per cent copper and 0.36 g/t gold) and higher recoveries (80.5 per cent copper and 60.6 per cent gold versus 72.6 per cent copper and 51.9 per cent gold) in the first quarter.

Imperial's 30-per-cent portion of the second quarter production was 6.6 million pounds copper and 5,862 ounces gold.

Exploration update

Exploration drilling at the East Ridge zone continues to define and expand the high-grade mineralization which remains open to the east and depth. An additional 32 holes were completed during the quarter for a total of 30,482 metres. All exploration holes intersected mineralization. Five dedicated geotechnical holes were also drilled. The East Ridge mineralized corridor (greater than 0.4 per cent copper and greater than 0.4 g/t gold) extends over 900 metres long, up to 1,000 metres high and 125 metres wide, with higher grade (greater than 0.8 per cent copper and greater than 0.8 g/t gold) in several smaller pods over an area 500 metres high, 400 metres long and 100 metres wide.

An exploration target has been defined for East Ridge. The exploration target ranges from a lower tonnage of approximately 170 million tonnes at 0.5 per cent copper and 0.5 g/t gold containing 2.0 billion pounds copper and 2.8 million ounces gold to an upper tonnage of approximately 300 million tonnes at 0.4 per cent copper and 0.4 g/t gold containing 2.9 billion pounds copper and 4.3 million ounces gold. The grades and tonnages are estimates based on continuity of mineralization defined by exploration diamond drilling results (previously reported including relevant sections and plans) with the lower range estimate in the area having a nominal drill hole spacing of 100 metres by 100 metres, and the upper range estimate extended into the area with a nominal drill hole spacing of 100 metres by 200 metres.

The East Ridge exploration target is outside of the current mineral resource estimate. The potential tonnage and grade of the exploration target for East Ridge are conceptual in nature. There has been insufficient exploration to estimate a mineral resource, and it is uncertain if further exploration will result in the estimation of a mineral resource.

Progress toward block cave mining is continuing with the development of the exploration decline having reached 1,703 metres as of July 13, 2022. The feasibility study is expected to be released in the first half of 2023.

Underground drilling of the East Ridge zone from the exploration decline has been initiated. This drilling will focus on extending the East Ridge mineralization to depth and to the east. Drilling from underground will significantly reduce the metreage required to further test the East Ridge and the surface disturbance required to construct drill pads and roads.

Drilling results from the second quarter include hole RC786, which returned 482 metres of 0.43 per cent copper and 0.26 g/t gold from 712 metres, including 32 metres of 0.80 per cent copper and 0.88 g/t gold from 948 metres. This hole is 100 metres above previously reported hole RC773, testing the upward extent of the East Ridge on this section, and confirms the mineralization remains open updip on this section. Hole RC789W was drilled on the same section and returned 154 metres from 1,242 metres of 0.47 per cent copper and 0.46 g/t gold, including 16 metres of 1.2 per cent copper and 1.5 g/t gold from 1,370 metres and 10 metres of 1.5 per cent copper and 2.0 g/t gold also from 1,370 metres. Hole RC789W is located 100 metres below hole RC773 and 100 metres above hole RC779, both of which have been previously reported.

Hole RC795 returned 92 metres of 0.55 per cent copper and 0.41 g/t gold from 1,324 metres including 16 metres from 1,390 metres of 0.97 per cent copper and 0.59 g/t gold. Hole RC795 is 100 metres above previously reported RC785.

Hole RC797 returned 152 metres at 0.41 per cent copper and 0.12 g/t gold from 1,288 metres, and demonstrates the system is present and remains open to the east.

Approximately 50,000 metres of growth-related drilling targeting mineralization definition and continuity is planned for the second half of 2022 with eight drill rigs.

Significant results since the last release are found in the attached table.

Greg Gillstrom, PEng, senior geological engineer with Imperial Metals, is the designated qualified person as defined by National Instrument 43-101 for the Red Chris exploration program, and has reviewed this news release. Red Chris samples for the 2022 drilling reported were analyzed at Bureau Veritas Mineral Laboratories in Vancouver. A full quality assurance/quality control program using blanks, standards and duplicates was completed for all diamond drilling samples submitted to the labs. Significant assay intervals reported represent apparent widths. Insufficient geological information is available to confirm the geological model and true width of significant assay intervals.

About Imperial Metals Corp.

Imperial Metals is a Vancouver-based exploration, mine development and operating company with holdings that include the Mount Polley mine (100 per cent), the Huckleberry mine (100 per cent) and the Red Chris mine (30 per cent). Imperial Metals also holds a portfolio of 23 greenfield exploration properties in British Columbia.